ML17264A165

From kanterella
Jump to navigation Jump to search
Informs That Info Being Provided to Plant Security Manager That Could Assist in Effort to Protect Plant Against design- Basis Threat for Sabotage
ML17264A165
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/26/1995
From: Andrea Johnson
NRC (Affiliation Not Assigned)
To: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
References
NUDOCS 9510020212
Download: ML17264A165 (5)


Text

~p,R REGS

~o Cy ClO 0

Yj I

+~

~O

++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&4001 September 26, 1995 Dr. Robert C. Hecredy Vice President, Nuclear Operations Rochester Gas and Electric Corporation 89 East Avenue Rochester, NY 14649

SUBJECT:

LESSONS LEARNED FROM NUCLEAR REGULATORY COHHISSION OPERATIONAL SAFEGUARDS

RESPONSE

EVALUATIONS

Dear Dr. Hecredy:

The Nuclear Regulatory Commission (NRC) Operational Safeguards

Response

Evaluation (OSRE) program has noted a variety of weaknesses and strengths associated with licensees'ontingency response capabilities in relation to their ability to protect their plant(s) against a design-basis threat for sabotage

[10 CFR 73. 1(a)].

In addition, the NRC investigation of the unauthorized forced entry to the protected area at the Three Hile Island Nuclear Station on February 7,

1993, prompted an evaluation of the need for guidance in response to authorized forced entry into a licensee's protected area.

This letter is to inform you that information is being provided to your plant security manager that could assist in your efforts to protect your plant against a design-basis threat for sabotage.

This information is (1) applicable sections of NUREG/CR-5172, "Tactical Training Reference Hanual," dated April 1989, which could be used in plant tactical security training programs, and (2) lessons learned in plant contingency responses identified through OSREs.

Because this information contains Safeguards Information, it is being withheld from public disclosure and will be forwarded with this letter only to your plant security manager.

Plant security managers have previously been forwarded a copy of NUREG/CR-5172.

This document is oriented primarily toward fuel cycle facilities and incorporates guidance from a similar U.S. Department of Energy (DOE) program; however, it contains useful information for nuclear power plants.

This manual addresses skills that armed response personnel could employ to ensure personal safety and effective response to adversary actions and provides guidance in the general factors that could be considered.

The manual is, however, for reference purposes only and its contents should not be construed as acceptance criteria or as regulatory requirements.

The OSRE lessons learned provide the weaknesses and strengths identified during OSREs pertaining to licensees'apability to cope with an adversary with the characteristics specified in NRC's design-basis threat.

It is suggested that the information be reviewed for applicability to your plant and actions be considered, as appropriate.

However, the solutions and approaches O'C43 9510020212 950926 PDR ADQCK 05000244 F.

.PDR ImC RE Ct-:HH IlaPV

R. Hecredy September 26, 1995 contained, in these OSRE lessons learned do not constitute NRC requirements, and it 'should, not be -inferred that, these are the only acceptable solutions for a plant.

i(

No specific action or,'written response to this letter is required.

Sincerely, I

k Original signed by:

Allen R. Johnson, Project Manager Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-244 cc:

See next page DISTR IBUTION:

, Docket File

'UBLIC PDI-1 Reading LHarsh AJohnson SLittle DCrutchfield/BGrimes LCunningham DOrrik HWarren EKoup 0-9-G-22 DOCUMENT NAME:

G:

GINNA SECURITY.LTR OFFICE NAME DATE LA:PDI-1 SLittl

smm 09 44 95 PH:PDI-1 AJohnson 09 95 PD'DI-1 LHarsh 09 g.C 95

vl I

I)vg ~

vjlv 1

I Ji

\\

I I

I I Ih I

j t

II r

'1 a

I(

jv II i;

I'J II I

1

R. Hecredy contained in these OSRE lessons learned do not constitute NRC requirements, and it should not be inferred that these are the only acceptable solutions for a plant.

No specific action or written response to this letter is required.

Sincerely, Docket No. 50-244 cc:

See next page A len R. Johnso

, Project Hanager P

'ect Direc rate I-I Divs eactor Projects - I/II Office of Nuclear Reactor Regulation

Dr. Robert C. Mecredy R.E. Ginna Nuclear Power Plant CC:

Thomas A. Hoslak, Senior Resident Inspector R.E. Ginna Plant U.S. Nuclear Regulatory Commission 1503 Lake Road

Ontario, NY 14519 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Hr. F. Williams Valentino, President New York State
Energy, Research, and Development Authority 2 Rockefeller Plaza
Albany, NY 12223-1253 Charlie Donaldson, Esq.

Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Nicholas S.

Reynolds Winston

& Strawn 1400 L St.

N.W.

Washington, DC 20005-3502 Ms. Thelma Wideman

Director, Wayne County Emergency Management Office Wayne County Emergency Operations Center 7336 Route 31
Lyons, NY 14489 Hs. Mary Louise Meisenzahl Administr ator, Monroe County Office of Emergency Preparedness 111 West Fall Road, Room ll Rochester, NY 14620 Hr. Ronald C. Teed Security Manager Rochester Gas and Electric Corporation 1503 Lake Road
Ontario, NY 14519