ML17276A886

From kanterella
Jump to navigation Jump to search
Submits Time Estimates Corresponding to Specific Reasons Discussed for CP Extension Per 810904 Request
ML17276A886
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/08/1982
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schwencer A
Office of Nuclear Reactor Regulation
References
GO2-82-13, NUDOCS 8201180480
Download: ML17276A886 (6)


Text

" REGULIAT

(, I >>IFORM>>IATION O'ISTRIBUTIOX STER (RIDS)

ACCESS IO>>'>>I>> i>>IBR: 8201.180480 DOC>>~ DATE: 82/01/08'IOTAR IZEO:

NO DOCKElT'>>>>

FACILI:50-397 APPSS Nuc<l ear P,ro>>jecti Uni t 2i washington Publ ic Powe 05000397 AUTH ~ N AHEI AUTHOR AFF>>ILII'ATI OI>>l BOUCHEiYpG ~

DE

Aa'shington< Pub;1;ic Power Supply System RECAP', NA~1E';

RECIIP>>IEPI>>TI AFF ILIIAT I ON SCHNE>>>>ICERsA ~

l.licensing Branch 2.

SUB>>JECIT:

Submi'ts t ime est imaltes< corresponding t o. soeci f i c>> reasons discussed fo>>r CP extension per

~ 810904 r'equest.

D'ISTRIBUTION CDDEI: 3001S COP>>IES RECEI VED: LITR i>> ENCLI 9 TITLE: PSAR/FSAR=

AMDTS and>> Related Correspondence NOTES:2-copi es>>

all>>1>> mat<i<:Pbl!..

SIZE(:

05000397 RECj;PiIEi>>ITl ID CODE>>/.>>I A>>>>IEI AC;-TION:

A/D I.lICENSNGl LIIC'RI 42.

LIAI COPiIE S RE CZ P I EN Tl COPIES LIT>>TR: ENCLl ID>> CODE'/NA>>HEI LITTR ENCLI L>>ICI BR t>>>>2 BCI 1

AULUCKiR, 01, 1

INTERNALf; ELD IE</DEPT'EPDB>>

38>>

MPA i>>IRR/DE</EQB>>

13 NRR/DE'/HGEB>>

30 NRR/DE'/>>>>i>>TEB>>

1,7<

NR R /D E'/S'A 8>>

24" NRR/DHFS/HFEB40 NRR/DHFG/Ol 8>> 34" NRR/DS>>i/AEB>>

26'NRR/OS>>I/CPB>>10

>>>>IRR/DS>>I/EIT68>> 12 NRR/DS>>i/PSB" 1,9 NRR/DSiI/RSB>>

23

>>IL 04<

1>>

1.

3 2.

1>>

1 1.

]

1<

1 1<

1 1.

1.

1 1<

I 1.

1<

IE'6 IE</DEP'/EPL8>>

36 NRR/DE/CES 11 NRR/DE'/GB>>

28 NRR/DE/MEB:

18 NRR/DE</QAB>>

21 NRR/DE/SEB 25 NRR/DHF6/LQB< 32 NRR/DHFS/P<TR820 NRR/DS I/ASS>>

27 NRR/DSI/CSB>>

09 NRR/DSI/IC88>> ib I>>IRR/DS I /RAB>>

22 i>>IRR/DST/LGB>>

33 3

3 1

2 1

1 1

1 1,

1 1

1 1.

1 1

EXTERNALI: ACRS 4'1 FEI>>>>IA"REP>> O'IV, 39 NRC, PORt 02."

l>>ITI S 16 1

l.

1.

Bi>>ILI(AI>>IDTS>> ONLt>>')

LPDR 03 NSIC>>

05>>

~5 8

TOTALI NUilSER Or( COP>>IE6 REAO'IREOI:

I.ITTR ENCLI

8 P

l

820ii80480 820i08 t

PDR ADOCK 05000397 A

PDR Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 January 8,

1982 G02-82-13 SS-L-02-RMN-82-001 Docket No. 50-397 Mr. A. Schwencer, Director Licensing Branch No.

2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

~@9 Dg~

/>

Dear Mr. Schwencer:

Subject:

Reference:

NUCLEAR PROJECT NO.

2 ADDITIONAL INFORMATION IN SUPPORT OF THE REQUEST FOR EXTENSION OF CONSTRUCTION COMPLETION DATE Letter (G02-81-276),

GD Bouchey (SS) to HR Denton (NRR), "Extension of Construction Completion Date", dated September 4,

1981 On January 7,

1982, R.M. Nelson,
Manager, Project Licensing, WNP-2, and H.A. Crisp,
Manager, Construction, WNP-2, of Washington Public Power Supply System had a telecon conference call with Mr. Raj Auluck, WNP-2 Project Manager, NRR.

In summary, the following time estimates are pro-vided to correspond to the specific reasons discussed for the construction permit extension per our referenced request.

~

Construction delays and loss of productivity-(06/80 06/81)

(06/80 - 12/81)

~ Strikes-(06/80 - 11/80) 12 mos.

Work stoppages 6 mos.

Lowered productivity due to WBG document problems and change of mechanical contractors 2 mos. Reanalysis of work to go 5 mos. Concurrent with above delays, but some impact on time extension re-quested.

ggo 0

Mr. A. Schwencer Page Two January 8,

1982 602-82-13

~

Design changes, delays in material delivery and TMI action items-7 mos.

(Conservative)

If we can be of further assistance, please do not hesitate to contact R.M. Nelson,

Manager, Project Licensing, WNP-2.

Very truly yours, G.

D. Bouchey Deputy Director, Safety and Security RMN/jca cc:

R Auluck -

NRC WS Chin BPA R

Feil NRC Site

I'll~~