<gb BE00
~ +
0 Cy sf O
~,, +
0
++kw+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 9, 1997 Dr. Robert C. Hecredy Vice President, Nuclear Operations Rochester Gas and Electric Corporation 89 East Avenue Rochester, NY 14649
SUBJECT:
RE(VEST FOR RELIEF FROH THE AHERICAN SOCIETY OF HECHANICAL ENGINEERS (ASHE)
CODE SECTION XI REOUIREHENTS FOR R.
E.
GINNA NUCLEAR POWER PLANT (TAC NO. H97280)
Dear Dr. Hecredy:
By letter dated November 14,
- 1996, you responded to the Safety Evaluation (SE) dated Hay 28,
- 1996, by providing additional information in support of Relief Requests VR-8 Revision 1 and VR-9 Revision 1 for the Ginna Nuclear Power Plant, Third 10-Year Interval Program for Inservice Testing (IST) of valves.
The alternative testing proposed for these relief request revisions in your earlier submittals (dated January 12,
- 1996, and Harch 27, 1996) had been authorized in the Hay 28,
- 1996, SE for 1 year to allow you time to justify the proposed alternatives on a long-term basis.
Your proposed alternative would replace the current disassembly schedule of'these check valves (two valves every 6 years) wi'th a more frequent testing schedule (all four valves every three refueling outages).
The enclosed SE addresses alternative proposals for the requirements of Section XI of the ASHE Boiler and Pressure Vessel Code (ASHE Code) at the R.
E. Ginna Nuclear Power Plant during the Third 10-Year Interval Program for Inservice Testing of pumps and valves.
Relief Re uest VR-8 Revision 1 and Re uest VR-9 Revision The alternative proposals in VR-8 Revision 1 and VR-9 Revision 1 are authorized pursuant to 10 CFR 50.55(a)(3)(i) in that the alternatives provides an acceptable level of quality and safety.
The NRC staff concludes that the relief requests as evaluated by the SE will not compromise the reasonable assurance of operational readiness of pumps and valves in question to perform their safety-related functions.
The staff has 9704iioi27 970409 PDR AoaCK 05000244 PDR
~ 8
R.'ecredy 4
- 2 April 7, 1997 determined that authorization of alternatives pursuant to 10 CFR 50.55a(a)(3)(i) is authorized by law and will not endanger life or property, or the common defense and security and is otherwise in the public interest.
Sincerely, Docket No. 50-244
/s/
I S. Singh Bajwa, Acting Director Project Directorate I-l Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Enclosure:
Safety Evaluation cc w/encl:
See next page DISTRIBUTION:
Docket File PUBLIC PDI-1 R/F S.
Varga S.
Bajwa S. Little G.
Vissing,,'.
Harris (e-mail)
OGC G. Hill (2)
ACRS SECY M. Dean L. Doerflein, Region I I
DOCUMENT NAME:
G: iGINNAiH97280.REL
- See Previous Concurrence To receive a copy of this document, indicate in the box:
"C" = Copy without attachment enclosure "E" = Co y ith attachment enclosure "N" = No co y OFFICE PH:PDI-1 E
LA:PDI-1 0:PDI-1 OGC*
HAHE GVissing/rsl
/
SLittl SBa wa EHoi ler DATE 04/
/97 04/
/97 04/
/97 0
icosa Recor Copy 04/07/97
l H
I
1 '. Hecredy determined that authorization of alternatives pursuant to 10 CFR 50.55a(a)(3)(i) is authorized by law and will not endanger life or property, or the common.defense and security and is otherwise in the public interest.
Sincerely, Docket No. 50-244
Enclosure:
Safety Evaluation cc w/encl:
See next page S. Singh Bajwa, Acting Director Project Directorate I-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
I
Dr'. Robert C. Hecredy R.E. Ginna Nuclear Power Plant CC:
Peter D. Drysdale, Senior Resident Inspector R.E. Ginna Plant U.S. Nuclear Regulatory Commission 1503 Lake Road
- Ontario, NY 14519 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Hr. F. William Valentino, President New York State
- Energy, Research, and Development Authority Corporate Plaza West 286 Washington Avenue Extension
- Albany, NY 12203-6399 Charlie Donaldson, Esq.
Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Nicholas S.
Reynolds Winston 8 Strawn 1400 L St.
N.W.
Washington, DC 20005-3502 Ms. Thelma Wideman
- Director, Wayne County Emergency Management Office Wayne County Emergency Operations Center 7336 Route 31
- Lyons, NY 14489 Ms. Mary Louise Heisenzahl Administrator, Monroe County Office of Emergency Preparedness ill West Fall Road, Room ll Rochester, NY 14620 Mr. Paul Eddy New York State Department of Public Service 3 Empire State
- Plaza, Tenth Floor
- Albany, NY 12223