February 4, 1999 Dr. Robert C. Mecredy Vice President, Nuclear Operations Rochester Gas and Electric Corporation 89 East Avenue Rochester, NY 14649
SUBJECT:
REQUEST FOR RELIEF NO. 36 FROM THE AMERICANSOCIETY OF MECHANICALENGINEERS (ASME) CODE SECTION XI REQUIREMENTS FOR THE R. E. GINNA NUCLEAR POWER PLANTTHIRD 10-YEAR INSERVICE INSPECTION INTERVAL'(TACNO. MA4386)
Dear Dr. Mecredy:
By letter dated December 18, 1998, you requested relief (RR-36) from the examination requirement of the ASME Code,Section XI, for certain reactor vessel nozzle-to-safe end welds, pursuant to the provisions of 10 CFR 50.55a(g)(5)(iii) for the third 10-year inspection interval of the unit. The NRC staff concludes that the requirement of the Code is impractical and relief is granted and the alternative inspection imposed pursuant to 10 CFR 50.55a(g)(6)(i). The relief granted is authorized by law and will not endanger life or property, or the common defense and security and is otherwise in the public interest giving due consideration to the burden upon the licensee ifthe requirements were imposed on the facility.
The staff's evaluation and conclusion are contained in the enclosed safety evaluation.
Therefore, the subject request for relief from the Code requirement is granted for the third 10-year inspection interval.
Sincerely, Original signed by:
S. Singh Bajwa, Director Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-244
Enclosure:
Safety Evaluation ccw/encl: See next page DISTRIBUTION:
See attached DOCUMENT NAME: G'LGINNAERELA4386.WPD
- See Previous Concurrence To receive a copy of this docunent, indicate in the box:
<<C>> << Copy without attachment/enclosure
<<E<< << Copy with attachment/enclosure
<<N<< << No co OFFICE PH:PDI-1 LA:PDI-1 D:PDI-1 OGC*
NAHE GVissing:Icc SLittl SBaJwa HYoung DATE 02/
/99 02/
/99 02/
/99 01/25/99 VVO2Oioa06 9eohOe PDR ADOCK 05000244 8
PDR OFFICIALRECORD COPY I
February 4, 1999 Dr. Robert C. Mecredy Vice President, Nuclear Operations Rochester Gas and Electric Corporation 89 East Avenue Rochester, NY 14649
SUBJECT:
REQUEST FOR RELIEF NO. 36 FROM THE AMERICANSOCIETY OF MECHANICALENGINEERS (ASME) CODE SECTION XI REQUIREMENTS FOR THE R. E, GINNA NUCLEAR POWER PLANTTHIRD 10-YEAR INSERVICE INSPECTION INTERVAL'(TACNO. MA4386)
Dear Dr. Mecredy:
By letter dated December 18, 1998, you requested relief (RR-36) from the examination requirement of the ASME Code,Section XI, for certain reactor vessel nozzle-to-safe end welds, pursuant to the provisions of 10 CFR 50.55a(g)(5)(iii) for the third 10-year inspection interval of the unit. The NRC staff concludes that the requirement of the Code is impractical and relief is granted and the alternative inspection imposed pursuant to 10 CFR 50.55a(g)(6)(i). The relief granted is authorized by law and willnot endanger life or property, or the common defense and security and is otherwise in the public interest giving due consideration to the burden upon the licensee ifthe requirements were imposed on the facility.
The staff's evaluation and conclusion are contained in the enclosed safety evaluation.
Therefore, the subject request for relief from the Code requirement is granted for the third 10-year inspection interval.
