ML17264A770

From kanterella
Jump to navigation Jump to search
Forwards 1996 Rept of Facility Changes,Tests & Experiments Conducted Without Prior Approval for Aug 1995-Jul 1996,Under Provisions of 10CFR50.59
ML17264A770
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/16/1996
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17264A771 List:
References
NUDOCS 9612270091
Download: ML17264A770 (2)


Text

Gwi. UCVS.X J

REGULATO NFORMATION DISTRIBUTION.

TEM (RIDS) 4 ACCES'SION NBR:9612270091 DOC.DATE: 96/12/16 NOTARIZED:

NO DOCKET ¹

,ig,FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION VISSINGPG.S.

SUBJECT:

Forwards "1996 Rept of Faci3,ity Changes, Tests !'xperiments Conducted Without Prior Approval for Aug 1995-Jul 1996,Under C

For Provisions of 10CFR50.59."

A DISTRIBUTION CODE:

IE47D COPIES RECEIVED:LTR I

ENCL J SIZE:

TITLE: 50.59 Annual Report of Changes, Tests or Experiments Made W out Approv NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 E

RECIPIENT ID CODE/NAME PDI-I PD INTERNA ILE CENTER EXTERNAL: NOAC COPIES LTTR ENCL 1

0 1

1 1

1 RECIPIENT ID CODE/NAME VISSING,G.

RGN1 FILE 01 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 D

E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 6

ENCL 5

AND ROCHESTER GAS ANDELECTRIC CORPORATION

~ 89 EASTAVENUE, ROCHESTER, N.Y. Id6d9.0001 AREA CODE 716 5'-2700 ROBERT C. MECREDY Vice President Nvcleor 0perotions December 16, 1996 U.S. Nuclear Regulatory Commission Document Control Desk Attn:

Guy S. Vissing Project Directorate I-1 Washington, D.C.

20555

Subject:

Annual Report of Facility Changes,

Tests, and Experiments Conducted Without Prior Commission Approval R.E.

Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

The subject report is hereby submitted as required by 10 CFR 50.59(b).

The enclosed report contains descriptions and summaries of the safety evaluations conducted in support of proposed changes to the facility and procedures described in the UFSAR and special

tests, from August 1995 through July
1996, performed under the provisions of 10 CFR 50.59.

Following this submittal, it is our intent to modify our annual submittal interval to an interval of within 6 months after each refueling outage.

This modification is consistent with 10CFR50.59(b) and 10CFR50.71(e),

and will result in a submittal being made approximately every 18 months or as dictated by the new fuel cycle recently instituted by RG&E.

Ver truly yours, Robert C.

Me redy Attachment TLHE443 xc: Mr. Guy S. Vissing (Mail Stop 14C7)

Project Directorate I-1 Washington, D.C.

20555 U.S. Nuclear Regulatory Commission Reg'ion I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector 9612270091 96123.6 PDR ADGCK 05000244 R

PDR