ML17265A296

From kanterella
Jump to navigation Jump to search
Forwards 1998 Rept of Facility Changes,Tests & Experiments Conducted W/O Prior Approval for Aug 1996 Through Dec 1997 Under Provisions of 10CFR50.59.
ML17265A296
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/21/1998
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17265A297 List:
References
NUDOCS 9805280212
Download: ML17265A296 (6)


Text

CATEGORY 1y t

REGULA~i'Y INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9805280212 DOC.DATE: 98/05/21 NOTARIZED: NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G DOCKET 05000244 I

AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.

REC1P.NAME Rochester Gas &, Electric Corp.

RECIPIENT AFFILIATION 5~ +

SUBJECT:

Forwards "1998 Rept of Facility Changes, Tests Ec Experiments Conducted W/0 Prior Approval for Aug 1996 through Dec 1997 Under Provisions of 10CFR50.59."

DISTRIBUTION CODE: IE47D COPIES RECEIVED:LTR I ENCL ) SIZE: ol 50.59 Annual Report of Changes, Tests or Experiments Made W/out Approv~ 4'ITLE:

NOTES':License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 PD 1 0 VISSING,G. 1 1 INTERNAL R CENTER 1 1 RGN1 FILE 01 1 1 ,I EXTERNAL: NOAC 1 1 NRC PDR Y

1 1 D

0 C

U NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DZSTRZBUTION LISTS I OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 6 ENCL 5

e 0

AND AREA CODE 7I6 5'.2700 ROBERT C. IAECREDY May 21, 1998 Vice President Noeteor Otserotions U.S. Nuclear Regulatory Commission Document Control desk Attn: Guy S. Vissing Project Directorate I-1 Washington, 'D.C. 20555

Subject:

Report of Facility Changes, Tests, and Experiments Conducted Without Prior Commission Approval R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

The subject report is hereby submitted as required by 10 CFR 50.59(b). The enclosed report contains descriptions and summaries of the safety evaluations conducted in support of proposed changes to the facility and procedures described in the UFSAR and special tests, from August 1996 through December 1997, performed under the provisions of 10 CFR 50.59.

Very y yours, Robert C. Mecredy Attachment xc: Mr. Guy S. Vissing (Mail Stop 14B2)

Project Directorate I-1 Division of Reactor Projects VII Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 9805280212 98052i PDR ADOCK 05000244 R PDR

0 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector

0