Text
PRIDRIT'Y Z
REGULATOR/ i&FR~RQREIBHRQ5TION SYSTEM (RIDS )
"'i ACCESSION NBR:9505090184
DOC ~ DATE- 95/05/Ol
NOTARIZED:
NO
,
DOCKET
N
ACIL:50-244 Robert
Emmet Ginna Nuclear Plant, Unit 1, Rochester
G
05000244
RUTH.NAME
AUTHOR AFFILIATION
RTIN,T.T.
Region
1 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
MECREDY,R.C.
Rochester
Gas
a Electric Corp.
SUBJECT:
Forwards
SALP rept 50-244/93-99
on 930912-950311.Mgt
meeting
scheduled
for public observation
on 950509.
DISTRIBUTION CODE:
IE40D
COPIES
RECEIVED:LTR g ENCL J
SIZE: 4 +
TITLE: Systematic
Assessment
of Licensee
Performance
(SALP) Report
P
NOTES:License
Exp date in accordance
with 10CFR2,2.109(9/19/72).
05000244
0
RECIPIENT
ID CODE/NAME
PDl-1 LA
JOHNSON,A
INTERNAL: COMMIS
CENTER
NRR/DRCH/HHFB
NUDOCS-ABSTRACT
OGC/HDS3
RGN1
FILE
01
EXTERNAL: L ST LOBBY WARD
NOAC
COPIES
LTTR ENCL
1
1
1
1
5
5
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
PD1-1
DEDRO
NRR/DISP/PIPB
NRR/DOTS
NRR/DRCH/HOLB
OE DIR
RES/HFB
LITCO BRYCE,J
H
NRC PDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
C
N
VOTE TO ALI."RIDS" RECIPIENT'TS:
PLEASE HELP US TO REDUCE iVASTE!COi'TAC:TTIHEDOCLiIEiTCONTROL
DESk. ROOM Pl.37 (EX1: 5(H. 033 ) TO ELINIIFATE 5'Ol:R iAiIEI'ROTI
DIS'I'Rilll
"I'ION LIS'I'S I'OR DOCI.'RIEN I'S YOL')Oi"I'
L'ED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
24
ENCL
24
Nay 1,
1995
Dr. Robert
C. Necredy
Vice President,
Ginna Nuclear Production
Rochester
Gas
and Electric Corporation
89 East
Avenue
Rochester,
14649
SUBJECT:
SYSTENATIC ASSESSNENT
OF LICENSEE
PERFORNANCE
(SALP)
REPORT
NO.
50-244/93-99
Dear Dr. Necredy:
This letter forwards the
R.
E. Ginna,
SALP report for the period September
12,
1993 to Narch ll, 1995.
This SALP was conducted
under the revised
process that was implemented
by the Nuclear Regulatory Commission
(NRC) on
July 19,
1993.
The revised
SALP process
rates
licensees
in four functional
areas:
Operations,
Naintenance,
Engineering,
and Plant Support.
The Plant
Support area includes:
Radiological Controls, Security,
Emergency
Preparedness,
Fire Protection,
Chemistry,
and Housekeeping
Controls.
Overall, the
NRC continued to see very good safety performance
at Ginna.
Nanagement
demonstrated
a proper safety perspective
and exhibited
improved
oversight
and involvement in plant activities.
The
RG&E safety review
committees strongly contributed to the conservative
operating philosophy
and
scope of corrective actions.
We found your self-assessment
activities to be
proactive, especially your recent efforts to review the operational
performance of the service water system:
With the exception of some lapses
in
the maintenance
area,
we found your reviews
and root cause
determinations
for
plant problems to be thorough
and comprehensive.
The numerous
examples of
maintenance
related
equipment installation or reassembly
problems, especially
during outage periods,
warrant
a broad review to identify root causes
and to
devise measures
for earlier identification of possible
adverse
performance
trends.
We noted improved performance in operations
and this area
was rated Category
1.
Operations
personnel
continued their strong performance
in operating the
plant and responding to events while improvement
was observed
in management
oversight,
licensed operator requalification training effectiveness,
and
configuration control.
Another strength of operations
was the questioning
attitude in tracking
and monitoring plant parameters
that allowed early
identification of plant problems,
such
as
steam leaks in containment
and the
clogging of a containment
pressure
sensing line.
Naintenance
was rated category 2.
The plant was generally well maintained
and
long-term equipment
upgrades
continued.
Naintenance
procedures
were very good
following completion of a five year procedure
upgrade
program.
Although most
maintenance activities were performed well, significant exceptions
occurred
during equipment installation or reassembly.
These
problems indicated
weakness
in the efforts of the Naintenance
Department to prevent
and correct
deficient conditions, especially during outages.
Root cause
determinations
associated
with maintenance
problems varied in quality.
9505090i84 95050i
ADQCK 05000244
8
Dr. Robert
C. Hecredy
Engineering
performance
was rated Category l.
Engineering
Department
management
provided strong oversight in controlling configuration changes
as
evidenced
by the excellent planning
and installation of plant modifications.
The engineering
organization
demonstrated
a strong safety perspective
in
support of plant operations,
including resolution of past technical
problems.
Communications
between the corporate
and site engineering staffs were
excellent.
The Engineering
Department
demonstrated
an excellent root cause
and corrective action program.
Corporate engineering
provided outstanding
support in planning for the steam generator
replacement
program,
conversion to
standard
technical specifications,
and
new fuel reload in 1996.
Plant Support
was rated Category 2.
The plant support functions effectively
contributed to safe plant operations.
Performance
in the radiation protection
area
was good.
Steady
improvements
have
been
made in the
ALARA program
performance,
but areas for growth still exist in meeting exposure
reduction
challenges.
Very good performance
was noted in the radiological effluent and
environmental
monitoring programs.
There
was continued
good performance in
the emergency
preparedness
area,
however several
attention to detail
problems
were identified.
Security program performance
continued to be
a strength,
however
a significant vulnerability was identified in implementation of the
fitness-for-duty program.
The fire protection
and housekeeping
programs
were
effectively implemented.
Enclosure
2 provides the schedule
and basis for NRC inspections of your
facility planned for the next year.
We will inform you of any changes
required to the attached
inspection schedule.
The routine resident
inspection
effort is not included in this schedule.
We have scheduled
a management
meeting with you,
open for public observation,
at ll:00 am on Hay 9,
1995 at the Ginna Training Center.
At the meeting,
you
should
be prepared to discuss
our assessment
and any initiatives you plan to
take to address
the weaknesses
detailed in our evaluation.
We appreciate
your cooperation.
Sincerely,
Docket No. 50-244
Original Signed
By:
Thomas
T. Hartin
Regional Administrator
Enclosure:
1.
Systematic
Assessment
of Licensee
Performance
(SALP) Report
No.
50-244/93-99
2.
Planned
NRC Inspections,
April 17,
1995 to Hay 1,
1996
Dr. Robert
C. Necredy
~
~
cc w/encls:
R. Smith, Senior Vice President,
Customer
Operations
Central
Records
(7 copies)
Director, Energy
and Water Division
State of New York, Department of Law
N. Reynolds,
Esquire
Nuclear Safety Information Center
(NSIC)
D. Screnci,
PAO (17 copies)
The Chairman
Commissioner
Rogers
Commissioner
de Planque
Institute for Nuclear
Power Operations
(INPO)
NRC Resident
Inspector
State of New York,
SLO Designee
Dr. Robert
C. Mecredy
Distribution w/encl:
Region I Docket
Room (with concurrences)
PUBLIC
J. Taylor,
J. Milhoan,
DEDO
SALP Program Manager,
NRR/ILPB (2 copies)
T. Martin,
M. Lazarus,
S. Stewart,
M. Oprendek,
Distribution w/encl
(VIA E-MAIL):
M. Russell,
R.
Zimmerman,
J.
Lieberman,
OE (OEMAIL)
D. Gamberoni,
A. Thadani,
A. Johnson,
PM,
M. Dean,
OEDO
T. Marsh,
Inspection
Program
Branch,
NRR (IPAS)
M. Campion,
ORA
Distribution via E-Mail:
Region I Staff (Refer to SALP Drive)
DOCUMENT NAME:
A:SALP9399.MEO
To receive a copy of this document, indicate in tho born
C
rl Copy without attachment/enclosure
E
Is Copy with attachment/enclosure
N
~ No copy
OFFICE
'AME
DATE
RI:DRP
Lazarus/meo*
4/12/95
RI:DRP
Linvil e*
RI:DRP
Coo
e
,!/
RI:DR
Hehl
OFFICE
NANE
DATE
RI:DRS
Blo
h
a Hg:NRR
RI:D
Marshal@
6
Kan
e4
(e.~~. ')
RI:RA
Martin
OFFICIAL RECORD
COPY
- SEE PREVIOUS
CONCURRENCE