ML17275A973
| ML17275A973 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 04/01/1981 |
| From: | Schuster M, Schwan C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| References | |
| PNS-V-81-005, PNS-V-81-5, NUDOCS 8104070411 | |
| Download: ML17275A973 (4) | |
Text
REGULATO Y INFORMATION DISTRIBUTION~SYSTEM (RIDS)
ACCESSION NBR!81040?0411
~,
DOC ~ DATE: 8i/OQ/01NOTARIZED!s NO.
DOCKET'" 0" FACIL!50.-397'PPSS Nuclear Pro3ectg. Uni t 2~Washington Public. Power 05000397 AUTH+NAMEl AUTHOR AFFILIATION SCHWANi C",
Washington Pub l)c-Power SUpply System SCHUSTER<MBD;.
WaShingtOn Pub'liC POWer>> Supply SyStem RECIP'AME" RECIPIENT AFFILIATION SUBJECtTg-PNS~V~81~005:on 810401~ pr imary contr actor receivedI bomb=
threatagainstifacility,Search conducted,NoI evacuation>>
p,lanned, DISTRIBUTION CODE'I'OD1S.
COPIES,'EC EEV EDIliTR.
> ENCI.<
.',SIZE>>
TITLE'i Preliminary Notification of Ocurr ence or>> Non~Routine" Event" NOTES!PM: 2'opies of all material.
05000397 RECIPIENT
'D CODE/NAME INTERNAl!'RC PDR~
EXTERNAL.'DOEt EV 101 BARB LPDR NSIC'OPIES',
LTTR ENCl>
RECIPIENT'-
ID CODE/NAME~
R F ILEt INPO't ROSEN',
NSAC<ZEBROSKIl
, COPIES" LTTRi ENCLf 0
TOTAL NUMBER'F COPIES REQUIRED'TTR'NCL~
~
l 6
f
!i raCt'S tZnne>>XV< Zr
~ I-LUPI
/p 15'RELIMINARY NOTIFICATION0, ENT OR UNUSUAL OCCURRENCE--PN: 81/05 Date:
April 1, 1981 This reliminar notification constitutes EARLY notice of events of POSSIBLE safet or ublic interest si nificance.
The information resented is as initiall 'eceived without verificatic or evaluation and is basicall all that is known b
IE staff on this date.
Facil ity:
Washington Public Power Supply System Washington Nuclear Project 2
Hanford, Washington '-"
SUBJECT:
BOMB THREAT On April 1, 1981, at 6:45 am
- PST, a
WBG Clerk (primary contractor at the site) received a
bomb threat against the Washington Public Power Supply System Unit 2.
The unknown male caller stated that 2 bombs were placed on site and would go off sometime today (4/1/81).
A search of the facility is being conducted.
No evacuation is planned by the licensee.
No media interest is expected and no press release is planned by Region V or the licensee.
The Division of Safeguards and Radiological Safety, IE has been informed.
I Construction of Unit 2 is 85Ã complete.
No fuel is onsite.
This preliminary notification is.'issued for information on'ly and no further action'by IE is anticipated.
e Region V received notification of.this event from the resid'ent inspector at 9:15 am PST, April 1, 1981.
This information i.s'current as of,l'j:00 am PST, April:1, 198'j.-
4 5
~
' ~%A s
Contact:
C. Schwan, RV -
463-3778 (FTS)
M. D. Schuster, RV 463-3780 (FTS) jya I Transmi tted H St.
I: o Commissioner Commissioner ACRS MNBB:~l!o Distribution:
Chairman Hendrie Commissioner Gilinsky (IE:HQ Dist.)
Transmitted:
W. J. Dircks, EDO C. Michelson, AEOD J. J.
- Fouchard, PA N.
M. Hailer, MPA G.
W. Kerr, SP H. K. Shapar, ELD MAIL:
R. Minogue, SD IE:XOOS Document Mgt. Br~
(For PDR/LPDR)
REGIONAL OFFICES: S 3Z.~
Ahearne S. J. Chilk, SECY Bradford C.
C.
- Kammerer, CA
+ (For Distribution)
P.
BLDG: ~l:>
ZE:ZOOS:
IPtsd H.
R. Denton, NRR R. H. Vollmer, NRR R. J. Mattson, NRR D. F. Ross, NRR D. Eisenhut, NRR S.
H. Hanauer, NRR Nillste Bldg: ~l J.
G. -Davis, NMSS PRELIMINARY NOT IF ICATION
V