ML17272A744

From kanterella
Jump to navigation Jump to search
Forwards Final Deficiency Rept Re ECCS Pump Room Flooding
Date released: 06/27/2018 Download: ML17272A744


Final Deficiency Rept Re ECCS Pump Room Flooding.Fuel Pool Cooling Sys Is Not Designed to Seismic Category 1 or Class IE Stds.Fuel Pool Cooling Sys Will Be Upgraded Through re-analysis & Redesign to Improve Reliability
ML17272A745
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/30/1979
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
References
Download: ML17272A745 (2)
Forwards Final Deficiency Rept Re ECCS Pump Room Flooding
ML17272A743
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/30/1979
From: Renberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: ENGELKEN R H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
Download: ML17272A743 (4)