GO2-81-292, Forwards Qualification & Staffing Level Charts of Offsite Managers & Technical Staff,Per Agenda Item 5 from R Auluck 810731 Memo.Info Provided in Preparation for 810924 Meeting W/Nrc.Details Will Be Provided in FSAR Chapter 13 Submittal
| ML17275B245 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 09/16/1981 |
| From: | Bouchey G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17275B246 | List: |
| References | |
| GO2-81-292, NUDOCS 8109220152 | |
| Download: ML17275B245 (4) | |
Text
REGULATORY INFORMATION DISTRIBUTION STEM, (RIDS)
ACCESSIOAi NBR:8109220152',
DOC ~ DATEI: 81/09/16 NOTARIZED NO DOCKEiT' FACILi:50 397 WPPSS Nucle'ar Projecti, Unit 2'i Wash'ington Pub-lic Powe 05090397 AUTH~,NAME(
AUTHOR AFFILIATION BOUCHEY<G,O, Washiington Public Power-Supply System.
REC IP ~ NAMEl RECIPIENT AF F ILKAiTION SCHWKNCKRiA, Lticensing, Branch 2
SUBJECT For wards qualificationi L staffing, level charts'f-offsite.
managers L technical stzffiper agenda Item 5 from R Au:luck 8l0731 memo, Info provided ini preparation for 810924 meeting w/NRC,Details wi 1 l be provided in FSAR Chapter
- 13. submittal,:
OISTRIBUTION COOEi:
BOO lS COPIES RECEEVEO;LITR
'NCL S
ZE!:I J$ LQ, T<ITLEt:I PSARI/FSAR AMDTS and Reil ate'd C'or r e'spondence-NOTES:2'. copies all matl:PM'5000397 RECIPIENT'.
I 0~ CODE'/NAMEI A C T'I 0 N '
A/ D( L'IC E i9 S N G LiIC'R P2'A INTERNALc ACCID KVAL BR26'HEM KING BR' is CORE PKRF BR 10 EQUIP. QUAL BRil 3i HUM FACiT ENG 40.
18C>> SYS'R lb'EI/EPDBI35i L'ICE GUID BR,33I MA1'L ENG BR 'l 7 MPA OP LIC BRI 34 PROC/TST REV 20; R
BRP.2'.
G.
01 CT ENG BR25i COPIES" LTTR ENCL(
1 0
1 0
1 1
1 1
1 1
3I 1
1 1
1 1
1 1
1 0
1 1
1 1
1
~
1 1
1 1
RECIPIENT ID CODE'/NAME,',
- LCC, BR P2 BC AULUCK "p R ~'.4 AUX SYS" BR 27 CONT'YS BR 09 EFF TR SYS BR12'EOSCIENCKS 28 HYD/GEO BR 30-ILE 06 IE'/EPLB 36 LiICl'UAL
>
REAC, SYS BR 25 SIT'NAL> BR 24 COPIES LTiTRi ENCL<
1 0.
1 1
~
1 li 1
1 is 2
2' 2I 3I 3v 3i 1
1 1
1'"
0 1
1 1
1 1
1 1
1 ~
EXTERNALc ACRS LPDR
- NSIC, 41 03(
05.
16 16 1
1 1
1 FEMA REP DIV 39 NRC," PDR 02'T'IS sEP 25 152Ij 5'f TOTAL NUMBERt OF COPIES REQUIREDei LfTR 6 'NCL<
C '
5 I
F C
AA a
I~
Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 September 16, 1981 G02-81-292 Docket No. 50-397 Mr. A. Schwencer, Chief Licensing Branch No.
2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Schwencer:
Subject:
PRESENTATION OF SUPPLY SYSTEM ORGANIZATION TO NRC ON SEPTEMBER 24, 1981
Reference:
Memorandum, R. Auluck (NRC) to A. Schwencer (NRC), dated July 31, 1981, entitled "Forthcoming Management Meeting with Washington Public Power Supply System."
i Enclosed are five (5) copies of the qualification and staffing levels of our offsite managers and technical staff that provide support to WNP-2 Operation, as requested by agenda item 5 from the referenced memorandum.
This information is provided for your review in prepara-tion for the subject meeting.
Only selected management and OA personnel from the WNP'-'2 program are listed here.
Details of the plant staff experience and qualification will be provided in our Chapter 13 FSAR submittal.
Very truly yours, GDB:bf Enclosure G.
D. Bouchey Director, Nuclear Safety i
q.4@
rp~
~ gl 5
mls 8109220182 810916
'~
PDR ADOCK 05000397 I
A PDR~'
tl II