ML17276A177

From kanterella
Jump to navigation Jump to search
Forwards Minutes from Mechanical Engineering Branch 810929-30 & 1001 Meetings in Woodbury,Ny & 811016 Preservice Insp Meeting in Washington,Dc.Agenda Items from Both Meetings & Subsequent Resolution Encl
Date released: 06/27/2018 Download: ML17276A177


Responds to 800805 Ltr Re Actions Taken to Preclude Cracking of Jet Pump Holddown Beams.Reducing Tension Preload to 25 Kips on Beams Provides Adequate long-term Solution
ML17276A181
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/04/1980
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: TEDESCO R L
Office of Nuclear Reactor Regulation
References
Download: ML17276A181 (48)
Presentation on Number of OBE Fatigue Cycles for BWR NSSS Design (Except Piping).
ML17276A180
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/15/1981
From: Henrie D
GENERAL ELECTRIC CO.
To:
References
Download: ML17276A180 (110)
Documents 810915 Meeting in Bethesda,Md Re Generic Study in Support of Use of 10 Peak OBE Cycles
ML17276A179
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/17/1981
From: Artigas R
GENERAL ELECTRIC CO.
To: BOSNAK R
Office of Nuclear Reactor Regulation
References
Download: ML17276A179 (2)
Forwards Minutes from Mechanical Engineering Branch 810929-30 & 1001 Meetings in Woodbury,Ny & 811016 Preservice Insp Meeting in Washington,Dc.Agenda Items from Both Meetings & Subsequent Resolution Encl
ML17276A176
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/02/1981
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: SCHWENCER A
Office of Nuclear Reactor Regulation
References
Download: ML17276A176 (4)