UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 OCT 7
1981 MEMORANDUM FOR:
A. Schwencer, Chief Licensing Branch No. 2; DL FROM:
SUBJECT'ATE
& TIME:
LOCATION:
R. Auluck, Project Manager Licensing Branch No. 2, DL FORTHCOMING MEETING WITH WASHINGTON PUBLIC POWER SUPPLY SYSTEM (WPPSS)
Monday; Tuesday, 8 Wednesday,'ctober 19, 20, 8 21, 1981 9:00 AN WPPSS Headquarters Richland, Washington PURPOSE:
W. Lovelace, R, Auluck WPPSS R. Nelson, et. al.
Caseload Forecast Panel Meeting and Site Visit (See attached agenda}
PARTICIPANTS:
NRC
Attachment:
Agenda cc:
See next page R. Auluck, Project Manager Licensing Branch No, 2
Division of Licensing Bii0190949 Bii007 PDR ADOCK 0500039'7I I~A
- PDR,
~
~
~
r
~
~
'I c ~
II S
OCT 7
1981 Mr. R.
L. Ferguson Managing Director Washington Public Power Supply System P. 0.
Box 968 3000 George Washington Way
- Richland, Washington 99352 ccs:
Nicholas
- Reynolds, Esq.
Debevoise 8 Liberman 1200 Seventeenth
- Street, N.
W.
Washington, D.
C.
20036 Richard Q. Quigley, Esq.
Washington Public Power Supply System P. 0.
Box 968
- Richland, Washington 99352 Nicholas Lewis, Chairman Energy Facility Site Evaluation Council 820 East Fifth Avenue Olympis, Washington 98504 Mr. Albert D. Toth Resident Inspector/WPPSS-2 NPS c/o U.S. Nuclear Regulatory Commission P. 0.
Box 69
- Richland, Washington 99352 Roger Nelson, Licensing Manager Washington Public Power Supply System P. 0.
Box 968
- Richland, Washington 99352 Mr. 0.
K. Earle, Project Licensing Supervisor Burns and
- Roe, Incorporated 601 Williams Boulevard
- Richland, Washington 99352
t i
CASELOAD FORECAST PANEL SITE VISIT MEETING AGENDA l.
Overview of project construction schedule including progress and major milestones completed, current problems and any anticipated problem areas that may impact the current projected fuel load date.
2.
Detailed review and current status of design and engineering effort (by major discipline) including any potential problems that may arise from necessary rework.
3.
Detailed review and current status of procurement activities including valves, pipe, instruments,
- cable, major components, etc.
4.
Actual and proposed craft work force (by major craft), craft availability, productivity, potential labor negotiations and problems.
5.
6.
7.
Detailed review and current status of all large and small bore pipe hangers, restraints,
- snubbers, etc., including design, rework, procurement, fabrication, delivery and instal=lation
~ September 30 1981.
Detailed review of project schedule identifying critical path
- items, near critical items, amount of float for various activities, the current critical path to fuel loading, methods of implementation of corrective action for any activities with negative float, and provisions for contingencies.
The estimated project percent complete as of kvsenbe=39-,-=-~CA..~:"--~.-
Detailed review and current status of bulk quantities including current estimated quantities, quantities installed to date, quantities scheduled to date, current percent complete for
- each, actual versus forecast installation rates, and basis for figures.
(a)
Concrete (CY)
(b$
process pipe (LF)
Large Bore Pipe (2 1/2" and larger)
Small Bore Pipe, (2" and smaller)
(c)
Yard Pipe (LF)
(d)
Large Bore Pipe Hangers, Restraints, Snubbers (ea)
~
~
~ n f?
&I <<5 O'
(e)
Small Bore Pipe Hangers, Restraints (ea)
(f)
Cable Tray (LF)
(g)
Total Conduit (LF)
(h)
Total Exposed Metal Conduit '(LF)
(i)
Cable (LF) power Control Security Instrumentation Plant Lighting (j )
Terminations (ea) power Control Security Instrumentation Plant Lighting (k)
Electrical Circuits (ea)
Power Control Security (1)
Instrumentation (ea) 8.
Detailed review and current status of preparation of preop and acceptance test procedures, integration of preop and acceptance test activities with construction
- schedule, system turnover schedule, preop and acceptance tests
- schedule, current and proposed preop and acceptance tests program manpower.
(a)
Total number of procedures required for fuel load.
(b)
Number of draft procedures not started.
(c)
Number of draft procedures being written.
(d)
Number of procedures approved.
(e)
Number of procedures in review.
(f)
Total number of preop and acceptance tests required for fuel load.
(g)
Number of preop and acceptance tests completed.
(h)
Number of preop and acceptance tests currently in progress.
(i)
Numb'er of systems turned over to start-up.
9.
Detailed discussion of potential schedular influence due to changes attributed to NUREG-0737 arid other recent licensing requirements.
10.
Discussion of schedular impact, if any, regarding potential deficiencies reported in accordance with 10 CFR 50.55(e) 11.
Financial commitments to complete the plant,.
12.
Overview of current construction management organization and activities, 13.
Site tour and observation of construction activities.
k 14.
Discussion of schedular impact, if any, due to reverification program.
15.
Discussion of schedular impact, if any, due to construction flushing prerequists such as completion of the suppression pool, etc.
16.
Discussion of Mechanical Contractors Documentation review program as it relate/ to the remaining work scope and any potential schedular impact.
~
fy 4
(
1 r
J1
. tKFI!IlGJIO~
~
~
IBILIIQ DATED l
'.7 Docket File(s) h Local PDR Branch Reading File NSIC TERA TIC'.
G.
Case D.
G. Eisenhut/R.
P
-N. Hughes T. Novak S.
Varga T. Ippolito R. A. Clark J.
F. Stolz
{ORB=::4)
R. Tedesco B. J.
Youngblood A. Schwencer F. Hiraglia E.
Adensam (LB84)
J.
R. Miller G. Lainas D. H. Crutchfield B. T. Russell J. Olshinski R.
H. Yollmer R. J. Hattson..=
S.
H. Hanauer T. Hurley.
J.
P. Knight W. Johnston (AD/Hat D.
R. tiull'er P.
S.
Check M.
E. Kreger L. S.
Rubenstein F. Schroeder H. L. Ernst ACRS (16)
OI&E {3)
OSD (7)
- Attorney, OELD J.
- LeDoux, I&E V. moore B. Grimes urpl e erials
& gualif. Engr)
I&E Region I I&E Region II IEE Region III I&E Region IY I&E Region Y
NRC Partici ants:
bcc:
Applicant Service List Branch Licensing Branch No.
2 Project Hanger
~