ML17272A892
| ML17272A892 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 03/21/1980 |
| From: | WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | |
| Shared Package | |
| ML17272A890 | List: |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8004020296 | |
| Download: ML17272A892 (1) | |
Text
WPPSS NUCLEAR PROJECT N0.2 REPORTABLE DEFICIENCY AND CORRECTIVE ACTION FOR INSTALLATION OF MISSILE PRODUCING E(UIPMENT WITHIN CLASS IE AREA WASHINGTON PUBLIC POWER SUPPLY SYSTEM DOCKET NO. 50-397 LICENSE NO.
CPPR-93 Discri tion of deficienc The potential missile producing nonsafety related RPS MG Sets are installed in a Class IE Area.
This installation arrangement imposes a
potential hazzard to the safety related. equipment in the area.
Safet Si nificance In the event of a flywheel failure, the lack of positive protection barriers between the RPS M G Set flywheels and the adjacent Class IE equipment could result in the loss of or damage to, safety related equipment in the area.
In this instance, assuming a single failure in one Division, the alternate Division could be disabled due to a missile generating failure of the RPS M G Sets.
Corrective Action Protective barriers are being designed.
The installation of these protective barriers, in the event of a RPS M G flywheel failure, wi 11 preclude any potential missile damage to the Class IE equipment in the area.
80040@0 z, i~