. P Rj!:(3RITY ACCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
P ~
ACCESSION NBR:9512060227 DOC.DATE: 95/11/30 NOTARIZED: NO DOCKET N
FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Roche'ster G
05000244 AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.
Rochester Gas
& Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.
SUBJECT:
Submits conversion to improved Tech Specs re 24 month refueling cycles.
DISTRIBUTION CODE:
AOOID COPIES RECEIVED:LTR J ENCL 0 SIZE:
TITLE: OR Submittal:
General Distribution NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244 INTERNAL.
RECIPIENT ID CODE/NAME PDl-1 LA JOHNSON,A E
DEN~TER 01 NRR/DRCH/HXCB NRR/DSSA/SRXB OGC/HDS3 COPIES LTTR ENCL RECIPXENT ID CODE/NAME PD1-1 PD NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT COPXES LTTR ENCL EXTERNAL: NOAC NRC PDR NOTE TO ALL"RlDS" R ECI PI ENTS:
PLEASE HELP US TO REDUCE iVASTE!CONTAC'I THE DOCUMENTCONTROL DESK, ROOb;I Pl-37 (EXT. 504-2083 ) TO ELINIINATEYOUR NAME PRO~I DISTRIBUTIONLISTS I'OR DOCI..'MENTS YOU DON"I'EED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 12 ENCL 11
AND ROCHESTER GASANDEIECIICCORPORATION ~ 89 FASTAtrrENUE, ROCHESTER, N. Y 146494MI ARFA CODE716 S46-2700 ROBERT C. MECREDY Vice President Hudeor Operations November 30, 1995 U.S. Nuclear Regulatory Commission Document Control Desk Attn:
Allen R. Johnson Project Directorate I-3 Washington, D.C. 20555
Subject:
Conversion to Improved Technical Specifications, 24 Month Refueling Cycles Rochester Gas &Electric Corporation R.E. Ginna Nuclear Power Plant Docket No. 50-244
Reference:
(a)
Letter from R.C. Mecredy, RG&E, to A.R. Johnson, NRC,
Subject:
Conversion To Improved Technical Specifications, dated May 26, 1995.
Dear Mr. Johnson,
By Reference (a), RG&E proposed to change the definition ofrefueling interval from 18 months to 24 months as part of the conversion to improved technical specifications for Ginna Station.
Attachment H of Reference (a) contains discussion related to the impact of the refueling interval change on instrumentation and mechanical equipment at Ginna Station.
Section D.3 and Table 4 of this attachment evaluate the change with respect to the reactor trip system, ESFAS, and other miscellaneous components.
Section D.3 makes a statement that "Ginna Station has not observed failures ofthese functions during previous testing." This statement was based on a review ofplant records associated with the tests listed on Table 4 between January 1985 and January 1995. This review, and a similar review of NPRDS records, did not indicate any failures of the subject components during this time frame.
As such, RG&E believes that historical data supports a
increased testing frequency of 24 months.
Please contact Mark Flaherty at (716) 724-8512 ifyou have any further questions.
Very t y yours, Robert C. Mecredy t '"-(.'073
'st512060227 951130 PDR ADOCK 05000240 i ",~.P,,,.,...PDR,.
Jerk+ P8aa>>fir~
"h V>>
tl
,l 1 j fi II MDF<781 Attachments U.S. Nuclear Regulatory Commission Mr. Allen R. Johnson (Mail Stop 14B2)
PWR Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Mr. Carl Schulten Technical Specifications Branch (Mail Stop 011E22)
Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King ofPrussia, PA 19406 Ginna Senior Resident Inspector