ML17272A993

From kanterella
Jump to navigation Jump to search
Notifies That Lab Will Be Conducting Addl Moisture Testing on Low Hydrogen Electrodes Using Technique Required in Aws A5.5,Section 25.Electrode Coating Moisture Testing Results Will Be Applied Only to Units 1 & 4
ML17272A993
Person / Time
Site: Columbia, Washington Public Power Supply System, Satsop  Energy Northwest icon.png
Issue date: 06/06/1980
From: Renberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Youngblood B
NRC COMMISSION (OCM), Office of Nuclear Reactor Regulation
References
NUDOCS 8006110278
Download: ML17272A993 (4)


Text

t REGULATO INFORMATION DISTRIBUTION STEM (RIBS) +Pil'/

ACCESSION NBRS8006110278 DOC ~ DATE: 80/06/06 NOTARIZED ~ NO DO FACIL:30-397 NPPSS Nuol ocr Projectr Unit Er Neenlngton, Publ lc Powe ~003 50 460 FJPPSS Nuclear ProJectg Unit ii Washington Public Powe 050000 0 50 513 HPPSS Nuclear ProJecti Unit Qi Washington,Public Powe 05000513 AUTH NAME

~

RENBERGKR<D.L, AUTHOR AFFILIATION Washington Public Power Supply System

~P RECIP ~ NAME RECIPIENT AFFILIATION Commission YOUNGBLOODFB ~ J. Licensing Branch 1

SUBJECT:

Notifies that lab will be conducting addi'oisture testing on low hydrogen electrodes using technique required in ANS A5.5ESection 25 'lectrode coating moisture testing results will be applied only to Units 1, 8 3.

DISTRIBUTION CODE: B001S TITLE:

COPIES RECEIVEDeLTR J ENCL PSAR/FSAR AMDTS and Related'Correspondence

~ SIZE:

~O~ES: PJBu 2 ~~~ Pt~~Ctzt~uZlh24~ ttIEMEEWEl3Le&P&~6386%~1>Ãh WArT ACTION:

BC RECIPIENT ID CODE/NAME 05 PMNLY<GH UAA.Q-Q, ~MS COPIES LTTR ENCL 1

1 1

0 AD LA

~

RECIPIENT ID CODE/NAME.

<~~ ~W,c.~~<3 COPIES LTTR ENCL 1

1 0

0 INTERNAL: 01 1 1 02 NRC PDR 1 .1 06 I 8 E 3 3 ~

08 OPFRA LIC BR 1 1 09 GEOSCIEN BR 10 QAB il MECH ENG BR 13 MATL ENG BR 1

2 1

2 12 15 STRUC ENG BR REAC SYS BR 1

1 1 1

16 ANALYSIS BR 1 1 17 CORE PERF BR 1 1 18 AUX SYS BR 1 19 CONTAIN SYS 1 1 20 I L C SYS BR 1 1 21 PONER SYS BR 1 22 AD SITE TECH 1 0 26 ACCDNT ANLYS 1- 1 27 EFFL TRT SYS 1 1 28 RAD ASMT BR 1 29 KIRKHOOD 1 1 AD FOR ENG 1' AD PLANT SYS 1 0 AD SITE ANLYSIS 1 0 AD/CORE L CONT 1 0 DIRECTOR NRR 1 0 HYDRO METEOR BR 2 2 MPA 1 . 0 OELD 1 0 EXTERNAL; 03 LPDR 1 1 OCI NSIC 1 1 30 ACRS 10 10

~r>>>> >S8O TOTAL NUMBER OF COPIES REQUIRED: LTTR ~ ENCL

I l

/ t ~ II M <<( lJ f lg 1 )

~ ~

I n

Washington Public Power Supply System A JOINT OPERATING AGENCY P. 0. BOX 958 3000 GEO. WA4HINCTON WAY RICHLAND, WA4HINCTON 99352 PHONE (509) 375 5000 Docket Nos. 50-397 June 6, 1980 50-460/513 50-508/509 U. S. Nuclear Regulatory Commission Washington D. C. 20555 Attention: B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing

Subject:

MOISTURE TESTING OF LOW-HYDROGEN ELECTRODES

References:

I) Letter, L. S. Rubenstein to N. 0. Strand, same subject, dated April 4, 1980

2) Letter, D. L. Renberger to L. S. Rubenstein, same subject, dated April 25, 1980

Dear Mr. Youngblood:

Mr. Rubenstein's letter of April 4, 1980 (Reference 1) requested informa-tion regarding implementation of the proposed electrode coating moisture testing technique. In our letter of April 25, 1980, (Reference 2) we stated that the technique would be used for testing electrodes from all of our projects, (i.e. WNP-1, 2, 3, 4 and 5). However, since that writing, we have been able to make arrangements with a laboratory which will do moisture testing on low hydrogen electrodes using the technique required in Section 25 of AWS A5.5.

Therefore, to avoid possible future complications, we intend doing all additional moisture testing at that laboratory. Accordingly, results from the testing technique approved in Reference I will be applied only to the WNP-1/4 projects. Testing for the other projects, WNP-2, 3 and 5, and additional testing for WNP-1/4 will be done in accordance with the requirements of Section 25 of AWS A5.5.

Very truly yours, D. L. Renberger Assistant Director, Technology DLR:DWC:fa foe/

cc: M. D. Lynch, Nuclear Regulatory Commission 5 A. Bournia, Nuclear Regulatory Commission jlo