REGULATORY INFORMATION DISTHIBUlION SY~rEM=
ACCtSSION NOR;8102250095 DOC ~ DATE: 81/02/17 NOTARl/ED:
FAC1L:50 "397 NPVSS Nucl ear Pi oj ect~
Uni t 2~ llashington Pub AO"I'H~ NAME; AUTHOR AFFILIATION BOOCHEYFl'.V, I'lashington Public f'ower Supply System t(: IP ~ NAMt RECIP lb,N1 AFFILIATION ESCORT H,L ~
Division of Licensing SUBJEC l: Requests concurrence w/action to begin repair of identified accessible defects in'iolation of ANS sacrificial shield wall,unconditional release,5 h
exemption request will be submitted by 810220.
OISTRIBUI ION COBE:
BOOIS COPIES RECEIVES:LTR J ENCL TITLE: PSALM/FbAH AMDTS and Hel ated Correspondence NOTtS:VM:
E! copies of all material.
(RIDS)
NOlic Powe remaining DB1 ~ 1" on ardship SIZE ~
A DOCKET O
05000397 05000397 ACTION:
INTEHNAI:
HEC IPIEN T lO CODt/NAME A/0 LICtNSAG AuSHHHOOK;Il.
ACC1D EVAL BR26 CHEM tAl'H oi CURE VEHF BR 10 EMEHG PAEV Rc!
Gt'IISCIENCtS 14 HYU/GEO BH 1b I Lt 06 LIC QuAL BH NtACH tNb BR 18 NRC P/)R 02 OV LIC BH VHUC/TS'l HEV 20 A "
8 BR22 tG l-I 01 I'NG BR25 COPIES LTTR ENCL 1
0' 1
1 1
?
1 1
1 1
1 RECIPIENT ID CODt/NAME YOUNtsBLOOt)all LYNCHgD~
04 AUX SYS BH 07 CONT SYS BR lI9 EFF TA SYS UR12 E,QUIP QDAC, BR13 HUM FACT EN&
BR ILC SYS BH 16 l IC GUID BR HA'fL E.NlB BR 17 MPA VELD POKER SYS BH 19 QA BH dl REAt'YS BR 23 SiT ANAL BH 24 SYS INTYRAC BH COPIES L7TH ENCL 1
1 1
3 1
1 1
1 1
1 1
1 1
1 1
FXTERNAL: ACHS NS1C 21 05 lo 1
LPDR 03 FEB 26 1981 TOTAL NUNBFR OF COPIFS NEUUIRBO:
LTTR Pf ENCL
I
~
U F,
Washington Public Power Supply System A JOINT OPERATING AGENCY P.O. BOX 968 3000 GEO. WASHINGTON WAY RICHLAND,WASHINGTON 99352 PHONE (509) 372 5000 Docket No. 50-397 G02-81-25 February 17, 1981 Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.
C.
20555 Attention:
Mr. R. L. Tedesco Assistant Director for Licensing Div'ision of Licensing s
Dear Mr. Tedesco:
Subject:
WPPSS NUCLEAR PROJECT NO.
2 SACRIFICIAL SHIELD HALL REPAIRS
Reference:
- Letter, RL Tedesco (NRC) to RL Ferguson (WPPSS),
"Staff Evaluation of the Proposed Corrective Weld at the 541 Foot Construction Joint of the Sacrificial Shield Wall", dated November 20; 1980 The purpose of this letter is to request NRR concurrence with action by the Supply System to begin repair of the remaining identified accessible defects in violation of AWS Dl.l on the sacrificial shield wall (SSW).
Currently, in accordance with the reference letter, a technical hold under NRR control exists on any work activity associated with the SSH except the girth weld repair.
As was understood from the meeting with your staff on January 22nd, the only remaining items of concern with NRR on the SSW are the disposition of the minor defects on the outside surface of the SSW which were identified as being in violation of AWS Dl.l.
The Supply System requests your concurrence with our action to begin repair of these defects.
A subsequent submittal will request herdship exemptions on some select welds and request an unconditional reiease orhusy IPIIIFI'VItjesassociated with the sSW.
Your concurrence g+OI QHV 5
Lf I Kd F4 N3g6>
j 0
P
~ k 1
k,
PPS RL Tedesco Page 2
Washington Public Power Supply System G02-81-25 February 17, 1981 with this action now will minimize schedule
- hardship, because there is a time window in our schedule starting February T8th that will allow repair of most defects and minimize requests for hardship exemptions based on schedule ramifications.
Immediate release to repair is requested.
The letter requesting uncondi-tional release and hardship exemptions on a weld-by-weld basis will be submitted no later than February 20, 1981.
- However, NRR review and approval of that letter should not be a prerequisite to allow the Supply System to repair identified defects.
Very truly yours, G.
D.
Bouchey Director, Nuclear Safety cc:
G. Georgiev -
NRC I&E Headquarters (telecopy)
D. Smith -
NRC MTEB (telecopy)
MD Lynch -
NRC DOL (telecopy)
RH Engelken -
NRC Region V Director (telecopy)
AD Toth -
NRC Resident Inspector - WNP-2 (hand deliver)
JJ.
Verderber Burns and Roe W. Wood -
NUS Corporation ND Lewis EFSEC, Olympia WS Chin - Bonneville Power Admin.
WNP-2 Files
0 0