Text
" REGULIAT
(, I >>IFORM>>IATION O'ISTRIBUTIOX STER (RIDS)
ACCESS IO>>'>>I>> i>>IBR: 8201.180480 DOC>>~ DATE: 82/01/08'IOTAR IZEO:
NO DOCKElT'>>>>
FACILI:50-397 APPSS Nuc<l ear P,ro>>jecti Uni t 2i washington Publ ic Powe 05000397 AUTH ~ N AHEI AUTHOR AFF>>ILII'ATI OI>>l BOUCHEiYpG ~
DE
Aa'shington< Pub;1;ic Power Supply System RECAP', NA~1E';
RECIIP>>IEPI>>TI AFF ILIIAT I ON SCHNE>>>>ICERsA ~
l.licensing Branch 2.
SUB>>JECIT:
Submi'ts t ime est imaltes< corresponding t o. soeci f i c>> reasons discussed fo>>r CP extension per
~ 810904 r'equest.
D'ISTRIBUTION CDDEI: 3001S COP>>IES RECEI VED: LITR i>> ENCLI 9 TITLE: PSAR/FSAR=
AMDTS and>> Related Correspondence NOTES:2-copi es>>
all>>1>> mat<i<:Pbl!..
SIZE(:
05000397 RECj;PiIEi>>ITl ID CODE>>/.>>I A>>>>IEI AC;-TION:
A/D I.lICENSNGl LIIC'RI 42.
LIAI COPiIE S RE CZ P I EN Tl COPIES LIT>>TR: ENCLl ID>> CODE'/NA>>HEI LITTR ENCLI L>>ICI BR t>>>>2 BCI 1
- AULUCKiR, 01, 1
INTERNALf; ELD IE</DEPT'EPDB>>
38>>
MPA i>>IRR/DE</EQB>>
13 NRR/DE'/HGEB>>
30 NRR/DE'/>>>>i>>TEB>>
1,7<
NR R /D E'/S'A 8>>
24" NRR/DHFS/HFEB40 NRR/DHFG/Ol 8>> 34" NRR/DS>>i/AEB>>
26'NRR/OS>>I/CPB>>10
>>>>IRR/DS>>I/EIT68>> 12 NRR/DS>>i/PSB" 1,9 NRR/DSiI/RSB>>
23
>>IL 04<
1>>
1.
3 2.
1>>
1 1.
]
1<
1 1<
1 1.
1.
1 1<
I 1.
1<
IE'6 IE</DEP'/EPL8>>
36 NRR/DE/CES 11 NRR/DE'/GB>>
28 NRR/DE/MEB:
18 NRR/DE</QAB>>
21 NRR/DE/SEB 25 NRR/DHF6/LQB< 32 NRR/DHFS/P<TR820 NRR/DS I/ASS>>
27 NRR/DSI/CSB>>
09 NRR/DSI/IC88>> ib I>>IRR/DS I /RAB>>
22 i>>IRR/DST/LGB>>
33 3
3 1
2 1
1 1
1 1,
1 1
1 1.
1 1
EXTERNALI: ACRS 4'1 FEI>>>>IA"REP>> O'IV, 39 NRC, PORt 02."
l>>ITI S 16 1
l.
1.
Bi>>ILI(AI>>IDTS>> ONLt>>')
LPDR 03 NSIC>>
05>>
~5 8
TOTALI NUilSER Or( COP>>IE6 REAO'IREOI:
I.ITTR ENCLI
8 P
l
820ii80480 820i08 t
PDR ADOCK 05000397 A
PDR Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 January 8,
1982 G02-82-13 SS-L-02-RMN-82-001 Docket No. 50-397 Mr. A. Schwencer, Director Licensing Branch No.
2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555
~@9 Dg~
/>
Dear Mr. Schwencer:
Subject:
Reference:
NUCLEAR PROJECT NO.
2 ADDITIONAL INFORMATION IN SUPPORT OF THE REQUEST FOR EXTENSION OF CONSTRUCTION COMPLETION DATE Letter (G02-81-276),
GD Bouchey (SS) to HR Denton (NRR), "Extension of Construction Completion Date", dated September 4,
1981 On January 7,
- 1982, R.M. Nelson,
- Manager, Project Licensing, WNP-2, and H.A. Crisp,
- Manager, Construction, WNP-2, of Washington Public Power Supply System had a telecon conference call with Mr. Raj Auluck, WNP-2 Project Manager, NRR.
In summary, the following time estimates are pro-vided to correspond to the specific reasons discussed for the construction permit extension per our referenced request.
~
Construction delays and loss of productivity-(06/80 06/81)
(06/80 - 12/81)
~ Strikes-(06/80 - 11/80) 12 mos.
Work stoppages 6 mos.
Lowered productivity due to WBG document problems and change of mechanical contractors 2 mos. Reanalysis of work to go 5 mos. Concurrent with above delays, but some impact on time extension re-quested.
ggo 0
Mr. A. Schwencer Page Two January 8,
1982 602-82-13
~
Design changes, delays in material delivery and TMI action items-7 mos.
(Conservative)
If we can be of further assistance, please do not hesitate to contact R.M. Nelson,
- Manager, Project Licensing, WNP-2.
Very truly yours, G.
D. Bouchey Deputy Director, Safety and Security RMN/jca cc:
R Auluck -
NRC WS Chin BPA R
Feil NRC Site
I'll~~