SUBJECT:
Final deficiency rept re improper fabrication-of structural members in control room suspended ceilingiinitially reported 801114.Contr actor directed to weld washer= plates over" slotted L oversized'olt holes.
DISTRIBUTION CODE ~
B019S COPIES RECEIVED'LTR ENCL +
SIZE ~
~
TITLE: Construction Deficiency Report (iOCFR50 ~ 55E)
NOTES:PM:
2 copies of all material.
05000397 t
REGULATORY INFORMATION DISTRIBUTION S TEM (RIDS)
ACCESSION NBR:8102030512 DOC ~ DATE: 81/01/08 NOTARIZED; NO DOCKET FACIL:50-397 WPPSS Nuclear Pr oject~ Unit 2i Washington Public Powe 05000397 AUTH ~ NAME AUTHOR AFFILIATION MATLOCK<R,G, Washington Public Power Supply System RECIP ~ NAME RECIPIENT AFFILIATION ENGELKENgR AH, Region 5i San Franciscoi Office, of the Director RECIPIENT IO CODE/NAME, ACTION:
A/0 L ICE NSNG 04 RUSHBROOKiM ~
06 INTERNAL: AD/RCI/IE,'7 D/DIR HUM FAC15 EDO 8,
STAFF 19 HYb/GEO BR 22'IC QUAL BR 12 NRC PDR 02 V
13 01 STANDRDS DEV 21 COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME
.YOUNGBLOODpB 05 LYNCHID~
07 ASLBP/J ~ HARD DIR p DIV OF LIC EQUIP QUAI BR11 ISE 09 MPA 20 OELD 21 QA BR 14 RUTHERFORDrW ~ IE" COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
EXTERNAL+ ACRS
- NSIC, 16 08 16 16 1
1 LPDR 03 1
1'EB 04 1983 A
ql TOTAL NUMBER OF COPIES REQUIRED:
LTTR ~
ENCL
,~
~
I li W
1 A
i J
)I'I lf II 4
I Ih
~
ll I
Washington Public Power Supply System A JOINT OPERATING AGENCY
- p. o. Box Qdd 3000 Gco. wANHiNoroae wAv R>cait.eaeo.
wANH<Novoae QQ352 PHoeec (50Q) 375 5000 January 8,
1981 G02-81-05 Docket No. 50-397 Nuclear Regulatory Commission Region V
Suite 202, Walnut Creek Plaza 1990 North California Boulevard Walnut Creek, California 94596 Attention:
Mr. R. H. Engelken, Director Gentlemen:
Subject:
WPPSS NUCLEAR PROJECT NO.
2 REPORTABLE DEFICIENCY - 10CFR50.55(e)
IMPROPER FABRICATION. OF STRUCTURAL MEMBERS IN CONTROL ROOM SUSPENDED CEILING In accordance with the guidelines established for the reporting of 10CFR50.55(e) conditions, your staff was informed by telephone on November 14, 1980, of a "Potentially Reportable" condition regarding the improper fabrication of the structural members in the control room suspended ceiling.
An interim report describing the deficiency and our approach to the resolution was submitted per G02-80-297, dated 12/15/80.
The WNP-2 Project has completed its evaluation and has determined this condition to be reportable under the provision of 10CFR50.55(e).
Attached is our report on this deficiency.
Please contact us if you have additional questions.
g
~E'"
cd
-acA~"
+)
Br
'-=-;="- RGM/$$S/im
-",-'n Attachment cc:
QR Lewis - BPA ND Lewis - EFSEC, Olympia RE Snaith - B&R, NY
~V=Stel:l.o~NRC~
sxoaoso Very truly yours, R.
G. Matlock Program Director, WNP-2 AD Toth -
NRC Site JJ Verderber - B&R, NY E.
Hood -
NUS Corporation WNP-2 Files 5
]/i
~99 go~
0 jO P,'L
WPPSS NUCLEAR PROJECT NO.
2 REPORTABLE DEFICIENCY AND CORRECTIVE ACTION FOR THE IMPROPER FABRICATION OF STRUCTURAL MEMBERS IN-THE CONTROL ROOM CEILING WASHINGTON PUBLIC POWER SUPPLY SYSTEM DOCKET NO. 50-397 LICENSE NO.
CPPR-93 Nature of Deficienc The control room ceiling-was installed with oversized bolt holes in the diagonal bracing, slotted holes in the vertical truss
- members, and portions of the diagonal bracing were bent at end connections to correct fabrication errors.
Safet Si nificance If the above deficiencies were to remain uncorrected, the possibility exists that the ceiling could fail and that one or more lighting fixtures supported from the ceiling could fall on safety related equipment, thus adversely affecting the safe operation of the plant.
Corrective Action The installing contractor has been directed to weld washer plates over the slotted and oversized bolt holes and to replace or to add stiffeners, with engineering approval, for the bent diagonal bracing.