OPERATING DATA REPORT 50-244 November 16, 1994 COMPLETED BY:

John V. Wsidon TELEPHONE (315)524-444B Ext.588 Notes On 9/10/94 the unit reduced power to 50% for 24 hrs in order to repair a condenser tubs leak

1. Unit Name:

R.E. GINNA NUCLEAR POWER PLANT

2. Reporting Period:

Se tomber, 1994 3.

Ucensed Thermal Power (MWt):

1520

,4.

Nameplate Rating (Gross MWo):

490 5.

Design Electric Rating (Not MWo):

470 B.

Maximum Dependablo Capacity (Gross MWo):

490 7.

Maximum Depondsblo Capacity (Not MWe):

470 8.

If Changes Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:

9.

Power Level to Which Restricted, If Any (Net MWe):

10. Reason For Restrictions, IfAn:

This Month Yr.-to-Date Cumulative '

11.

Hours in Reported Period 12.

Number of hours Reactor Was Critical 13.

Reactor Reserve Shutdown Hours 14.

Hours Generator On-line

15. Unit Reserve Shutdown Hours 1B. Gross Thermal Energy Generatod (MWH) 17.

Gross Electrical Energy Genorated (MWH) 18.

Net Electrical Energy Generated (MWH) 19.

Unit Service Factor (%)

20.

Unit Availability Factor (%)

21. Unit Capacity Factor (using MDC Not) (%)
22. Unit Capacity Factor (using DER Not) (%)
23. Unit Forced Outage Rate (%)

720.0 720.0 0.0 720.0 0.0 1060583.0 351720.0 334120.0 100.0 100.0 98.7 98.7 0.0 8551.0 5080.1 0.0 5010.9 0.0 7246875.0 2435374.0 2312587.0 76.5 7B.5 75.1 75.1 8.3 217799.0 17360B.S 1687.6 "

170763.3 85~

242202888.0 80118733.0 76047960.0 78.4 78.4 75.4 75.4 5.8

24. Shutdowns Schodulod Over Next 6 Months (Type, Date snd Duration of Each):

Refueling and Maintenance, Start 3/19/95, Duration 40 days

25. If Shutdown At End of Report Period, Estimate Date of Stsrtup:

26.

Units in Test Status (Prior to Commercial Operation):

Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION CUMULA'[IVETOTALCOMMENCING JANUARY 1, 1975

" CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

, @II'2ac02a r41 116

",. &DR 'DocK 05000204 PDR LI