GO2-81-292, Forwards Qualification & Staffing Level Charts of Offsite Managers & Technical Staff,Per Agenda Item 5 from R Auluck 810731 Memo.Info Provided in Preparation for 810924 Meeting W/Nrc.Details Will Be Provided in FSAR Chapter 13 Submittal

From kanterella
(Redirected from ML17275B245)
Jump to navigation Jump to search
Forwards Qualification & Staffing Level Charts of Offsite Managers & Technical Staff,Per Agenda Item 5 from R Auluck 810731 Memo.Info Provided in Preparation for 810924 Meeting W/Nrc.Details Will Be Provided in FSAR Chapter 13 Submittal
ML17275B245
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/16/1981
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML17275B246 List:
References
GO2-81-292, NUDOCS 8109220152
Download: ML17275B245 (4)


Text

REGULATORY INFORMATION DISTRIBUTION STEM, (RIDS)

ACCESSIOAi NBR:8109220152',

DOC ~ DATEI: 81/09/16 NOTARIZED NO DOCKEiT' FACILi:50 397 WPPSS Nucle'ar Projecti, Unit 2'i Wash'ington Pub-lic Powe 05090397 AUTH~,NAME(

AUTHOR AFFILIATION BOUCHEY<G,O, Washiington Public Power-Supply System.

REC IP ~ NAMEl RECIPIENT AF F ILKAiTION SCHWKNCKRiA, Lticensing, Branch 2

SUBJECT For wards qualificationi L staffing, level charts'f-offsite.

managers L technical stzffiper agenda Item 5 from R Au:luck 8l0731 memo, Info provided ini preparation for 810924 meeting w/NRC,Details wi 1 l be provided in FSAR Chapter

13. submittal,:

OISTRIBUTION COOEi:

BOO lS COPIES RECEEVEO;LITR

'NCL S

ZE!:I J$ LQ, T<ITLEt:I PSARI/FSAR AMDTS and Reil ate'd C'or r e'spondence-NOTES:2'. copies all matl:PM'5000397 RECIPIENT'.

I 0~ CODE'/NAMEI A C T'I 0 N '

A/ D( L'IC E i9 S N G LiIC'R P2'A INTERNALc ACCID KVAL BR26'HEM KING BR' is CORE PKRF BR 10 EQUIP. QUAL BRil 3i HUM FACiT ENG 40.

18C>> SYS'R lb'EI/EPDBI35i L'ICE GUID BR,33I MA1'L ENG BR 'l 7 MPA OP LIC BRI 34 PROC/TST REV 20; R

BRP.2'.

G.

01 CT ENG BR25i COPIES" LTTR ENCL(

1 0

1 0

1 1

1 1

1 1

3I 1

1 1

1 1

1 1

1 0

1 1

1 1

1

~

1 1

1 1

RECIPIENT ID CODE'/NAME,',

LCC, BR P2 BC AULUCK "p R ~'.4 AUX SYS" BR 27 CONT'YS BR 09 EFF TR SYS BR12'EOSCIENCKS 28 HYD/GEO BR 30-ILE 06 IE'/EPLB 36 LiICl'UAL
>

REAC, SYS BR 25 SIT'NAL> BR 24 COPIES LTiTRi ENCL<

1 0.

1 1

~

1 li 1

1 is 2

2' 2I 3I 3v 3i 1

1 1

1'"

0 1

1 1

1 1

1 1

1 ~

EXTERNALc ACRS LPDR

NSIC, 41 03(

05.

16 16 1

1 1

1 FEMA REP DIV 39 NRC," PDR 02'T'IS sEP 25 152Ij 5'f TOTAL NUMBERt OF COPIES REQUIREDei LfTR 6 'NCL<

C '

5 I

F C

AA a

I~

Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 September 16, 1981 G02-81-292 Docket No. 50-397 Mr. A. Schwencer, Chief Licensing Branch No.

2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Schwencer:

Subject:

PRESENTATION OF SUPPLY SYSTEM ORGANIZATION TO NRC ON SEPTEMBER 24, 1981

Reference:

Memorandum, R. Auluck (NRC) to A. Schwencer (NRC), dated July 31, 1981, entitled "Forthcoming Management Meeting with Washington Public Power Supply System."

i Enclosed are five (5) copies of the qualification and staffing levels of our offsite managers and technical staff that provide support to WNP-2 Operation, as requested by agenda item 5 from the referenced memorandum.

This information is provided for your review in prepara-tion for the subject meeting.

Only selected management and OA personnel from the WNP'-'2 program are listed here.

Details of the plant staff experience and qualification will be provided in our Chapter 13 FSAR submittal.

Very truly yours, GDB:bf Enclosure G.

D. Bouchey Director, Nuclear Safety i

q.4@

rp~

~ gl 5

mls 8109220182 810916

'~

PDR ADOCK 05000397 I

A PDR~'

tl II