Text
I RIC)RITY 1
(ACCELERATED RIDS PROCESSli REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
05000244 AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V.
Rochester Gas
& Electric Corp.
WIDAY,J.A.
Rochester Gas
& Electric Corp.
RECIP.NAME RECIPIENT AFFILXATXON P
SUBJECT:
Monthly operat' for Feb 1995 for RE Ginna Nuclear Power Plant.
950307 tr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED: LTR L ENCL
/
SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
0 05000244 R
RECIPIENT ID CODE/NAME PD1-3 PD INTERNAL: AEOD/SPD/RRAB NRR/DXSP/PI PB RGN1 COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1
1
- JOHNSON, 1
1
~E CEITE~ 1 1
1 NRR/DOPS/OECB 1
1 COPIES LTTR ENCL 1
1 1
1 1
1 EXTERNAL: LITCO BRYCE,J H
NRC PDR 1
1 1
1 NOAC 1
1 D
U NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE KVASTE!CONTACTTHE DOCUMENTCONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELlih!IVATEYOUR.'JAME FROW!
DISTRIBUTION LISTS I'OR DOCUMENTS YOU DON"I'L'ED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
~
~ ~
I/
Z//ZZZZZ
/l/Z/Zl/Zi
~ 4 I 0%II%
Z/Zl Z/
//Z//Z/ZZ ZZ'::::
ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649.0001 TELEPHONE AREA CODE old 546-2700 GINNA STATION March 7, 1995 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Dear Sir:
Monthly Report for February, 1995 Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No. 50-244 Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of February, 1995.
Very truly yours, Q.
LJ s
h A. Wida Plant Manager JAW:tjn Attachments c:
Mr. Thomas T. Martin NRC (1)
~40)'0 ~-
9503i40226 950228 PDR ADOCK.05000244 R
50-244 March 7 1995 V
John V. Walden TELEPHONE (315)5244446 Ext.673 COMPLETED BY OPERATING DATAREPO%
Notes
- 1. Unit Name:
R.E. GINNANUCLEAR POWER PLANT
- 2. Reporting Period:
Februa 1995 3.
Licensed Thermal Power (MWt):
1520 4.
Nameplate Rating (Gross MWe):
490 5.
Design Electric Rating (Net MWe):
470 6.
Maximum Dependable Capacity (Gross MWe):
490 7.
Maximum Dependable Ca pacity (Net MWe):
470 8.
IfChanges Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9.
Power Level to Which Restricted, IfAny (Net MWe:
- 10. Reason For Restrictions, IfAn:
This Month Yr.-to-Date Cumulative
- 11. Hours in Reported Period
- 12. Number of hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor (%)
- 20. Unit AvailabilityFactor (%)
- 21. Unit Capacity Factor (using MDC Net) (%)
- 22. Unit Capacity Factor (using DER Net) (%)
- 23. Unit Forced Outage Rate (%)
672.0 672.0 0.0 672.0 0.0 1000530.0 338388.0 321771.0 100.0 100.0 101.9 101.9 0.0 1416.0 1416.0 0.0 1416.0 0.0 2096422.0 708460.0 673576.0 100.0 100.0 101.2 101.2 0.0 221424.0 177231.8 1687.6
'74388.3 8.5
'47611659.0 81942512.0 77782806.0 78.8 78.8 75.8 75.8 5.7
- 24. Shutdowns Scheduled Over Next 6 Months(Type, Dateand Duration of Each):
Refuelin and Maintenance Start 3/26/95 Duration 36 da
- 25. IfShutdown At End of Report Period, Estimate Date ofStartup:
- 26. Units ln Test Status (Prior to Commercial Operation):
Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
'UMULATIVETOTALCOMMENCINGJANUARY1, 1975 CUMULATIVETOTALCOMMENCING NOVEMBER8, 1969
, ~
A AVERAGE DAILY UNIT POWER L19TEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: March 7
1995 COMPLETED BY John Walden TELEPHONE:
315 524-4446 Ext.
588 MONTH Februar 1995 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 ~
484 17.
483 2 ~
483 18
~
484 3 ~
483 19'84 4 ~
484 20.
484 5.
484 21.
483 6.
484 22.
484 7 ~
484 23'83 8.
484 24.
483 9.
484 25.
483 10.
433 26.
484 412 27.
484 12'82 28.
483 13.
482 29.
14.
482 30.
15.
483 31.
16.
483 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.
Compute to the nearest whole megawatt.
DOCKET NO.
~0 244 UNITNAMER.E. GINMA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS
( OhfP L ET ED f3Y ohn V. Walden Ho.
Date 0
I-0 0
0
> x 0 ~
e4 00 00 0l e e-0 c 0 0
0 0Pn r 0
CI Licensee Event Report e
Em 0
0 0
I/l (J C0 Lrl c
00 CJ Cause L Corrective Action to Prevent Recurrence 5-02 2/10/95 16.1 A
Condenser Tube leaks caused a
deviation in Steam Generator Secondary Chemistry.
Power was reduced to 46% to allow condenser tube plugging.
F: Forced S:
Scheduled REV. 4454949 Reason:
A-Etluipment Failure (Explain)
B-hfaintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8c License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) hfethod:
1-hfanual 2-hfanual Scram.
3-Automatic Scram.
4-Other (Explain)
Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Rcport (LER) File (NUREG-oi6i)
Exhibit 1 - Same Source
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E.
Ginna Nuclear Power Plant DATE: Mare 7
995 COMPLETED BY:
John Walden TELEPHONE:
315 4-4446 Ext.
588 MONTH Februar 1995 During the month of February the average power was 98%.
Power was reduced to 46%
on February 10 to allow condenser water box isolation and tube plugging.
The unit was restored to full power on February 11.