GO2-83-049, Forwards Rev 1 to, Hanford Site Evacuation Time Assessment Study. Study Provides Technical Basis for Info Included in Emergency Preparedness Plan

From kanterella
(Redirected from GO2-83-049)
Jump to navigation Jump to search
Forwards Rev 1 to, Hanford Site Evacuation Time Assessment Study. Study Provides Technical Basis for Info Included in Emergency Preparedness Plan
ML17277A422
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/18/1983
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML17277A423 List:
References
GO2-83-049, GO2-83-49, NUDOCS 8302030346
Download: ML17277A422 (4)


Text

R EGULATORY OFORMATION OISTRIBUTION SYQM (RIBS)

ACCESSION NBR ~ 8302030346 DOC eDATE 83/01/18 NOTARIZED e NO DOCKET FACIL:50-397 NPPSS Nuclear Project<

Unit 2F 1lashington Public Powe 05000397 AUTH,NAME AUTHOR AFFILIATION BAUCHEY<G,D, Nashington Public.Power Supply "'System RECIP,NAME RECIPIENT AFFILIATION SCHNiENCERFAB Licensing Branch 2

SUBJECT:

Forwards "Manford Site Evacuation Time Assessment Study f Rev 1,Study provides technical basis for info included in emergency preparedness

plan, DISTRIBUTION CODE:

8001S COPIES RECEIVED:LTR ENCL X~

SIZE:,

TITLE: Licensing Submittal:,PSAR/FSAR Amdts L Related Correspondence NOTES:

RECIPIENT ID CODE/NAME NRR/DL/ADL NRR L82 LA INTERNAL: ELD/HDS2 IE/DEP EPDS 35 NRR/DE/AEAB NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 24 NRR/DHFS/HFEB40

.NRR/DHFS/OLB 34 NRR/DS I/AE8 26 NRR/DSI/CP8 10

~

NRR/DSI/ICSB 16 NRR/DSI/PSB 19 NRR/DSI/RSB 23 RGN5 EXTERNAL: ACRS 41 DMB/DSS (AMDTS)

LPDR 03 NSIC 05 COPIES LTTR ENCL 1

0 1

0 1

0 1

1 1

0 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

3 6

6 1

1 1

1 1

1 REC IP IENT ID CODE/NAME NRR L82 BC AUI UCKFR ~

01 IE FILE IE/DEP/EPLB 36 NRR/DE/CEB 11 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/GAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DS I/ASB NRR/DSI/CSB 09 NRR/DS I/METB 1'2 D

RAB 22 REG F '4 MI/Ml8 BNL(AMDTS ONLY)

FEMA"REP DIV 39 NRC PDR 02 NTIS COP IES LTTR ENCL 1

0 1

1 1

1 Y3 3

1 1

2 2

1 1

1 1

1 1

1 1

1 0

1 1

1 1

1 1

1 1

1 0

1 1

1 1

1 1

1 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 53 ENCL 46

A j(A "v

iilV (A VVIV V<iVI

."<~1 A

~ C ~ >>AA>>A~

il It (i

L (I '(A i

g',

,(h

Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 January 18, 1983 G02-83-049 Docket No. 50-397 Mr. A. Schwencer, Chief Licensing Branch No.

2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Schwencer:

Subject:

NUCLEAR PROJECT NO.

2 HANFORD SITE EVACUATION TIME ASSESSMENT STUDY Enclosed are sixty (60) copies of the Hanford Site Evacuation Time Assess-ment Study.

This study provides technical basis for information included in the Emergency Preparedness Plan (EPP).

Very truly yours, W~ Ap

Manager, Nuclear Safety and Regulatory Programs jca Enclosure cc:

R Auluck -

NRC WS Chin

- BPA R

Feil NRC Site

~ol 5

go 8 020 0003()7 46 830ii8 PDR ADOCK

-pDR F'

I l