Dr. Robert C. Mecredy Vice President, Ginna Nuclear Operations Rochester Gas and Electric Corporation 89 East Avenue Rochester, NY 14649
SUBJECT:
PLANT PERFORMANCE REVIEW (PPR) - GINNA
Dear Dr. Mecredy:
On March 25, 1997, the NRC staff completed the semiannual Plant Performance Review (PPR) of the Ginna Nuclear Power Plant.
The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance.
The results are used by NRC management to facilitate planning and allocation of inspection resources.
The PPR for Ginna involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period October 1996 through March 1997.
PPRs provide NRC management with a cu rrent summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting
(
)
reviews.
This letter advises you of our planned inspection effort resulting from the Ginna PPR review.
It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite.
The enclosure details our inspection plan for the next 6 months. The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas.
Resident inspections are not listed due to their ongoing and continuous nature.
We will inform you of any changes to the inspection plan.
If you have any questions, please contact me at (610) 337-5378.
Sincerely, Original Signed by:'awrence T. Doerflein, Chief Projects Branch 1
Division of Reactor Projects ltlllllllllllllfllllljlllllllg OFFICIAL RECORD COPY
Robert C. Mecredy Docket No. 50-244" License No. DPR-18
Enclosure:
Inspection Plan cc w/encl:
R. Smith, Senior Vice President, Customer Operations Central Records (7 copies)
P. Eddy, Director, Electric Division, Department of Public Service, State of New York State of New York, Department of Law N. Reynolds, Esquire F. William Valentino, President, New York State Energy Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority
Robert C. Mecredy Distribution w/encl:
Region I Docket Room (with concurrences)
PUBLIC NRC Resident Inspector Nuclear Safety Information Center (NSIC)
J. Wiggins, DRS L. Nicholson, DRP DRS Branch Chiefs D. Screnci, PAO J. Lanning, DRM R. Correia, NRR D. R. Taylor, NRR L. Cunningham, NRR D. Barss, NRR R. Ragland, DRS L. Doerflein, DRP T. Moslak, DRP M. Oprendek, DRP R. Junod, DRP Distribution w/encl (VIA E-IVIAIL):
W. Dean, OEDO S. Bajwa, NRR G. Vissing, NRR A. Dromerick, NRR M. Campion, ORA Inspection Program Branch, NRR (IPAS)
DOCDESK DOCUMENT NAME: G:iBRANCH1iGNLTR.RV1 To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP NAME TMoslak +
DATE 05/I f/97 RI/DRP LDoerf Icing 05/I~ /97 OFFICIAL RECORD COPY
Ginna (ns ection Ptan Enclosure IP - Inspection Proce'dure Tl - Temporary Instruction CO - Core Inspection - Minimum NRC Inspection Program (mandatory all plants)
- .
- TITLE/PROGRAMgi,":",;:"j<'"-"',>>::."::.INSPECTl0$ ':,':::
START
-'P 81700-1 IP 84750 IP 82301 IP 84750 IP 82302 IP 86750 Physical Security Program Radwaste Treatment 5 Effluents EP Exercise-Full Participation Architect/Engineer Inspection Radwaste Treatment 5 Effluents Environmental Monitoring Operational Status of the EP Program Solid Radwaste Management 5.
Transportation 5/27/97 6/2/97 6/9/97 7/97 7/28/97 8/11/97 8/1 8/97 CO CO CO Rl - Evaluate conformance of the plant to design basis documents.
CO CO CO IP 64704 IP 92903 TI 2515/109 Fire Protection Program 8/24/97 Engineering Followup 8/97 MOV GL 89-10 Closure 10/97 CO Rl - Management Directed Initiative, Spent Fuel Pool Leakage Effects on RHP pump room structures, systems and components.