Sincerely, Original signed by:
S. Singh Bajwa, Director Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-244
Enclosure:
Safety Evaluation ccw/encl: See next page DISTRIBUTION:
See attached
- See Previous Concurrence DOCUMENT NAME: G:LGINNARELA4386.WPD To receive a copy of this,document, indicate in the box:
>>C>>>> Copy uithout attachment/enclosure>>E>>>>
Copy arith attachment/enclosure
>>ii>> >> No co OFFICE PM:PDI-1 LA:PDI-1 D:PDI.1 OGC>>
BANE GVissing: Icc SLittl BBa ua NYoung DATE 02/
/99 02/
/99 02/
/99 01/25/99 OFFICIALRECORD COPY
0
.l
t 1,AR REGS
~o Cy
++*++
Dr. Robert C. Mecredy Vice President, Nuclear Operations Rochester Gas and Electric Corporation 89 East Avenue Rochester, NY 14649 UNIT,ED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON> D.C. 20555-0001 February 4, 1999
SUBJECT:
REQUEST FOR RELIEF NO. 36 FROM THE AMERICANSOCIETY OF MECHANICALENGINEERS (ASME) CODE SECTION XI REQUIREMENTS FOR THE R. E. GINNA NUCLEAR POWER PLANTTHIRD 10-YEAR INSERVICE INSPECTION INTERVAL(TAC NO. MA4386)
Dear Dr. Mecredy:
Therefore, the subject request for relief from the Code requirement is granted for the third 10-year inspection interval.
Sincerely, By letter dated December 18, 1998, you requested relief (RR-36) from the examination requirement of the ASME Code,Section XI, for certain reactor vessel nozzle-to-safe end welds, pursuant to the provisions of 10 CFR 50.55a(g)(5)(iii) for the third 10-year inspection interval of the unit. The NRC staff concludes that the requirement of the Code is impractical and relief is granted and the alternative inspection imposed pursuant to 10 CFR 50.55a(g)(6)(i). The relief granted is authorized by law and willnot endanger life or property, or the common defense and security and is otherwise in the public interest giving due consideration to the burden upon the licensee ifthe requirements were imposed on the facility.
The staff's evaluation and conclusion are contained in the enclosed safety evaluation.
Docket No. 50-244
Enclosure:
Safety Evaluation cc w/encl: See next page S. Singh Bajwa, Director Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
DATE: February 4, 1999 DISTRIBUTION:
Docket File PUBLIC PDI-1 R/F J. Zwolinski S. Bajwa S. Little G. Vissing T. Harris (e-mail SE only, TLH3)
OGC G. Hill (2 copies)
ACRS P. Patnaik B. McCabe R. Blough, RGN I L. Doerflein, RGN I cc w/encl: Plant Service list
DATE: February 4, 1999 DISTRIBUTION:
Docket File PUBLIC PDI-1 R/F J. Zwolinski S. Bajwa S. Little G. Vissing T. Harris (e-mail SE only, TLH3)
OGC G. Hill (2 copies)
ACRS P. Patnaik B. McCabe R. Blough, RGN I L. Doerflein, RGN I cc w/encl: Plant Service list
Dr. Robert C. Mecredy Rochester Gas and Electric Company R.E. Ginna Nuclear Power Plant CC:
Peter D. Drysdale, Sr. Resident Inspector R.E. Ginna Plant U.S. Nuclear Regulatory Commission 1503 Lake Road Ontario, NY 14519 Regional Administrator, Region I
U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. F. WilliamValentino, President New York State Energy, Research, and Development Authority Corporate Plaza West 286 Washington Avenue Extension Albany, NY 12203-6399 Charles Donaldson, Esquire Assistant Attorney General New York Department of Lalw 120 Broadway New York, NY 10271 Nicholas S. Reynolds Winston & Strawn 1400 S Street N.W.
Washington, DC 20005-3502 Ms. Thelma Wideman, Director Wayne County Emergency Management Office Wayne County Emergency Operations Center 7336 Route 31 Lyons, NY 14489 Ms. Mary Louise Meisenzahl Administrator, Monroe County Office of Emergency Preparedness 111 West Falls Road, Room 11 Rochester, NY 14620 Mr. Paul Eddy
, New York State Department of Public Service 3 Empire State Plaza, 10th Floor Albany, NY 12223