ML17272A808
| ML17272A808 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 09/11/1979 |
| From: | Renberger D WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| IEB-79-14, NUDOCS 8002150342 | |
| Download: ML17272A808 (1) | |
Text
Washington Public Power Supply System A JOINT OPERATING AGENCY P. O. BOX 958 3000 GSO. WASHiNOTON WAY R<CHLANO. WASHINOTON 99352 PHONS (509) 375.5000 Docket No. 50-397 September ll, 1979 G02-79-157 Hr.
R.
H. Engelken, Director U. S. Nuclear Regulatory Commission 1990 N. California Boulevard Suite 202, Walnut Creek Plaza Walnut Creek, CA 94596
Subject:
WPPSS NUCLEAR PROJECT NO.
I
Reference:
DL Renberger, Letter to RH Engelken, dated 9/7/79, same subject.
Dear Hr. Engelken:
The referenced letter was our response to items 2 and 3 of the subject IE Bulletin.
Although the Washington Public Power Supply System as an applicant is not required to respond to the item 1 of this Bulletin, the attached i n-formation is submitted for your consideration.
Very truly yours, DLR:FJ:ds Attachment D. L.
RENBERGER Assistant Director - Technology J
0 JI r.,
r
'~J-~C, ~
r(
JJ 8008150 jg-/~ ~~