PR.IC3R.IMY 1 (ACCELERATED RIDS PROCESSING)
REGULATORY INFORMATION DXSTRIBUTION SYSTEM (RIDS)
ACCESSXON NBR:9503160170 DOC.DATE: 95/03/10 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
05000244 AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.
Rochester Gas
& Electric Corp.
RECIP.NAME RECIPIENT AFFXLXATION JOHNSON,A.R.
Project Directorate I-3 (PD1-3)
(Post 941001)
P
SUBJECT:
Informs that util will defer implementation of Rev 21 to QA program for station operation for addi 60 days from 950310 I
to enable completion of NRC review.
DISTRIBUTION CODE:
Q004D COPIES RECEIVED:LTR 3 ENCL 0 SIZE:
0 TITLE: QA Topical Report,
- Change, Amendment, or Correspondence (Doc et/Utili NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244 RECIPIENT ID CODE/NAME JOHNSON,A INTERNAL: DRS/RGN1 DRS/RGN3
~FXLE CEHTER~Ol NRR/DOTS/TQMB RGN1 FILE EXTERNAL: DMB/OSS NRC PDR COPIES LTTR ENCL 1
1 2
1 1
1 1
RECIPIENT XD CODE/NAME DRS/RGN2 DRS/RGN4 NRR/DISP/IMS OC/LFDCB IHS COPIES LTTR ENCL 1
1 1
t 1 D
U N
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE! CONTACTTHE DOCUMENTCONTROL DESK. ROOM P!-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAMEFROM DISTRIBUTIONLISTS FOR DOCUMENTS YOU DON"I'EED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL
- ht
1
Q AND ROCHESlER GASANDELECTRIC CORPORATION + 89 EASTAVENUE, ROCHESTER, N.Y. Id6rI9-0001 AREA CODE716 5'-27M ROBERT C. MECREDY Vice President Nvctear Operations March 10, 1995 U.S. Nuclear Regulatory Commission Document Control Desk Attn:
Allen R. Johnson Project Directorate I-3 Washington, D.C.
20555
Subject:
Status of Quality Assurance Program for Station Operation (Rev.
21)
R.E.
Ginna Nuclear Power Plant Docket No. 50-244 Ref.
(a): Telephone Conversation between R.
Watts (RG&E) and M.
Modes (USNRC)
February 21, 1995
Dear Mr. Johnson:
On December 21,
- 1994, RG&E submitted proposed Revision 21 to the Quality Assurance Program for Station Operation in accordance with 10 CFR 50.54(a)(3).
On February 21,
- 1995, Richard Watts of our staff contacted Michael Modes (Materials
- Section, Region
- 1) to request the status of NRC's review of our submittal, because RG&E had received no response up to that. date.
Mr. Modes indicated that the review status could not be determined due to the illness and unavailability of the principal staff reviewer.
Although 60 days had elapsed since the submittal date, thus resulting in approval per 10 CFR 50.54(a),
Mr.
Watts suggested that RG&E delay implementation of Revision 21 pending the completion of NRC's review.
Accordingly, we will defer implementation of the subject Revision 21 for an additional 60 days from today's date to enable completion of NRC staff's review.
Please do not hesitate to contact us if we can clarify any aspects of our QA submittal.
Very truly yours, GAH/372 Robert C. Mecredy I
'st503160170 950310 r
PDR ADOCK 05000244
, P PDR
A h
u
xc:
Mr'. Allen R. Johnson (Mail Stop 14D1)
Project Directorate I-3 Washington, D.C.
20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Attn:
Michael Modes, Materials Section Division of Reactor Safety Ginna Senior Resident Inspector
C l
1>
!I I.
tPRIQRITY 1
(ACCELERATED R1DS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9503160170 DOC.DATE: 95/03/10 NOTARIZED: NO DOCKET g FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
05000244 AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.
Rochester Gas
& Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.
Project Directorate I-3 (PD1-3)
(Post 941001)
P
SUBJECT:
Informs that util will defer implementation of Rev 21 to QA program for station operation for addi 60 days from 950310 I
to enable completion of NRC review.
DISTRIBUTION CODE:
Q004D COPIES RECEIVED: LTR J ENCL 0 SIZE:
0 TITLE: QA Topical Report,
- Change, Amendment, or Correspondence Doc et Utili NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244 R
RECIPIENT ID CODE/NAME JOHNSON,A INTERNAL: DRS/RGN1 DRS/RGN3
~F.ILE CENTER 01 NRR/DOTS/TQMB RGN1 FILE EXTERNAL: DMB/OSS NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME DRS/RGN2 DRS/RGN4 NRR/DISP/IMS OC/LFDCB IHS COPIES LTTR ENCL U
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE O'ASTE! CONTACTTHE DOCUMENTCOb'TROL DESK, ROOM P! -37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAMEFROM DISTRIBUTIONLISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL F
AND ROCHES,. ER GAS ANDElECTRIC CORPORATION/
~ 89 EASTAVENUE, ROCHESTER, M Y. Id6d9 000I AREA CODE 716 5'.2700 ROBERT C. MECREDY Vice Presiden<
hlvcfeor Opere>ions March 10, 1995 U.S. Nuclear Regulatory Commission Document Control Desk Attn:
Allen R. Johnson Project Directorate I-3 Washington, D.C.
20555
Subject:
Status of Quality Assurance Program for Station Operation (Rev.
21)
R.E.
Ginna Nuclear Power Plant.
Docket No. 50-244 Ref.
(a): Telephone Conversation between R.
Watts (RG&E) and M.
Modes (USNRC)
February 21, 1995
Dear Mr. Johnson:
On December 21,
- 1994, RG&E submitted proposed Revision 21 to the Quality Assurance Program for Station Operation in accordance with 10 CFR 50.54(a)(3).
On February 21,
- 1995, Richard Watts of our staff contacted Michael Modes (Materials
- Section, Region
- 1) to request the status of NRC's review of our submittal, because RG&E had received no response up to that date.
Mr. Modes indicated that the review status could not be determined due to the illness and unavailability of the principal staff reviewer.
Although 60 days had elapsed since the submittal date, thus resulting in approval per 10 CFR 50.54(a),
Mr.
Watts suggested that RG&E delay implementation of Revision 21 pending the completion of NRC/s review.
Accordingly, we will defer implementation of the subject Revision 21 for an additional 60 days from today's date to enable completion of NRC staff's review.
Please do not hesitate to contact us if we can clarify any aspects of our QA submittal.
Very truly yours, Robert C. Mecredy GAH/372 9503160170 950310 PDR ADOCK 05000244 P
Mr'. Allen R. Johnson (Mail Stop 14D1)
Project Directorate I-3 Washington, D.C.
20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King 'of Prussia, PA 19406 Attn:
Michael Modes, Materials Section Division of Reactor Safety Ginna Senior Resident Inspector