ML17276A158
| ML17276A158 | |
| Person / Time | |
|---|---|
| Site: | Columbia, Washington Public Power Supply System, Satsop |
| Issue date: | 10/22/1981 |
| From: | Dodds R, Faulkenberry B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML17276A157 | List: |
| References | |
| 50-397-81-18, 50-460-81-08, 50-460-81-8, 50-508-81-08, 50-508-81-8, 50-509-81-16, 50-513-81-08, 50-513-81-8, NUDOCS 8111020513 | |
| Download: ML17276A158 (8) | |
See also: IR 05000397/1981018
Text
0:
'
geport
No.
licensee:
,'.S.
NUCLEAR REGULATORY .COMMISSION
.. OFFICE
OF'~ INSPECTION 'AND ENFORCEMENT
If
'$
e
50-397/81-'19'0-460/81-08..
~,
50-513/81-08-
50-508/81-08
." 'g,
';-'=-"
4
CPPR
93>>
134'0-509/81=16..',
.-'Licens'e No.-374,
-'154',- -155
pr
- I
Washin ton Publ;io Power
Su
1
S
stem'.
0.
Box 968"-'I
Richland,
99352
Safeguards
Group
Facility Name:
Washington Nuclear Project Nos.
2, 1, 4,
3,
8
5
ALP-.Management Meetings:
meetings
Conducted:
Supply System Office, Richland,
September
16-3.7, 3.981
Report by:
R.,T.
Dodds, Chief Reactor Project Section
2,
te
gned
Approved by:
B.
H. Fau]kenberry,
Chief, Reactor Construction
Projects
Branch
lo? z
D
e
gn d.
Summary:
Licensee
performance
evaluation meetings
were held with management
and
principal staff for each of the three nuclear project sites
and with
WPPSS Senior Management
on September
16-17,
1981, at the Supply System
office, Richland, Washington.
The purpose of the meetings
was to
appraise
Management of the
NRC Regional
Evaluation of Licensee
- Performance for the period of May 1980 through June
1981 (Unit 2), August 1980
through June
1981 (Units
1 and 4),
and September
1980 through June
1981
(Units
3 and 5).
I
I
4
I
Il
I
fy
7I
I
I
I'7
tf
77. f, ~
~ia7em
I>
I
L I
7,7
If
W
Ll
. '7fr ~ p
r
4
~ ~ ~ ~
r--7I
~
~
Ii
cf
7'
77
71 l-
)
I
'7
i
'\\
f
~
~
DETAILS
Meetin
Attendees
Washin ton Public Power
Su
1
S stem
Manager'
~Su~ac
MNP-2
MNP-1/a
MNP-3/5
R. L. ferguson,
Managing Direc'tor,
'
R.
B. Glasscock,
Director, Quality Assurance,
X
G.
D. Bouchey, Director Nuclear Safety,
X
K. T. Perkins, Director,
Power Generation,
X
R.
Nowakowski, Public Relations,
X
R.
G. Hatlock,
Program Director,
WNP-2
'
W.
C. Bibb, Project Manager,
WNP-2
R.
T. Johnson,
Manager, Quality Assu'rance,
WNP-2
J.
D. Martin, Plant Manager,
WNP-2
D.
W. Mazur,
Program Director,
WNP-1/4
X
A.
D. Kohler, Jr.,
Deputy Program Director,
WNP-3/4
J.
P.
Thomas, Asst.
Program Director, Construction,
WNP-3./4
R.
E. Smith, Asst.
Program Director, Operations,
WNP-1/4
C.
B. Organ, Asst.
Program Dire'ctor, Engineering,
WNP- I/4
F.
C.
Hood, Manager, Quality Assurance
8 Safety,
, s
WNP-1/4
C.
R.
Edwards,
Manager, Quality Assurance
R.
S. Leddick,
Program Director, WNP-3/5:
D.
E.
Dobson, Project Manager,,WNP-3/5... ',;,X
J.
H.
Kovacs, Asst.
Project Quality,
Assurance
Manager,
WNP-3/5
J.
A. Puzauskos,
Quality Assurance
Engineering
Super visor
X
.X
X
X
X
X
X
X
Bechtel
Power Cor oration
~
1
v
i
1
T. A. Hangelsdorf,
Project Manager,
WNP-2'.
C. McKillip, Manager of Projects
and
Constructors
Ebasco
$ . H. Cutrano,
Manager, Quality Assurance,
WNP-3/5
D. L.
Quamme,
Project General
Manager
I ~
Il
4
I'
l
I
{
n
I
I
i
Il lt
I
1
l
II
n
I
I
ll,
t
r
1I'
g1
1
I.
~
~ I
U
KI
C
I
I
/0
I
II
l
I
I",
(I
I
I
I'I I
II
tl
1,
I
l
fI
lp
!
l
0
-2-
H
u
I'
l e
-,
~
~
I
Nuclear
Re ulator
Commission
I
Ij
u
R.
H. Engelken,.Director,
Region
V
J.
L. Crews, 'Directo'r, .Division of Resident
'Beyctpr1-Project
.and Engineering Inspection
B.
H. Fpulkenberry, Chief, Reactor Construction
Py'ojects
Branch '
R. T. Dodds, Chief, Reactor. Projects Section
2-'.
P. Haist,
Reactoi
Inspector
A. D. Toth, Senior Resident
Reactor Inspector
P.
P. Narbut,
Reactor
Inspector
H. Wilbur, Chief, Reactor Projects Section,
18E
R.
W. Hernan,
Project Manager,
R. Auluck, Project Manager,
Dthers
Manager'
~Sumaar
WNP-2
WNP-1/4
WNP-3/5
X
X
X
X
X
X
Representatives
from Bonnevi]e Power Administration and
the State of Washington's
Engineering Facility Site Evaluation
Council also attended all meetings.
2.
Re ion V Presentation
The Region
V Director and members of his staff discussed
the results of
the Regional
Performance
Evaluation
(SALP Cycle II) for the WNP-2,
1/4 and 3/5 projects covering the periods of Nay 1980 through June
3981 (Unit. 2), August 1980 through June 3981 (Units 1 and 4), and
September
1980 through June
1981 (Units 3 and 5).
The topics
discussed
included:
Description of changes
in NRC's Systematic Assessment
of
Licensee
Performance
(SALP) program
Summitry of findings of current review
Enforcement History
Reportable
Events
Inspection Findings
Status. of,licensee Pctions Resu]ting from
Previous
SALP Appraisals
NRR Performance
Evaluation
Principal
Items of Concern
The Region
Y staff recognized
the corrective actions that have
been
taken
by Mr. Ferguson
and his staff, at each of the three sites
and
at the- Corporate Office.
The Region
V staff stated
the corrective
actions
should result in significant improvements in past identified
problem areas;
however,
Region
V will continue to closely monitor
0
t
~~(It
'I
Q>%f')II
$'g [itlif'I)<
l
p 't
I>>
5'1
>
site and corporate activities to determine actual
improvements that
are made.
~
3.
~WPPtt
Messrs.
Ferguson,
Matlock, Hazur and .Leddick acknowledged
and
J'esponded
to the principal items of concern,
indicating that attention
would be continued in these
areas
to improve performance.
~
'f
0
0
~ 4
A
1
'
I
!
l
t'