Text
Dr. Robert'.
Mecredy gg Vi.l'.e President, Nuclear Operations
'Rochester Gas and Electric Corporation 89 East Avenue Rochester, NY 14649 Aulft 7, 1997
SUBJECT:
ROCHESTER GAS AND ELECTRIC CORPORATION, REVIEW OF PLANT-SPECIFIC APPLICABILITY OF WESTINGHOUSE TOPICAL REPORT WCAP-14535 FOR THE R.
E.
GINNA NUCLEAR POWER PLANT (TAC NO. M98378)
Dear Dr. Mecredy:
By letter dated March 18,
- 1997, as supplemented by letter dated July 8,
- 1997, you submitted for NRC staff review your 'staff's assessment of the plant-specific applicability of Westinghouse Topical Report WCAP-14535, "Topical Report on Reactor Coolant Pump Flywheel Inspection Elimination," to the R.
E.
Ginna Nuclear Power Plant.
The staff has completed its review of this information.
The safety evaluation (SE) is provided in the enclosure.
In this SE, the staff determined that the submittal has satisfied all conditions specified in the SE dated September 12, 1996, for WCAP-14535, and has demonstrated the plant-specific applicability of WCAP-14535 for Ginna.
Therefore, we have determined that you may change R.
E. Ginna Inservice Inspection Program to reflect the revised flywheel inspection interval of 10 years in accordance with the conclusion of the SE for WCAP-14535.
Sincerely, Docket No. 50-244
Enclosure:
Safety Evaluation cc w/encl:
See next page DISTRIBUTION:
/s/
Guy S. Vissing, Senior Project Manager Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear, Reactor Regulation Docket File PUBLIC PDI-1 R/F B. Boger J. Zwolinski A. Dromerick S. Little T. Harris (email SE only)
OGC ACRS L. Doerflein, RI 9708i 30397 r7I70807 PDR ADQCK 05000244 8
PDR DOCUMENT NAME:
G: iGINNAiM98378.SER To receive a copy of this document, indicate in the box:
"C" = Copy without attachment enclosure "E" = Co with attachment enclosure "N" = No co OFFICE PH:PDI-1 E
LA:PDI-1 D:PDI-1 GViss ing/rs I
/
SL 1tt I A. Dromerlck(A)
DATE 08/
/97 08/
/97 08/
/97
~.gal.8 Official ecord Copy t
llllilllfllfllfJlffllfilllllllglffllll ma@ IIII@@+
gy,R REGIj Cq 4,
A0 C
O Ie0
~0
+a*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON> D.C. 20555-0001 August 7, 1997 Dr. Robert C. Mecredy Vice President, Nuclear Operations Rochester Gas and Electric Corporation 89 East Avenue Rochester, NY 14649
SUBJECT:
ROCHESTER GAS AND ELECTRIC CORPORATION, REVIEW OF PLANT-SPECIFIC APPLICABILITY OF WESTINGHOUSE TOPICAL REPORT WCAP-14535 FOR THE R.
E.
GINNA NUCLEAR POWER PLANT (TAC NO. M98378)
Dear Dr. Mecredy:
By letter dated March 18,
- 1997, as supplemented by letter dated July 8,
- 1997, you submitted for NRC staff review your staff's assessment of the plant-specific applicability of Westinghouse Topical Report WCAP-14535, "Topical Report on Reactor Coolant Pump Flywheel Inspection Elimination," to the R.
E.
Ginna Nuclear Power Plant.
The staff has completed its review of this information.
The safety evaluation (SE) is provided in the enclosure.
In this SE, the staff determined that the submittal has satisfied all conditions specified in the SE dated September 12, 1996, for WCAP-14535, and has demonstrated the plant-specific applicability of WCAP-14535 for Ginna.
Therefore, we have determined that you may change R.
E. Ginna Inservice Inspection Program to reflect the revised flywheel inspection interval of 10 years in accordance with the conclusion of the SE for WCAP-14535.
Docket No. 50-244
Enclosure:
Safety Evaluation cc w/encl:
See next page Guy S. Vissing, Senior roject Manager Project Directorate I-l Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Dr. Robert C. Mecredy R.E.
Ginna Nuclear Power Plant CC:
Peter D. Drysdale, Senior Resident Inspector R.E. Ginna Plant U.S. Nuclear Regulatory Commission 1503 Lake Road
- Ontario, NY 14519 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. F. William Valentino, President New York State
- Energy, Research, and Development Authority Corporate Plaza West 286 Washington.Avenue Extension
- Albany, NY 12203-6399 Charlie Donaldson, Esq.
Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Nicholas S. Reynolds Winston 5 Strawn 1400 L St.
N.W.
Washington, DC 20005-3502 Hs.
Thelma Wideman
- Director, Wayne County Emergency Management Office Wayne County Emergency Operations Center 7336 Route 31
- Lyons, NY 14489 Hs. Mary Louise Meisenzahl Administrator, Monroe County Office of Emergency Preparedness 111 West Fall
- Road, Room ll Rochester, NY 14620 Mr. Paul Eddy New York State Department of Public Service 3 Empire State
- Plaza, Tenth Floor
- Albany, NY 12223