Forwards Requesting NRC Concurrence W/Location of Offsite Emergency Operations Facilities.Facilities Are Technically Adequate W/O Addl Backup Facilities at Greater than 10 Miles,Despite NUREG-0696 Guidance
ML17275A938
Person / Time
Site: Columbia, Washington Public Power Supply System, Satsop  Energy Northwest icon.png
Issue date: 03/20/1981
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Grimes B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML17275A939 List:
References
RTR-NUREG-0696 NUDOCS 8103310512
Download: ML17275A938 (4)


Text

REGULATOR INFORMATION DISTRIBUTION SYSTEM (RIDS) r ACCESSION NBR:8103310512 DOC ~ DATE: 81/03/20 NOTARY ED:

NO FACIL'.50 397 WPPSS Nuclear Projects Unit 2i Washington Public Powe 50-460 WPPSS Nuc)ear Project~

Unit 1~ Washington Public Powe STN-50-508 WPPSS Nuclear Project, Unit 3i Washington Pub'lic STN-50-509 WPPSS Nuclear Projectg Unit 5i Washington Public 50-513 WPPSS Nuclear Project~

Unit 4i Washington Public Powe AUTH INANE AUTHOR AFFILIATION BOUCHEYgG.DE Washington Public Power Supply System RECIP ~ NAME RECIPIENT AFFILIATION GRIMES'

~

Director's Office DOCKET 05000397 05000460 05000508 05000509 05000513 05000397 05000508 05000509

SUBJECT:

Forwards 801212 ltr requesting NRC concurrence w/location of offsite emergency operations facilities. Facilities are technically adequate w/o addi backup facilities at greater~

than 10 miles~despite NUREG-0696 guidance'ISTRIBUTION CODE:

A045S COPIES RECEIVED:LTR ENCL ~

SIZE:

r TITLE: Emergency Plan Information/NURG 0696 Comments NOTES:PM:

2 copies o f al l material.

Standardized

Plant, Standardized Plant.

RECIPIENT ID CODE/NAME ACTION:

YOUNGBLOODpB BOURNIAIA ~

INTERNAL DIR g EMER PL PRO' EM IC F I LE.S EXTERNAL: LPDR PDR COPIES LTTR ENCL 1

1 1

1 0

4 1

RECIPIENT ID CODE/NAME LYNCHgD~

EMERG PREP DEV ISE NSIC COPIES LTTR ENCL 1

1 1

1 2

2 TOTAL NUMBER OF COPIES REQUIRED:

LTTR lg ENCL

II g

I

Washington Public Power Supply System A JOINT OPERATING AGENCY P, 0, BOX 958 3000 GEO, WACHINCTON WAY RICHI ANO, WASHINCTON QQ352 PHONE (509) 375 5000 March 20, 1981 Mr. Brian Grimes, Director Division of Emergency Preparedness Office of Inspection 8 Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Grimes:

Subject:

SITING OF EMERGENCY OPERATIONS FACILITIES

Reference:

Letter, G.D. Bouchey to Brian Grimes, same subject, dated December 12, 1980.

Attached is a copy of my December 12, 1980 letter which requested NRC Staff concurrence with the location of the off-site Emergency Operations Facilities serving the five (5) Washington Public Power Supply System plants that are currently under construction.

To date the Supply System has not received an NRC response to this letter.

We are aware of the recent Commission guidance (NUREG-0696, Functional Criteria for Emergency Response Facilities, dated February, 1981) regarding location of EOFs.

Despite this guidance, we believe our facilities are technically adequate without additional back-up facilities at greater than 10 miles and I would like to request your concurrence with this position in response to our December 12, 1981 correspondence on this matter.

If additional information would be helpful in resolving this matter, please do not hesitate to contact me.

Very truly yours, Attachment G.

D. Bouchey, i ector Nuclear Safety cc: