U,NITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 205554001 April 21, 1995 oa/ v Dr. Robert C. Mecredy Vice President, Nuclear Operations Rochester Gas and Electric Corporation 89 East Avenue Rochester, NY 14649
SUBJECT:
R.
E.
GINNA NUCLEAR POWER PLANT RESPONSE TO NRC BULLETIN 93-02, "DEBRIS PLUGGING OF EMERGENCY CORE COOLING SUCTION STRAINERS" (TAC NO. M86565)
Dear Dr. Mecredy:
This letter acknowledges receipt of your response dated June 10, 1993, to NRC Bulletin 93-02 (Bulletin).
The Bulletin was issued May 11, 1993, to all nuclear power reactor licensees.
It requested licensees to identify fibrous material in the primary containment, take any necessary compensatory
- measures, and remove any such material.
Your response stated that no fibrous filter
- material, such as described.in the Bulletin, was identified as being used or stored in your containment.
Based on that, we consider your actions to be complete.
Please retain any records of your actions in response to this Bulletin, as subsequent inspection activities may be conducted in regards to this issue.
Should you have any questions, please contact me at (301) 415-1497 or the Lead Project Manager for this issue, David M. Lynch at (301) 415-3023.
Sincer ely, Docket No. 50-244 cc:
See next page Alle R. John on, Project Manager Proje t Dir torate I-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation 256007 9504260183 950421 PDR ADQCK 05000244 I
P PDR HRC tII.E II:~IVIIIICII Y~i
Dr. Robert C. Mecredy R.E. Ginna Nuclear Power Plant CC:
Thomas A. Hoslak, Senior Resident Inspector R.E.
Ginna Plant U.S. Nuclear Regulatory Commission 1503 Lake Road
'ntario, NY 14519 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Hs.
Donna Ross New York State
- Energy, Research, and Development Authority 2 Empire State Plaza Suite 1901
- Albany, NY 12223-1253 Charlie Donaldson, Esq.
Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Nicholas S.
Reynolds Winston 5 Strawn 1400 L 'St.
N.W.
Washington, DC 20005-3502 Hs. Thelma Wideman
- Director, Wayne County Emergency Management Office Wayne County Emergency Operations Center 7336 Route 31
- Lyons, NY 14489 Hs. Mary Louise Meisenzahl Administrator, Monroe County Office of Emergency Preparedness ill West Fall Road, Room 11 Rochester, NY 14620 Robert Hargrove Environmental Review Coordinator 26 Federal Plaza New York, NY 10278
N 0
April 21, 1995 Dr. Robert C. Mecredy Vice President,Nuclear Operations Rochester Gas and Electric Corporation 89 East Avenue Rochester, NY 14649
SUBJECT:
R.
E.
GINNA NUCLEAR POWER PLANT RESPONSE TO NRC BULLETIN 93-02, "DEBRIS PLUGGING OF EMERGENCY CORE COOLING SUCTION STRAINERS" (TAC NO. H86565)
Dear Dr. Mecredy:
This letter acknowledges receipt of your response dated June 10, 1993, to NRC Bulletin 93-02 (Bulletin).
The Bulletin was issued May ll, 1993, to all nuclear power reactor licensees.
It requested licensees to identify fibrous material in the primary containment, take any necessary compensatory
- measures, and remove any such material.
Your response stated that no fibrous filter
- material, such as described in the Bulletin, was identified as being used or stored in your containment.
Based on that, we consider your actions to be complete.
Please retain any records of your actions in response to this Bulletin, as subsequent inspection activities may be conducted in regards to this issue.
Should you have any questions, please contact me at (301) 415-1497 or the Lead Project Manager for this issue, David H. Lynch at (301) 415-3023.
Sincerely, Original signed by:
Docket No. 50-244 cc:
See next page Distribution:
Docket File PUBLIC PDI-1 Reading SVarga JZwolinski LHarsh SLittle AJohnson RCapra DLynch Allen R. Johnson, Project Manager Project Directorate I-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation RBarrett RElliott OGC ACRS (4)
JLinville, RGN-I DOCUMENT NAME:
G: iGINNAiG186565. LTR To receive a copy of this document. indicate in the box: "C" ~ Copy without enclosures "E
~ Copy with enciosures "N" ~ No copy OFFICE LA:PDI-1 C
PH'PDI-1 Q.
D'PDI-1 NAME SLittl DATE 04/
95 AJohnson:smm 04/ 0/95 LHarsh 04/Q/95 OFFICIAL RECORD COPY 04/