Responds to Generic Ltr 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps. Util Is Expecting to Submit Requested Info by 980108
ML17264B083
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/03/1997
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-04, GL-97-4, NUDOCS 9711120012
Download: ML17264B083 (5)


Text

CATEGORY 1 REGULAT014ZNFQRMATZON DZBTRZBUTZON QTEM (RZDB) v~

ACCESSION NBR:9711120012 DOC.DATE: 97/11/03 NOTARIZED: YES DOCKET FACIL:50=244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH.NAME AUTHOR AFFILIATION MECREP-".-,R.C.

Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION VISSINGFG.S.

SUBJECT:

Thirty day response to GL 97-04, "Assurance of Sufficient Net Positive Suction Head for ECC 6 Containment Heat Removal Pumps."

Submittal of required info by 970108.

DISTRIBUTION CODE:

A001D COPIES RECEIVED:LTR ENCL SI'ZE:

TITLE: OR Submittal:

General Distribution NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 A

T RECIPIENT ID CODE/NAME PD1-1 LA VISSINGFG.

INTERNAL:

ER 0

NRR/DE/EM NRR/DSSA/SPLB NUDOCS-ABSTRACT EXTERNAL: NOAC COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD1-1 PD NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS3 NRC PDR COPIES LTTR ENCL 0

D 0

N NOTE TO ALL NRIDSM RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.

TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 13 ENCL

0 Jg1 lh E

~b [

l1

f AND ROQAESTER GAS ANDELECTRIC CORPORATION ~ 89 EASTAtrrENUE, ROCHESTER, N. Y Id649-0001 ARFA CODE716 5'.2700 ROBERT C. MECREDY Vice President Nuclear Operations November 3, 1997 U.S. Nuclear Regulatory Commission Document Control Desk Attn:

Guy S. Vissing Project Directorate I-1 Washington, D.C.

20555

Subject:

30 Day Response to Generic Letter 97-04, "Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling and Containment Heat Removal Pumps" R.

E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

In the subject correspondence, it was requested that licensees respond within 30 days to the following items:

(a) whether or not the requested information [within GL 97-04]

will be submitted, and (b) whether or not the requested information will be submitted within the requested time period (90 days from date of GL 97-04).

RG&E is expecting to submit the requested information, and submit it within the requested time period (by January 8, 1998.)

If there is any change to this projected content and schedule, RG&E will provide an alternative course of action and the basis for its acceptability, as required by the generic letter.

Very ruly yours, GJWi481 Robert C. Mecr dy Subscribed and sworn to before me o

this 3rd day of No

mber, 1997.

Notary Public DEBORAH A.pfpERNI lrt ffte Sfrtfe of N y~

0NTARI0COuNTy GRlt1llsaort Etcpires N~

97iii200i2 97ii03 PDR ADQCK 05000244 P

PDR IIIIIIIIIIII!!IIIIIIIIIIIIIII!IIIIIIIIII.'

XC ~

Mr. Guy S. Vissing (Mail Stop 14B2)

.Project Directorate I-1 Washington, D.C.

20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 US NRC Ginna Senior Resident Inspector

O.

4.