OPERATING DATA REPORT 50-244 November 16, 1994 COMPLETED BY:

John V. Wsidon TELEPHONE (315)524-444B Ext.588

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes On 9/10/94 the unit reduced
2. Reporting Period: Se tomber, 1994 power to 50% for 24 hrs in order
3. Ucensed Thermal Power (MWt): 1520 to repair a condenser tubs leak

,4. Nameplate Rating (Gross MWo): 490

5. Design Electric Rating (Not MWo): 470 B. Maximum Dependablo Capacity (Gross MWo): 490
7. Maximum Depondsblo Capacity (Not MWe): 470
8. If Changes Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reason For Restrictions, If An:

This Month Yr.-to-Date Cumulative '

11. Hours in Reported Period 720.0 8551.0 217799.0
12. Number of hours Reactor Was Critical 720.0 5080.1 17360B.S
13. Reactor Reserve Shutdown Hours 0.0 0.0 1687.6 "
14. Hours Generator On-line 720.0 5010.9 170763.3
15. Unit Reserve Shutdown Hours 0.0 0.0 85~

1B. Gross Thermal Energy Generatod (MWH) 1060583.0 7246875.0 242202888.0

17. Gross Electrical Energy Genorated (MWH) 351720.0 2435374.0 80118733.0
18. Net Electrical Energy Generated (MWH) 334120.0 2312587.0 76047960.0
19. Unit Service Factor (%) 100.0 76.5 78.4
20. Unit Availability Factor (%) 100.0 7B.5 78.4
21. Unit Capacity Factor (using MDC Not) (%) 98.7 75.1 75.4
22. Unit Capacity Factor (using DER Not) (%) 98.7 75.1 75.4
23. Unit Forced Outage Rate (%) 0.0 8.3 5.8
24. Shutdowns Schodulod Over Next 6 Months (Type, Date snd Duration of Each):

Refueling and Maintenance, Start 3/19/95, Duration 40 days

25. If Shutdown At End of Report Period, Estimate Date of Stsrtup:
26. Units in Test Status (Prior to Commercial Operation): Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION CUMULA'[IVETOTAL COMMENCING JANUARY 1, 1975

" CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

@II'2ac02a 05000204 r41 116

",. &DR 'DocK PDR . LI