Forwards ISI Rept for Third Interval (1990 - 1999) Second Period,Third Outage (1995) at Re Ginna Nuclear Power Plant
ML17264A121
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/02/1995
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17264A122 List:
References
NUDOCS 9508080401
Download: ML17264A121 (5)


Text

PRZQRXTY (ACCELERATED RIDE PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9508080401 DOC.DATE: 95/08/02 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 p

AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.

SUBJECT:

Forwards "ISI Rept for Third Interval (1990 1999)

Second Period, Third Outage (1995) at RE Ginna Nuclear Power Plant."

DISTRIBUTION CODE:

A047D COPIES RECEIVED:LTR g ENCL g SIZE:

'k P~

TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code GL-89-04 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 RECIPIENT ID CODE/NAME PDl-1 LA JOHNSON,A INTERNAL: AEOD/SPD/RAB NRR/DE/EMCB NUDOCS-ABSTRACT RES/DSIR/EIB EXTERNAL: LITCO ANDERSON NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD1-1 PD CENTER

~ME OGC/HDS3 LITCO RANSOME i C NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

0 1

1 1

1 D

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL

DESK, ROOM OWFN 5D8 (415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDt TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL 13

ANn ROCHESTER GASANDElECTRIC CORPORATION

~ 89 FASTAYENUE, ROCHESTER, N. Y 146494001 AREA CODE716 Sd6-2700 ROBERT C. MECREDY Vice President Nvctear Operations August 2, 1995 U.S. Nuclear Regulatory Commission Document Control Desk Attn:

Allen R. Johnson PWR Project Directorate I-1 Washington, D.C.

20555

Subject:

Transmittal ofInservice Inspection Report for the Third Interval (1990 - 1999),

Second Period, Third Outage (1995)

R.E. Ginna Nuclear Power Plant Docket no. 50-244

Dear Mr. Johnson:

Enclosed is a copy ofthe 1995 Ginna Station Inservice Inspection Report, required 90 days following startup from the refueling outage.

This report is submitted as specified by ASME Code Section XI, 1986 Edition and RGBs Nuclear Directives. The enclosed report has been reviewed by the ANII.

Each copy ofthe report contains a summary ofwork accomplished, as well as three attachments: Attachment 1, ISI Program Examination Summary; Attachment 2, Repair, Replacement 2 Modification Program Summary; and Attachment 3, Erosion/Corrosion (Minwall)

Program Summary.

Very Truly Yours Robert C. Mecredy 950808040 i " 'st50802 PDR 'DOCK 05000244 PDR

~

+S L

c'

GAH/Irc Enclosures xc:

U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King ofPrussia, PA 19406 U.S. Nuclear Regulatory Commission Attn: Allen R. Johnson (Mail Stop 14B2)

PWR Project Directorate I-1 Washington, D.C.

20555 US NRC Ginna Senior Resident Inspector