ML17265A398
| ML17265A398 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 08/06/1998 |
| From: | Mecredy R ROCHESTER GAS & ELECTRIC CORP. |
| To: | Vissing G NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| TAC-M84947, NUDOCS 9808130295 | |
| Download: ML17265A398 (5) | |
Text
CATEGORY 1 REGULAT INFORMATION DISTRIBUTION STEM (RIDS)
ACCESSION NBR:9808130295 DOC.DATE: 98/08/06 NOTARIZED: NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
AUTH.NAME AUTHOR AFFIL1ATION MECREDY,R.C.
Rochester Gas 8 Electric Corp.
RECIP. NAME RECIPIENT AFFILIATION VISSING,G.S.
DOCKET 05000244
SUBJECT:
Submits response to NRC 980626 RAI relating to analysis to evaluate effects of one service water pump available C
Post-Loss-Of-Coolant Accident.
DISTRIBUTION CODE: A065D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Generic Ltr 89-13
- Svc Water Sys Problems Affecting Safety-Related E~
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72) 05000244 E RECIPIENT ID CODE/NAME VISSING,G.
INTERNAL: AEOD/SPD/RAB NRR/DRPM/PDLR COPIES LTTR ENCL RECIPIENT ID CODE/NAME FILE C NTER~
0
/D SA/SPLB COPIES LTTR ENCL EXTERNAL: NOAC NRC PDR D
E N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 7
ENCL
k t
C I
C I'
t
)
a
AND 3K~%
ROCHESTER GAS ANDELECTRIC CORPORATION 89EASTAVENUE, ROCHESTER, N. Y 14649-0001 AREA CODE 716-546-2700 ROBERT C. MECREDY Vice President Nudeor Operotions August 6, 1998 U.S. Nuclear Regulatory Commission Document Control Desk Attn:
Guy S. Vissing Project Directorate I-1 Washington, D.C.
20555
Subject:
Request for Additional Information (RAI) Related to the Analysis to Evaluate the Effects of One Service Water Pump Available Post-Loss-of-Coolant Accident (TAC No.
M84947)
Dear Mr. Vissing:
The letter is in response to the NRC's letter dated June 26, 1998 that requested RG&E to respond to a
request for additional information (RAI) related to one-Service-Water-Pump operation.
RG&E has available the information needed to respond to this
- request, but we propose to defer formal response until September 11, 1998 for the following reasons:
1)
RG&E has been in the process of improving both the operation of the Service Water System as well as our knowledge of its operation.
This has been accomplished through modification enhancements (stainless steel impeller installed in July 1998) and performance testing.
These improvements have required changes to the thermal hydraulic modeling of the Service Water System.
This enhanced model will be used to respond to the RAI.
,v 9808130295 98080tct PDR ADQCK 05000244 P
2)
RG&E is in the process of closing out all items related to Generic Letter 89-13 and has scheduled a meeting with the NRC in late August.
Any issues emanating from that meeting are planned to be factored into our responses.
We trust that this deferral will result in a more comprehensive response to facilitate closure of this issue.
Very truly yours, Robert C. Mecredy
,mab:505 xc:
Mr. Guy S. Vissing (Mail Stop 14B2)
Project Directorate I-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U.S.
NRC Ginna Senior Resident Inspector
~ JQ a4 0
t ~
4
'n 'v~