C REGULATOR NFORMATION DISTRIBUTION S EM (RIDS)
ACCESSION NBR:8005190563 DOC ~ DATE: 80/05/12 NOTARIZED:
NO FACIL:50 397 PJPPSS Nuclear Projects Un) t 2q Washington Publ )c Powe 50-JJ60 HPPSS Nuclear Projects Unft ii lfashington Public Powe STN-50-508 HPPSS Nuclear Projectr Un{t 3g Washington Public AUTH ~ NAME
'UTHOR AFFILIATION RENBERGER<D,L, Nashington Publ)c Power Supply System RECIP ~ NAME RECIPIENT'FFILIATION YOUNGBLOODiB.J~
Licensing Branch 1
SUBJECT:
Advises that first phase of sampl ings~ re Reg Guide JJ,Sghave been completed, Sampling wi,l 1 be suspended unt)1 1 yr prior to fuel load, Second phase w/ll then beg)n,.
DISTRIBUTION CODE:
B001S COPIES RECEIVEDiLTR i ENCL 4 SIZEs+
TITLE: PSAR/FSAR AMDTS and Related Correspondence
~orEs:Z~Mya M< %La.=
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME -'TTR ENCL ID CODE+NAME
~
LTTR ENCL ACTION: '5 PM W ~>>>C)Y 1
1 AD L~W 0
BC g.gggg~y 1
0 LA CCVR ~ f 0
INTERNAL; 01 1
1 02 NRC PDR 1
1 06IaE.
3 3
08 OPERA LIC BR 1
1 09 GEOSC IEN BR JJ JJ 10 QAB 1
11 MECH 'ENG BR 1
1 12 STRUC ENG BR 1
1 13 MATL ENG BR
,2 2
15 REAC SYS BR 1
1 16 ANALYSIS BR 1
1 17 CORE PERF'R 1
1 18 AUX SYS BR 1
1 19 CONTAIN SYS 1
1 20 I L
C SYS BR 1
1 21 POl<ER SYS BR 1
1 22 AD SITE TECH 1
0 26 ACCDNT ANLYS 1
1 27 EFFL TRT SYS 1
1 28 RAD ASMT BR 1
1'9 KIRKHOOD 1
1 AD FOR ENG 1
0 AD PLANT SYS 1
0 AD REAC SAFETY 1
0 AD SITE ANLYSIS 1
0 DIRECTOR NRR 1
0 HYDRO~METEOR BR 2
2 MPA 1
0 OELD 1
0 DOC 05000JJ60 05000508 5'of EXTERNAL: 03 LPDR 30 ACRS 1
10 10 0 JJ NS I C 1
1 NAY gg 1ggo TOTAL NUMBER OF COPIES REQUIRED:
LTTR ~ ENCL
UI f
4
,("4" q
"~ 4 "A~)3,',lX o,
1 Ql f 4
w 0 0619 05 63 Washington Public Power Supply System A JOINT OPERATING AGENCY P. 0. Box 988 3000 Gso, WASHINOTON WAY RICHl.ANO. WAsHlMOTON 99352 PHONC (509) 315 5000 Hay 12, 1980 Mr. B. Joe Youngblood, Chief Div. of Site Safety 8 Env. Analysis U.
S. Nuclear Regulatory Commission Washington, D.
C.
20555
Dear Mr. Youngblood:
Subject:
Temporary Suspension of the Preoperational Radiolo ical Monitorin Pro ram for WNP-2
References:
1)
U.S.
NRC Regulatory Guide 4.8, "Environmental Technical Specifications for Nuclear Power Plants" 2)
U.S.
NRC Branch Technical Position on U.S.
NRC Regulatory Guide 4.8, dated November 1979 Due to announced schedule slippages for fuel; load of WNP-2 at Hanford (now set for mid 1982), various pertinent preoperational monitoring and baseline study requirements and commitments have been reviewed.
The Preoperational Radiological Monitoring Program identified in the refer-enced documents requires that certain items be collected for two (2) years prior to fuel load ("phase one") while others are collected for periods of six (6) months or one (1) year.
The first phase of samplings have now been conducted for two years and we have concluded that the regulatory requirements set forth pertaining to this program have been met.
It is, therefore, our intent to suspend sampling until one year prior to fuel load.
At that time, they will be re-started along with the second phase of studies.
Should you have any questions, please contact Hr. Hark Miller on extension 5576.
Sincerely, DLR/MLM/sms D. L. Renberger Assistant Director, Technology
I~
pP G