ML17275A803
| ML17275A803 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 12/31/1980 |
| From: | Mazur D WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Engelken R, Engleken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| GO1-80-397, IEB-80-23, NUDOCS 8101270464 | |
| Download: ML17275A803 (1) | |
Text
Washington Public Power Supply System A JOINT OPERATING AGENCY P. O. BOX 988 3000 CSO. WASHINCTON WAY RICHI.AHO, WASHINOSON Q ~<<? c-
<<5?'9352 PHONS
- 09) 375 5000 Docket 50-397 December 31, 1980 G01-80-397 Mr. R.
H. Engelken, Director NRC Region V, Suite 202 Walnut Creek Plaza 1900 N. California Blvd.
Walnut Creek, California 94596
Dear Mr. Engelken:
Subject:
WPPSS Nuclear Projects Nos.
1/4 IE Bulletin 80-23, Failures of Solenoid Valves Manufactured By Valcor En ineerin Cor oration
References:
- gJA1056, dated December 15, 1980.
IE Bulletin 80-23, issued on November 14, 1980, identified possible safety problems with specific models of Valcor solenoid valves.
'n response to IE Bulletin 80-23, the Supply System has determined that there are none of the subject Valcor solenoid valves currently
.in the design scope for use on safety systems at the WNP-1/4 projects.
Very truly yours, DWM;LCO:oe D.
W. Mazu Program Director, WNP-1/4