ML17272A916

From kanterella
Jump to navigation Jump to search
Advises of Fundamental Misstatement in 800402 Minutes of 800104 Meeting W/Util Re QA Program Unionization.Requests Correction to Reflect That Fact Had No Influence on Local 598 Election
ML17272A916
Person / Time
Site: Columbia, Washington Public Power Supply System, Satsop  Energy Northwest icon.png
Issue date: 04/10/1980
From: Reynolds N
DEBEVOISE & LIBERMAN
To: Lynch M
Office of Nuclear Reactor Regulation
References
NUDOCS 8004160285
Download: ML17272A916 (4)


Text

REGULATORY INFORNATIQN DISTRIBUTION SYSTEN

<RIDS)

ACCESSION NBR: 800416028 DOC. DATE: 80/04/10 NO~IZED:

NO FACIL: 50-397 WPPSS Nuclear Progecti.Unit..2i Washington Public Powe 50-460 WPPSS Nuclear Progecti Unit ii Washington Public Powe STN-50-508 WPPSS Nuclear Progecti Unit 3<

Washington Public AUTH. N*NE AUTHOR AFFILIATION REYNOLDS'. S.

Deb evo ise 0 Liberman RECIP. MANE REC IP IENT AFFILIATION LYNCH'i.O.

Light Water Reactors Branch 4

SUBJECT:

Advises of fundamental misstatement in 800402 minutes of 800104 meeting w/util re GA program unionization. Requests correction to reflect that util had no influence on Local 598 election.

DISTRIBUTION CODE:

6002S COPIES RECEIVED: LTR / ENCL 6 SIZE:

TlTLE: Quality Assurance Dist. foI Amdt to Report NOTES: W&& ~

+ ~ +~

Cl

~ a/q DOC 05000460 05000508 ACTION:

+ tO~

REC IP IENT ID CODE/NAME 04 GAB COPIES LTTR ENCL REC IP IENT ID CODE/NAME COPIES LTTR ENCL INTERNAL: 01 06 AD FOR GARO 10 RES ASLB DQR DSS ENERQCY PLAN BR LWROi CHIEF LWR03 CHIEF OPERATOR LIC BR ORB02 CHIEF ORB04 CHIEF REACTOR SFTY BR EXTERNAL:

11 ACRS 2

1 1

1 1

1 1

1, 1

1 ih 1

03 NRC PDR 09 ASLAP ADV REAC BR D IRECTOR DPN DSE EEB ENGINEERING BR LWR02 CHIEF LWR04 CHIEF ORB01 CHIEF ORB03 CHIEF PLANT SYS BR SEP BR p M

> <>G R<a-Q.

ESNE %

w +~g~ p a

~TWMACR~~ g m (~

9g0 o

TOTAL NUNBER OF COPIES REGUIRED:

LTTR ~ ENCL

T 0

II' f

I/

I I

r E

I r

t f

~

~

IIcq

tfr,f "I [i ii II

,v rl I

tl I.

.II Il Ii ih II)

  • I tl

, If rr I, Ilail y

$,;I j r)ttr

'1 lI

~

I r

I t

I

LAW OFFICES OF DEBEVOISE Sc LIBERMAN I200 SCVCNTCCNTH STRCCTi N. W.

WASHINOTONp DECL 20038 TCLCPHONC (202) 857 9800 April 10, 1980 Mr. M. D. Lynch Project Manager Light Water Reactors, Branch No.

4 Division of Project Management U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Minutes of Meeting Regarding WPPSS QA Program

Dear Mr. Lynch:

The minutes dated April 2 of the meeting which the Staff held with the Washington Public Power Supply System

("Supply System" ) on January 4, 1980, to discuss the possible affects of unionization in the Supply System's Quality Assurance Program contain a fundamental misstate-ment.

The last paragraph of the minutes state that "it was determined that WPPSS had successfully convinced the 14 QA personnel not to join Local 598 In fact, the Supply System had absolutely no influence on the election in which the QA personnel voted not to join Local 598.

This statement in the minutes could have significant adverse implications for the Supply System.

Accordingly, we request that you issue a correction to the minutes to reflect the actual facts.

It is imperative that this correction be issued at the earliest possible time so that we may rely upon the minutes in further evaluating this matter.

One possible wording might be. that "it was deter-mined that the 14 QA personnel elected not to join Local 598 Sincere y

CC'ichol

. Reynolds R.

Q. Quigley, Esp.

Nicholas Lewis, Esq.

0.

K. Earle Resident Inspector/WPPSS-2 NPS W.

D. Paton, Esq.

James P. MurrayJr,,Esq..8 p p 4 y 6 gg~

v I