Confirms 810501 Extended Submittal Date for Revised QA Program.Bechtel Will Be Responsible for Managing Sys Completion & Related QA for Remainder of Project
ML17275A976
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/06/1981
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Youngblood B
Office of Nuclear Reactor Regulation
References
GO2-81-70, NS-L-GCS-81-098, NS-L-GCS-81-98, NUDOCS 8104130331
Download: ML17275A976 (4)


Text

REGULA Y INFORMATION DISTRIBUTI SYSTEM (RIDS)

ACCESSION NBR:81044130331 DOC ~ DATE: 81/04/06 NOTARIZED:

NO DOCKET FACIL':50-397 WPPSS Nuclear Pr oject~ Unit 2~ Washington Public Powe 05000397 AUTH ~ NAME AUTHOR AFFILIATION BOUCHEY<G.D.

Washington Public Power Supply System RECIP, NAFIE RECIPIENT AFFILIATION YOUNGBLOODiB~ J.

Licensing Br anch 1

SUBJECT:

Confirms 810501 extended submittal date for revised QA program.Bechte.l will be responsible for managing sys completion 8 related QA for remainder of projects DISTRIBUTION CODE ~

8001S COPIES RECEIVED ~ LTR ENCL ~

SIZE ~

'ITLE; PSAR/FSAR AMDTS and Related Correspondence NOTES:PM:

2 copies of all material.

05000397 RECIPIENT ID CODE/NAME ACTION:

A/D LICENSNG RUSHBROOKpM ~

INTERNAL: ACCID EVAL BR26 CHEM,ENG BR 08 CORE PERF BR 10 EMERG PREP 22 GEOSC IENCES 14 HYD/GEO BR 15 18K 06 LIC QUAL BR MEC'H ENG BR 18 NRC PDR 02 OP LIC BR PROC/TST REV 20 R

S BR22 F'G F

K 01 UCT ENG BR25 COPIES LTTR ENCL 1

1 1

1 1

1 2

3 1

1 1

1 1

1 RECIPIENT ID CODE/NAME YOUNGBLOODpB LYNCHpD~

04 AUX SYS BR 07 CONT SYS BR 09

, EFF TR SYS BR12 EQUIP QUAL BR13 HUM FACT ENG BR I8C SYS BR 16 LIC GUID BR MATL ENG BR 17 MPA OELD POWER SYS BR 19 QA.BR 21 REAC SYS BR 23 SIT ANAL BR 24 SYS INTERAC BR COPIES LTTR ENCL 1

EXTERNAL: ACRS NSIC 27 05 16

'1 1

LPDR 03 APR 14 1983, gO TOTAL NUMBER OF COPIES REQUIRED:

LTTR ~

ENCL

1 I

'v 1

II lq

Washington Public Power Supply System A JOINT OPERATING AGENCY P.O. BOX 968 3000 GEO. WASHINGTON WAX RICHLANO,WASHINGTON 99352 PHONE I509) 372.5000 Docket No. 50-397 April 6, 1981 G02-81-70 NS-L-GCS-81-098 U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C.

20555 Attention:

Mr. B. J.

Youngblood, Chief Licensing Branch No ~

1 Division of Licensing

Dear Mr. Youngblood:

Subject:

QA PROGRAM CHANGES FOR WNP-2 Ref.:

Letter, R. L. Tedesco to R. L. Ferguson, same subject, dated March 18, 1981.

The reference letter requested submittal of gA program changes for WNP-2 by April 10, 1981.

As Mr. Sorensen of my staff discussed with you on March 25, 1981, our planning of this effort would have the revisions completed by May 1,, 1981.

This schedule was also discussed with Mr. Haass on March 23, 1981, and it is our understanding that a

submittal by May 1, 1981 is acceptable to him.

We recognize that this later submittal may require a meeting to expeditiously resolve any NRC questions prior to the June 1, 1981 effective date of the revised program.

The major change that is contemplated is an organizational change in which Bechtel Power Corporation will be utilized as plant completion contractor.

In this role Bechtel will assume responsibility for managing systems completion and related gA for the remainder of the project and for plant start-up testing.

Burns and Roe will continue to be responsible for engineering associated with the WNP-2 Project.

Major technical changes in the original construction phase PSAR gA program requirements are not contemplated as part of this change.

cc:

N.S.

Reynolds (D8L)

W.

Haass (NRC)

Very truly yours, G.

DE Bouchey Director, Nuclear goOI 5

g/o Safety A'PP-

w. I/aahs I 0 8104X89 Gal.