Text
awAMLXA L L
t (ACCELERATED Rll)S I'ROCI'.SSIX REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSXON NBR:9512210195 DOC.DATE: 95/12/18 NOTARIZED: NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.
Rochester Gas
& Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.
DOCKET 05000244 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244 F
I COPIES LTTR ENCL 1
1 RECIPIENT ID CODE/NAME JOHNSON,A COPIES LTTR ENCL 1
0 RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL FILE CE TER 1
1 1
1 RGNl FILE 01 NRC PDR 1
1 1
1 EXTERNAL: NOAC
SUBJECT:
Forwards "1995 Rept.Of Facility Changes, Tests
& Experiments Conducted Without Prior Approval For Aug 1994 July 1995 per 10CFR50.59."
DISTRIBUTION CODE:
IE47D COPIES RECEIVED:LTR ENCL SIZE-(
TITLE-50.59 Annual Report of Changes, Tests or Experiments Made out p rov XO1'E TO ALL"RIDS" RECIPIENTS:
PLE:KSE ISELP l'S TO REDUCE KV%STE! CONTACT I'IIE DOCI.'LIEST COXTROI.
DESk. BOO%I Pl 37 IEXT. SN ~083 ) TO FLIXIIN:KTE5'OI.'R XAXILl<OXI DIS'I'RIBU'I'IOiLIS'I'S I'OR DOCUMI'.i'I'SYOU l)OX"I'II'.I)!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 6
ENCL 5
AND O~
ROCHESTER GAS ANDflfCTRICCORPORATION 89EASTAVENUE, ROC.ESTER, N V lrIcid9II
-'REA CODf7I6 5'6. 709 ROBERT C. MECREDY Vice Preiidenr Nvcleor Operotions December 18, 1995 U.S. Nuclear Regulatory Commission Document Control Desk Attn:
Allen R. Johnson Project Directorate I-1 Washington, D.C.
20555
Subject:
Annual Report of Facility Changes,.Tests, and Experiments Conducted Without Prior Commission Approval R.E; Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Johnson:
The subject report is hereby submitted as required by 10 CFR 50.59(b).
The enclosed report contains descriptions and summaries of the safety evaluations conducted in support of changes to the facility and procedures described in the UFSAR and special tests, from August 1994 through July 1995, performed under the provisions of 10 CFR 50.59.
Very truly yours, GAH/411 Robert C. Mecredy xc: Mr. Allen R. Johnson (Mail Stop 14B2)
Project Directorate I-1 Washington, D.C.
20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector P
c P0 ~i()
9512210195 9'5121 B PDR ADOCK 05000244 R