OPERATING DATA REPORT 50-244 November 16, 1994 COMPLETED BY:
John V. Wsidon TELEPHONE (315)524-444B Ext.588 Notes On 9/10/94 the unit reduced power to 50% for 24 hrs in order to repair a condenser tubs leak
- 1. Unit Name:
R.E. GINNA NUCLEAR POWER PLANT
- 2. Reporting Period:
Se tomber, 1994 3.
Ucensed Thermal Power (MWt):
1520
,4.
Nameplate Rating (Gross MWo):
490 5.
Design Electric Rating (Not MWo):
470 B.
Maximum Dependablo Capacity (Gross MWo):
490 7.
Maximum Depondsblo Capacity (Not MWe):
470 8.
If Changes Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9.
Power Level to Which Restricted, If Any (Net MWe):
- 10. Reason For Restrictions, IfAn:
This Month Yr.-to-Date Cumulative '
11.
Hours in Reported Period 12.
Number of hours Reactor Was Critical 13.
Reactor Reserve Shutdown Hours 14.
Hours Generator On-line
- 15. Unit Reserve Shutdown Hours 1B. Gross Thermal Energy Generatod (MWH) 17.
Gross Electrical Energy Genorated (MWH) 18.
Net Electrical Energy Generated (MWH) 19.
Unit Service Factor (%)
20.
Unit Availability Factor (%)
- 21. Unit Capacity Factor (using MDC Not) (%)
- 22. Unit Capacity Factor (using DER Not) (%)
- 23. Unit Forced Outage Rate (%)
720.0 720.0 0.0 720.0 0.0 1060583.0 351720.0 334120.0 100.0 100.0 98.7 98.7 0.0 8551.0 5080.1 0.0 5010.9 0.0 7246875.0 2435374.0 2312587.0 76.5 7B.5 75.1 75.1 8.3 217799.0 17360B.S 1687.6 "
170763.3 85~
242202888.0 80118733.0 76047960.0 78.4 78.4 75.4 75.4 5.8
- 24. Shutdowns Schodulod Over Next 6 Months (Type, Date snd Duration of Each):
Refueling and Maintenance, Start 3/19/95, Duration 40 days
- 25. If Shutdown At End of Report Period, Estimate Date of Stsrtup:
26.
Units in Test Status (Prior to Commercial Operation):
Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION CUMULA'[IVETOTALCOMMENCING JANUARY 1, 1975
" CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969
, @II'2ac02a r41 116