Confirms That Response to NRC 960618 RAI Will Be Submitted by 960901
ML17264A564
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/24/1996
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9608010057
Download: ML17264A564 (4)


Text

CATEGORY j-REGULA'I. RY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9608010057 DOC.DATE: 96/07/24 NOTARIZED: NO DOCKET I FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH.NAME AUTHOR AFFIL'IATION MECREDY,R.C.

Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

'VISSING,G.

SUBJECT:

Confirms that response to RAI re 960618 NRC ltr will be submitted by 960901.

DISTRIBUTION CODE: 00010 COPIES RECEIVED:LTR 2 ENCL hSISE:

TITLE: OR Submittal: General Distribution NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 RECIPIENT ID CODE/NAME PDl-1 LA VISSINGiG.

INTERNAL:

LE CENTER~

NR RCFNICB NRR/DSSA/SRXB OGC/HDS3 EXTERNAL: NOAC COPIES LTTR ENCL RECIPIENT ID CODE/NAME PDl-1 PD NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 12 ENCL

I

~

~

~

Pf

'I

~>a)

IL C

4ND 0

ROCHESTER GASANDELECTRIC CORPORATION ~ 89 EASTAVENUE, ROCHESTER, N. Y 14649-0001 AREA CODE716 546-2700 ROBERT C. MECREDY Vice President Nvcteor operations July 24, 1996 U.S. Nuclear Regulatory Commission Document Control Desk Attn:

Guy Vissing, Project Directorate I-1 Washington, D.C.

20555

Subject:

Reply to a Request for Additional Information R.E.

Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

By letter dated June 18, 1996, the NRC transmitted a Request for Additional Information.

Our response was due 30 days from receipt of the letter.

As discussed with the NRC reviewer, Howard Rathbun, RGGE is planning to respond by September 1,

1996.

Very truly yours, Robert C. Mecredy GJWtl,432 xc:

Mr. Guy Vissing (Mail Stop 14C7)

Project Directorate I-1 Washington, D.C.

20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector 9608010057 960724 PDR

,ADOCK 05000244 P0 '"'