ML17272A897
| ML17272A897 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 03/10/1980 |
| From: | Renberger D WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Rubenstein L Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17272A898 | List: |
| References | |
| GO2-80-62, NUDOCS 8004020339 | |
| Download: ML17272A897 (6) | |
Text
y/~i'1/go
SUBJECT:
Forwards Amend 8 to FSAR ~
DISTRIBUTION CODE:
B001B COPIES RECEIVED;LTR 9
-. ENCL',
0 SIZE: g+'<
TITLE: PSAR/FSAR AMDTS and Related Correspondence REGULATORY 'ORMATION DISTRIBUTION SY!M (RIBS)
ACCESSION NBR;8004020339 DOC ~ DATE; 80/03/10 NOTARIZED:
YES DOCKET FACIL:50-397 WPPSS Nuclear Projects Unit 2g Washington Public Powe 05000397 AUTH,NAME AUTHOR. AFF IL'IATION RENBERGER<D ~ L' Washington Public Power Supply System RECIP ~ NAME RECIPIENT AFFILIATION RUBENSTEINg L ~
Light Hater Reactors Branch 4
INTERN 0
01 REG FILE 09 GEOSC IEN BR 11 MECH ENG BR 13 MATL ENG BR 16 ANAI YSIS BR 18 AUX SYS BR 20 I L
C SYS BR 22 AD SITE TECH 27 EFFL TRT SYS 29 KIRKWOOD AD PLANT SYS AD SITE. ANLYSIS HYDRO METEOR BR OELD 1
1 3-3-
1 1
2 2
1 1
1 1
1 1
1 0
1 1
1 1
1 0
1 0
2 2
1 0
NOTES:XW =M Q>
~W KA.~
REC IP IE'NT COPIES ID'CODE/NAME LTTR ENCL ACTION:
05 PM Pl
~ <'//+~+
1 1
BC 4.4gJg -+ C(
1 0
RECIPIENT ID CODE/NAME AD I.ILl 0?
NRC PDR 08 OPERA LIC BR 10 QAB 12 STRUC ENG BR 15 REAC SYS BR 17 CORE PERF BR 19 CONTAIN SYS 21 POWER SYS BR 26 ACCDNT ANLYS 28 RAD ASMT BR AD FOR, ENG AD REAC SAFETY DIRECTOR NRR MPA COPIES LTTR ENCL 1
0 1
0 1
1 1
1 1
1 1
1 1
1 1
1 1
1.
1 1
1 1
1 1
1 0
0 1
0 1
0 WMWWWWMWWWPWWW~ WMOOM~~ MM MMWOOWWWtgaMMM EXTERNAL: 03 LPDR 30 ACRS 1
1 10 10 04 NSIC 1
1 w+o+E Era ua 8C 8'. 8 E8'c.us 8lg gag N4 cA APR 4 1980 g8 Q3 TOTAL NUMBER OF COPIES REQUIRED:
LTTR ~
ENCL'
1 i
I I'
Washington Public Power Supply System A JOINT OPERATING AGENCY P, O. BOX 968 Docket No. 50-397 3000 GCO. WAIHINOTON WAY RICHLAND, WAIHINOTON 99352 PHONC (509) 375 5000 G02-80-62 March 10, 1980 Director, Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington D.C.
20555 Attention:
Mr. L. Rubenstein, Chief Branch No.
4 Division of Project Management
Subject:
WPPSS NUCLEAR PROJECT NO.
2 FSAR AMENDMENT 8
Dear Mr. Rubenstein:
The Washington Public Power Supply System herewith submits sixty (60) copies of Amendment 8 to its Final Safety Analysis Report.
Pursuant to 10CFR2.101, we will, within ten (10) days of filing, furnish to you an affidavit reflecting our distribution of this amendment to your designated distribution list.
Very truly yours, DLR:CDT:ct cc:
JJ Verderber, B&R, NY HR Canter, B&R, NY RC Root, B&R (site)
J Ellwanger, B&R, NY FA MacLean, GE E
- Chang, GE NS Reynolds, Debevoise
& Liberman M
RENBERGER Assistant Director-Technology ol g,O IS
~I(o ooo,cosoppq
C'
~
J' I
'l H
STATE'OF" WASHI'NGTON)
WPPSS NUCLEAR PROgECT NO COUNTY OF BENTON
)
ss FSAR AMENDMENT 8 D. L.
RENBERGER, Being first duly sworn, deposes and says:
That he is the Assistant Director, Technology, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that he is authorized to, submit the fore-going on behalf of said applicant; that he has read the foregoing and knows the contents thereof; and believes the same to be true to the best of his knowledge.
DATED ~~ ~E
, 1980 D. L.
RENBERGER On this day personally appeared befor'e me D. L.
RENBERGER to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his fr ee act and deed for the uses and pur poses therein mentioned.
EIYEN under my hand and seal this 2>
day of 4 l1 AJ c 4
, 1980 Notary Pub ic in and for the State of Washington Residing at
~ ~
C
>Nt
/ >i lp II 1
I'