ML17273A028
| ML17273A028 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 02/29/1980 |
| From: | Hackney R GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES, INC./GENER |
| To: | |
| Shared Package | |
| ML17273A029 | List: |
| References | |
| GA-C15474, NUDOCS 8005270475 | |
| Download: ML17273A028 (2) | |
Text
Washington Public Power Supply System A JOINT OPERATING AGENCY P. O. BOX 968 3000 GEO, WASHIHCrdM WAr RICHLANO. WASHINCrdN 99352 PRdNr (509) 3V5 5000 April 21, 1980 G02-80-93 Nuclear Regul atory Commission Region V
Office of Inspection and Enforcement Suite 202, Walnut Creek Plaza 1990 N. California Blvd.
Walnut Creek, California 94596 Attention:
Hr. R.
H. Engelken, Director FBI c.j P~
v'ubject:
WPPSS NUCLEAR PROJECT NO.
2 DOCKET NO. 50-397, CPPR-93 REPORTABLE DEFICIENCY 10CFR50.55 e
Dear Nr. Engelken:
In accordance with the provisions of 10CFR50.55(e),
your staff was informed by telephone on triarch 19, 1980, of a reportable condition regarding the violation of minimum wall thickness on small bore piping.
Attached is our interim report concerning this deficiency.
A final report will be scheduled when our design analysis is completed.
Please contact us if you have additional questions.
Very truly yours, WQ6ukrdIpnr D. L. Renberger Assistant Director, Technology DLR/RTJ/im
Attachment:
As stated cc: