Monthly Operating Rept for Feb 1995 for Re Ginna Nuclear Power Plant.W/950307 Ltr
ML17263A968
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/28/1995
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9503140226
Download: ML17263A968 (6)


Text

I RIC)RITY (ACCELERATED RIDS PROCESSli 1

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION WALDEN,J.V. Rochester Gas & Electric Corp. P WIDAY,J.A. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILXATXON

SUBJECT:

Monthly operat' for Feb 1995 for RE Ginna Nuclear Power Plant. 950307 tr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED: LTR TITLE: Monthly Operating Report (per Tech Specs) L ENCL / SIZE: 0 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 R RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 PD 1 1 JOHNSON, 1 1 INTERNAL: AEOD/SPD/RRAB NRR/DXS P/PI PB 1

1 1

1

~E CEITE~

NRR/DOPS/OECB 1 1 1

1 1

RGN1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

U NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE KVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELlih!IVATE YOUR.'JAME FROW!

DISTRIBUTION LISTS I'OR DOCUMENTS YOU DON"I'L'ED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

~ ~~

I/ Z//ZZZZZ /l/Z/Zl/Zi ~4 I 0%II%

Z/Zl Z/ //Z//Z/ZZ ZZ'::::

ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649.0001 TELEPHONE AREA CODE old 546-2700 GINNA STATION March 7, 1995 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for February, 1995 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of February, 1995.

Very truly yours, Q. LJ s h A. Wida Plant Manager JAW:tjn Attachments c: Mr. Thomas T. Martin NRC (1)

~40)'0 ~-

9503i40226 950228 PDR ADOCK.05000244" R PDR

OPERATING DATA REPO%

50-244 March 7 1995 COMPLETED BY V John V. Walden TELEPHONE (315)5244446 Ext.673

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes
2. Reporting Period: Februa 1995
3. Licensed Thermal Power (MWt): 1520
4. Nameplate Rating (Gross MWe): 490
5. Design Electric Rating (Net MWe): 470
6. Maximum Dependable Capacity (Gross MWe): 490
7. Maximum Dependable Ca pacity (Net MWe): 470
8. If Changes Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9. Power Level to Which Restricted, If Any (Net MWe:
10. Reason For Restrictions, If An:

This Month Yr.-to-Date Cumulative

11. Hours in Reported Period 672.0 1416.0 221424.0
12. Number of hours Reactor Was Critical 672.0 1416.0 177231.8
13. Reactor Reserve Shutdown Hours 0.0 0.0 1687.6
14. Hours Generator On-line 672.0 1416.0 '74388.3
15. Unit Reserve Shutdown Hours 0.0 0.0 8.5
16. Gross Thermal Energy Generated (MWH) 1000530.0 2096422.0 '47611659.0
17. Gross Electrical Energy Generated (MWH) 338388.0 708460.0 81942512.0
18. Net Electrical Energy Generated (MWH) 321771.0 673576.0 77782806.0
19. Unit Service Factor (%) 100.0 100.0 78.8
20. Unit Availability Factor (%) 100.0 100.0 78.8
21. Unit Capacity Factor (using MDC Net) (%) 101.9 101.2 75.8
22. Unit Capacity Factor (using DER Net) (%) 101.9 101.2 75.8
23. Unit Forced Outage Rate (%) 0.0 0.0 5.7
24. Shutdowns Scheduled Over Next 6 Months(Type, Dateand Duration of Each):

Refuelin and Maintenance Start 3/26/95 Duration 36 da

25. If Shutdown At End of Report Period, Estimate Date of Startup:
26. Units ln Test Status (Prior to Commercial Operation): Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

'UMULATIVETOTAL COMMENCING JANUARY 1, 1975 CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

A ,~

AVERAGE DAILY UNIT POWER L19TEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: March 7 1995 COMPLETED BY John Walden TELEPHONE: 315 524-4446 Ext. 588 MONTH Februar 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1~ 484 17. 483 2

3 4

~

~

~

483 483 484 18 19 20.

'84

~ 484 484

5. 484 21. 483 6.

7 8.

~

484 484 484 22.

23 24.

'83 484 483

9. 484 25. 483
10. 433 26. 484 12 13.

'82 412 482 27.

28.

29.

484 483

14. 482 30.
15. 483 31.
16. 483 INSTRUCTIONS On this format, for each list the average daily unit power level in month. Compute to the nearest MWe-Net day in reporting whole megawatt.

DOCKET NO. ~0 244 UNITNAME R.E. GINMA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS

( Ohf P L ET ED f3Y ohn V. Walden 0l e4 ec 0 e- C 0 0 0 Licensee Em 0 Lrl Cause L Corrective 0 0 0 0 c Ho. Date 0 0 0 Event 0 0 Action to 0 0 0x 0

I- >

~ 0 0Pn r Report e I/l (J CJ Prevent Recurrence 0

CI 5-02 2/10/95 16.1 A Condenser Tube leaks caused a deviation in Steam Generator Secondary Chemistry. Power was reduced to 46% to allow condenser tube plugging.

F: Forced Reason: hfethod: Fxhibit G - Instructions S: Scheduled A-Etluipment Failure (Explain) 1-hfanual for Preparation of Data B-hfaintenance or Test 2-hfanual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Rcport (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) oi6i)

E-Operator Training 8c License Examination F-Administrative G-Operational Error (Explain)

REV. 4454949 H-Other (Explain) Exhibit 1 - Same Source

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: Mare 7 995 COMPLETED BY:

John Walden TELEPHONE: 315 4-4446 Ext. 588 MONTH Februar 1995 During the month of February the average power was 98%. Power was reduced to 46% on February 10 to allow condenser water box isolation and tube plugging. The unit was restored to full power on February 11.