Requests NRC Formalize & Submit Branch Questions Re Physical Security & Safeguards Contingency Plans Transmitted 790102 & 0423,respectively.Continued Delays Will Adversely Impact Const Schedules
ML17275A761
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/18/1980
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Youngblood B
Office of Nuclear Reactor Regulation
References
NUDOCS 8012230391
Download: ML17275A761 (6)


Text

. i~-

REGULATORY ORNATION OISTRIBUTION SYS+N (RIBS)

ACCESSION NBR:8012230391 DOC ~ DATE: 80/12/18 NOTARIZED:

NO DOCKET

¹'ACIL:50-397

'tNPPSS Nuclear Projecti Unit 2i Hashington Public Powe 05000397 AUTH,NAME AUTHOR AFFILIATION BOUCHEY<G.DE l'washington Public Power Supply System

'ECIP ~ NAME RECIPIENT AFFILIATION EI'l YOUNGBLOODiB~ J ~

Licensing Branch 1

SUBJECT:

Requests NRC formalize L submit branch questions re physical security 8 safeguards contingency plans transmitted 790102 8,

790423irespectively.continued delays will adversely impact const schedules.

DISTRIBUTION CODE:

S003S COPIES RECEIVED;LTR Z ENC1 SIZE:

TITLE: Non"Proprietary Info Re Security Plans NOTES:PM:

2 copies of all material.

05000397 RECIPIENT ID CODE/NAME ACTION:

YOUNGBLOODiB LYNCH,D.

COPIES LTTR ENCL REC IP IENT ID CODE/NAME RUSHBROOKgM ~

COPIES LTTR ENCL INTERNAL: ISE 05 NRC PDR 02 SIT ANAL BR QW EXTERNAL: ACRS 07 EG FILE LPDR G ~

01 03 Dgg g g 198k I3 CI TOTAL NUMBER OF COPIES REQUIRED:

LTTR ~

ENCL

P Washington Public Power Supply System A JOINT OPERATING AGENCY P. 0. OOX 988 3000 GEO, WASHINCTON WAT RICHI.ANO, WASHINOTON 99352 PHONE (509) 375 5000 G02-80-306 December 18, 1980

'4 Docket No. 50-397 U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D. C.

20555 Attention:

Mr. B. J.

Youngblood, Chief Licensing Branch 1

Division of Licensing Gentlemen:,

Subject:

WPPSS Nuclear Project No.

2 Transmittal of Security Plan guestions Originated 'by Nuclear Materials Safe uards and Securit The purpose of this letter is to request your efforts to formalize and submit for our disposition, NRC branch questions on the WNP-2 Physical Security Plan and Safeguards Contingency Plan.

The Physical Security Plan was submitted for review on January 2, 1979, and the Safeguards Contingency Plan was submitted on April 23, 1979.

Draft questions were generated on the Physical Security Plan in March 1980, and on the Safeguards Contingency Plan in July 1980.

Our need for your formal submittal of these questions is to allow WNP-2 to factor the NRC review into design work on the Security System.

At

present, without this submittal, the WNP-2 Project plans to impose a

hold on the design effective December 31, 1980, until NRC questions are resolved.

Expeditious action will allow us to meet our construction schedule and resolve NRC questions and inputs during the design phase.

Continued delays in receipt of questions on the submitted plans will impact our.'bility to meet these goals.

$g63

%g fc~"

~'4

<<il

~ (

~

h$

I'

A)i W'

SS Washington Public Power Supply System U. S. Nuclear Regulatory Commission Page 2

G02-80-306 December 18, 1980 If there is any action the Supply System can take to expedite a satis-factory resolution of this problem, please let us know.

Very truly yours, GDB:PLP:cph cc:

JJ Verderber

- B&R JR Lewis BPA ND Lewis - EFSEC, Olympia V. Stello -

NRC AD Toth NRC Resident Inspector WNP-,2 Files MD Lynch' NRC - telecopy G.

D. Bouchey Director Nuclear Safety

,L ~