Responds to IE Bulletin 80-21, Valve Yokes Supplied by Malcolm Foundry Co,Inc. Manufacturers Have Been Contacted. Supplemental Rept Will Be Sent During Feb 1981
ML17275A806
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/02/1981
From: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
GO2-81-01, IEB-80-21, NUDOCS 8101270505
Download: ML17275A806 (2)


Text

Washington Public Power Supply System A JOINT OPERATING AGENCY P.O. BOX 968 3000 GEO. WASHINGTONWAY RICHLAND,WASHINGTON 99352 PHONE (509) 372 5000 G02-81-01 January 2,

1981 Docket No. 50-397 Nuclear Regulatory Commission Region V

1990 North California 'Boulevard Suite 202, Walnut Creek Plaza Walnut Creek, California 94596 Bg,

. ~9gSI ~

IIpsIIIII,r g,T3$

y t~

Gentlemen:

Subject:

WPPSS Nuclear Project No.

2 Docket No. 50-397, CPPR-93 IE Bulletin No. 80-21, Valve Yokes Supplied by Malcolm Foundr Com an

, Incor orated Attention:

Mr. R.

H. Engelken, Director c7I 6

c

%~Jig The subject bulletin identified a problem relative to the cracking of valve yokes supplied by the Malcolm Foundry

Company, Incorporated to the Anchor/Darling Valve Company.

Requested action included identification of active valves in safety related systems which have valve parts cast by Malcolm Foundry, verification that such parts have the proper mechanical properties or replacement of defective components and/or valves.

In respect to the requested action, inquiries have been sent to manu-facturers and contractors who have supplied safety related valves for the WNP-2 project.

Identification of valves containing Malcolm Foundry components, was requested.

A preliminary listing of manufacturer s, whose valves will be included in the requested review, is:

Anchor/Darling Valve Company Anderson Greenwood 8

Company Atwood and Morrill BIF, A Unit of General Signal Company Borg-Warner Nuclear Valve Division Crosby Fisher Controls GPE Controls Hammel Dahl Velan Engineering Ltd.

4 Washington Public Power Supply System RH Engelken Page 2

G02-81-01 January 2,

1981 Telephone communications with Anchor/Darling Valve Company, which were confirmed by letter, indicated that none of the valves supplied for the WNP-2 project included Malcolm Foundry components.

The Malcolm Foundry castings were indicated as used only in valves produced by their Williamsport, Pennsylvania plant and specific valves, with such components, have been identified to the nuclear facilities for which they were supplied.

Responses received from GPE Controls, Morton Grove, Illinois and Velan Engineering Ltd., Montreal, Canada indicated that Malcolm Foundry has never been used as a source for valve components.

Completion of the required actions, within the requested time, is not possible since only the above indicated responses have been received to date.

As soon as all responses have been received and evaluated, a

supplementary report will be made to the Commission, which will provide a listing of affected valves, valve manufacturers, and our schedule for completion of valve inspections and component or valve replacement.

The inspection of valves containing Malcolm Foundry castings will include the use of Brinell hardness tests to establish material properties for the components in question.

It is expected the supplementary report can be provided during February 1981.

If you have additional questions please contact us.

Very truly -.yours, RGM:HLB:cph cc:

V.

Stello-NRC AD Toth-NRC, Resident Inspector ND Lewis - EFSEC JR Lewis-BPA B.

Wood -

NUS JJ,Verderber

- Burns 8

Roe WNP-2 Files NS Reynolds-Debevoise 5 Liberman R.