ML17264A718
| ML17264A718 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 10/28/1996 |
| From: | Mecredy R ROCHESTER GAS & ELECTRIC CORP. |
| To: | Vissing G NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GL-96-06, GL-96-6, NUDOCS 9611010076 | |
| Download: ML17264A718 (4) | |
Text
CATEGORY 1
/j REGULA'll ZNFORMATZON DZSTRZBUTZOCYSTEM (RZDS) jr'
'ACCESSION NBR:9611010076 DOC.DATE: 96/10/28 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
05000244 AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.
Rochester Gas a Electric Corp.
RECIP.NAME RECIPIENT AFFIIIATION VISSINGFG.
SUBJECT:
Provides response to GL 96-06, "Assurance of Equipment Operability 6 Containment Integrity During Design Basis Accident."
DISTRIBUTION CODE:
A072D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: GL 96-06, "Assurance of Equip Oprblty 6 Contain.Integ.
during Design C
A T
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244 E
RECIPIENT ID CODE/NAME NRR/WETZEL,B.
VISSINGF G.
INTERNA 'ILE C TER NRR DSSA SCSB EXTERNAL: NOAC COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD1-1 PD NRR/DE/EMEB NRR/DSSA/SPLB NRC PDR COPIES LTTR ENCL D
E N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 9
ENCL
1
AND ROCHESTER GASANDELECTRIC CORPORAT1ON e 89 FASTAVFNUF, ROCHESTER, N. Y Id649-0001 AREA CODE716 546-2700 ROBERT C. MECREDY Vice President Nvdear Operations October 28, 1996 U.S. Nuclear Regulatory Commission Document Control Desk Attn:
Guy Vissing Project Directorate I-1 Washington, D.C.
20555
Subject:
Response
Generic Letter 96-06, "Assurance of Equipment Operability and Containment Integrity During Design Basis Accident R.E.
Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Johnson:
The purpose of this letter is to provide RG&E's 30 day response to the referenced letter which was received on October 2, 1996. It is RG&E's intention to complete the actions and submit the information as requested.
The information is expected to be completed within the 120 day time period. If it is determined that additional time is needed to complete the response, a request for an extension, as well as a status of the effort, will be provided prior to 120 days.
Very truly yours, REJtt439 Robert C. Mecredy xc:
Mr. Guy Vissing (Mail Stop 14C7)
Project Directorate I-1 Washington, D.C.
20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector pp19 0
'6ifOf0076 961028
'PDR
'i ADQCK 05000244 P
0 C
~)(x f (3