IE Mgt Meeting Repts 50-397/81-18,50-460/81-08,50-513/81-08, 50-508/81-08 & 50-509/81-16 on 810916-17.Major Areas Discussed:Nrc Regional Evaluation of Licensee Performance (Systematic Assessment of Licensee Performance Program)
ML17276A158
Person / Time
Site: Columbia, Washington Public Power Supply System, Satsop  Energy Northwest icon.png
Issue date: 10/22/1981
From: Dodds R, Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML17276A157 List:
References
50-397-81-18, 50-460-81-08, 50-460-81-8, 50-508-81-08, 50-508-81-8, 50-509-81-16, 50-513-81-08, 50-513-81-8, NUDOCS 8111020513
Download: ML17276A158 (8)


See also: IR 05000397/1981018

Text

0:

'

geport

No.

licensee:

,'.S.

NUCLEAR REGULATORY .COMMISSION

.. OFFICE

OF'~ INSPECTION 'AND ENFORCEMENT

If

'$

e

50-397/81-'19'0-460/81-08..

~,

50-513/81-08-

50-508/81-08

." 'g,

';-'=-"

4

CPPR

93>>

134'0-509/81=16..',

.-'Licens'e No.-374,

-'154',- -155

pr

I

Washin ton Publ;io Power

Su

1

S

stem'.

0.

Box 968"-'I

Richland,

Washington

99352

Safeguards

Group

Facility Name:

Washington Nuclear Project Nos.

2, 1, 4,

3,

8

5

ALP-.Management Meetings:

meetings

Conducted:

Supply System Office, Richland,

Washington

September

16-3.7, 3.981

Report by:

R.,T.

Dodds, Chief Reactor Project Section

2,

RCPB

te

gned

Approved by:

B.

H. Fau]kenberry,

Chief, Reactor Construction

Projects

Branch

lo? z

D

e

gn d.

Summary:

Licensee

performance

evaluation meetings

were held with management

and

principal staff for each of the three nuclear project sites

and with

WPPSS Senior Management

on September

16-17,

1981, at the Supply System

office, Richland, Washington.

The purpose of the meetings

was to

appraise

WPPSS

Management of the

NRC Regional

Evaluation of Licensee

- Performance for the period of May 1980 through June

1981 (Unit 2), August 1980

through June

1981 (Units

1 and 4),

and September

1980 through June

1981

(Units

3 and 5).

I

I

4

I

Il

I

fy

7I

I

I

I'7

tf

77. f, ~

~ia7em

I>

I

L I

7,7

If

W

Ll

. '7fr ~ p

r

4

~ ~ ~ ~

r--7I

LI

~

~

Ii

cf

7'

77

71 l-

)

I

'7

i

'\\

f

~

~

DETAILS

Meetin

Attendees

Washin ton Public Power

Su

1

S stem

WPPSS

Manager'

~Su~ac

MNP-2

MNP-1/a

MNP-3/5

R. L. ferguson,

Managing Direc'tor,

WPPSS

'

R.

B. Glasscock,

Director, Quality Assurance,

WPPSS

X

G.

D. Bouchey, Director Nuclear Safety,

WPPSS

X

K. T. Perkins, Director,

Power Generation,

WPPSS

X

R.

Nowakowski, Public Relations,

WPPSS

X

R.

G. Hatlock,

Program Director,

WNP-2

'

W.

C. Bibb, Project Manager,

WNP-2

R.

T. Johnson,

Manager, Quality Assu'rance,

WNP-2

J.

D. Martin, Plant Manager,

WNP-2

D.

W. Mazur,

Program Director,

WNP-1/4

X

A.

D. Kohler, Jr.,

Deputy Program Director,

WNP-3/4

J.

P.

Thomas, Asst.

Program Director, Construction,

WNP-3./4

R.

E. Smith, Asst.

Program Director, Operations,

WNP-1/4

C.

B. Organ, Asst.

Program Dire'ctor, Engineering,

WNP- I/4

F.

C.

Hood, Manager, Quality Assurance

8 Safety,

, s

WNP-1/4

C.

R.

Edwards,

Manager, Quality Assurance

R.

S. Leddick,

Program Director, WNP-3/5:

D.

E.

Dobson, Project Manager,,WNP-3/5... ',;,X

J.

H.

Kovacs, Asst.

Project Quality,

Assurance

Manager,

WNP-3/5

J.

A. Puzauskos,

Quality Assurance

Engineering

Super visor

X

.X

X

X

X

X

X

X

Bechtel

Power Cor oration

~

1

v

i

1

T. A. Hangelsdorf,

Project Manager,

WNP-2'.

C. McKillip, Manager of Projects

and

Constructors

Ebasco

$ . H. Cutrano,

Manager, Quality Assurance,

WNP-3/5

D. L.

Quamme,

Project General

Manager

I ~

Il

4

I'

l

I

{

n

I

I

i

Il lt

I

1

l

II

n

I

I

ll,

t

r

1I'

g1

1

I.

~

~ I

U

KI

C

I

I

/0

I

II

l

I

I",

(I

I

I

I'I I

II

tl

1,

I

l

fI

lp

!

l

0

-2-

H

u

I'

l e

-,

~

~

I

Nuclear

Re ulator

Commission

I

Ij

u

R.

H. Engelken,.Director,

Region

V

J.

L. Crews, 'Directo'r, .Division of Resident

'Beyctpr1-Project

.and Engineering Inspection

B.

H. Fpulkenberry, Chief, Reactor Construction

Py'ojects

Branch '

R. T. Dodds, Chief, Reactor. Projects Section

2-'.

P. Haist,

Reactoi

Inspector

A. D. Toth, Senior Resident

Reactor Inspector

P.

P. Narbut,

Reactor

Inspector

H. Wilbur, Chief, Reactor Projects Section,

18E

R.

W. Hernan,

Project Manager,

NRR

R. Auluck, Project Manager,

NRR

Dthers

Manager'

~Sumaar

WNP-2

WNP-1/4

WNP-3/5

X

X

X

X

X

X

Representatives

from Bonnevi]e Power Administration and

the State of Washington's

Engineering Facility Site Evaluation

Council also attended all meetings.

2.

Re ion V Presentation

The Region

V Director and members of his staff discussed

the results of

the Regional

Performance

Evaluation

(SALP Cycle II) for the WNP-2,

1/4 and 3/5 projects covering the periods of Nay 1980 through June

3981 (Unit. 2), August 1980 through June 3981 (Units 1 and 4), and

September

1980 through June

1981 (Units 3 and 5).

The topics

discussed

included:

Description of changes

in NRC's Systematic Assessment

of

Licensee

Performance

(SALP) program

Summitry of findings of current review

Enforcement History

Reportable

Events

Inspection Findings

Status. of,licensee Pctions Resu]ting from

Previous

SALP Appraisals

NRR Performance

Evaluation

Principal

Items of Concern

The Region

Y staff recognized

the corrective actions that have

been

taken

by Mr. Ferguson

and his staff, at each of the three sites

and

at the- Corporate Office.

The Region

V staff stated

the corrective

actions

should result in significant improvements in past identified

problem areas;

however,

Region

V will continue to closely monitor

0

t

~~(It

'I

Q>%f')II

$'g [itlif'I)<

l

p 't

I>>

5'1

>

site and corporate activities to determine actual

improvements that

are made.

~

3.

~WPPtt

Messrs.

Ferguson,

Matlock, Hazur and .Leddick acknowledged

and

J'esponded

to the principal items of concern,

indicating that attention

would be continued in these

areas

to improve performance.

~

'f

0

0

~ 4

A

1

'

I

!

l

t'

't

I(

lh