ML17272A818
| ML17272A818 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 09/05/1979 |
| From: | Renberger D WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| IEB-79-16, NUDOCS 8002200748 | |
| Download: ML17272A818 (1) | |
Text
Ig Washington Public Power Supply System A JOINT OPERATING AGENCY P. O. BOX 958 3000 GEO, WASHINGTON WAY RICHI.ANO. WASHINOYON 99352 PHONE (509) 315.5000 Docket No. 50-397 SEP S-t979 0
g tP +iA V'r.
R.
H. Engelken, Director U. S. Nuclear Regulatory Commission Region V
1990 N. California Boulevard Suite 202, Walnut Creek Plaza Walnut Creek, California 94956
Dear Hr. Engelken:
Subject:
WASHINGTON PUBLIC POWER SUPPLY SYSTEH
RESPONSE
TO IE BULLETIN NO. 79-16 DOCKET NUHBER 50-397 This letter represents the Supply System response to IE Bulletin No. 79-16, "Vital Area Access Controls".
The Supply System currently has no plants with Operating Licenses.
The WNP-2 plant is now in the review process for an Operating License and is awaiting NRC response to the Physical Security Plan submittal.
The commitments in the WNP-2 Physical Security Plan are in accord with the cri teria established in Action Items one through nine of IE Bulletin No. 79-16..
The specific procedures which will address these criteria have not been'formulated and will not be formulated until the commitments made in the WNP-2 Physical Security Plan have been reviewed and commented on by the NRC review group, and the electronic control system final design has been confirmed.
Please be assured that all WNP-2 access control planning and procedures development will consider the criteria set forth in IE Bulletin No. 79-16.
Sincerely, svmd D. L. Renberger Assistant Director, Technology