ML17263A849

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1994 for Re Ginna Nuclear Power Plant.W/941109 Ltr
ML17263A849
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/31/1994
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9411150477
Download: ML17263A849 (6)


Text

P R.IC!hR.IMY'CCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) i DOCKET I FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION WALDEN,J.V. Rochester Gas & Electric Corp.

WIDAY,J.A. Rochester Gas & Electric Corp. P RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operat Power Plant. 41109 ttr.for Oct 1994 for RE Ginna Nuclear DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Spec/s 0 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 R RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 PD 1 1 JOHNSON,A 1 1 INTERNAL: AEOD/SPD/RRAB ILE CENTER +0 1 1 NRR/DORS/OEAB NRR/PMAS/IRCB-E 1 1 RGN1 EXTERNAL LITCO BRYCE i J NOAC 'lghh 1 1 NRC PDR M

hh I'l fa D II 0

h h ('h ~ ~

1 U

ihl ht I l.

~ ~

IV

~

'I 1 I

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTEI CONTACT THE DOCL'CLIENT CONTROL DESK, ROOM PI -37 (E>'T. 504-2083 ) TO EL I XII.'PATE YOL'R NAhhI E PRO.'hl DISTRIBUTION LISTS I'OR DOCI.'MENTS YOU DON"I'EED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

Rrr

// /RKilf/ //E/S//I'it AL1< OWI ~ 8

/

t ZP ', 704 r izaak 4741E ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TELEPHONE AREA CODE 710 546.2700 GINNA STATION November 9, 1994 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for October, 1994 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of October, 1994.

Very truly yours, a.dX@

Plant Manager JAW:tjn Attachments c: Mr. Thomas T. Martin NRC (1) i 7.rannn f PDR R ...,

9411150477 941031 ADOCK 05000244 PDR

OPERATING DATA REPORT DOCKET N 50-244 November 9, 1994 COMPLETED BY John V. Walden TELEPHONE (315)524-4446 Ext.588

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes
2. Reporting Period: October, 1994
3. Ucensod Thermal Power (MWt): 1520
4. Nameplate Rating (Gross MWe): 490 S. Design Electric Rating (Net MWe): 470
6. Maximum Dependable Capacity (Gross MWo): 490
7. Maximum Dopondablo Capacity (Net MWe): 470
8. If Changes Occur in Capacity Rating (Items Numbor 3 Through 7) Since Last Report, Give Roason:
9. Power Lovel to Which Restricted, If Any (Net MWe):
10. Reason For Restrictions, If Any:

This Month Yr.-to. Date Cumulative"

11. Hours in Reported Period 745.0 7296.0 218544.0
12. Number of hours Reactor Was Critical 745.0 59B8.9 'I 74495.4
13. Reactor Reserve Shutdown Hours 0.0 0.0 1B87.6 i
14. Hours Generator On-line 745.0 5755.9 171508.3
15. Unit Reserve Shutdown Hours 0.0 0.0
18. Gross Thermal Energy Generated (MWH) 1115487.0 83623B2.0 243318375.0
17. Gross Electrical Energy Generated (MWH) 3738B2.0 2809238.0 80492595.0
18. Not Electrical Energy Generated (MWH) 355704.0 2668291.0 7B403684.0
19. Unit Sorvico Factor (%) 100.0 78.9 78.5
20. Unit Availability Factor (%) 100.0 78.9 78.5
21. Unit Capacity Factor (using MDC Net) (%) 101.B 77.8 75.5
22. Unit Capacity Factor (using DER Net) (%) 101.6 77.8 75.5
23. Unit Forcod Outage Rate (%) 0.0 7.3 5.8
24. Shutdowns Scheduled Over Next 6 Months (Type, Date snd Duration of Each):

Refuoling snd Maintenance, Start 3/26/95, Duration 38 days

25. If Shutdown At End of Report Period, Estimate Date of Startup:

2B. Units in Test Status (Prior to Commercial Operation): Force st Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

" CUMULATIVETOTAL COMMENCING JANUARY 1, 1975 CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: November 9 1994 COMPLETED BY:

John Walden TELEPHONE: 315 524-4446 Ext. 588 MONTH October 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 475 17. 479 475 18. 479

3. 19. 479
4. 475 20. 480
5. 476 21. 479
6. 476 22. 479:
7. 475 23. 479
8. 475 24. 478
9. 476 25. 479
10. 476 26. 478 476 27. 479
12. 476 28. 480
13. 477 29. 480 15.

16.

477 478 480 30.

31 '80 480 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month. Compute to the nearest whole megawatt.

DOCKET NO. 50 244 l/NITNAhIE. R E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS

'ATI'.

COhIPLETI'.D BY be~ ' '994 hn V. Walden REPORT hIONTH l'I'.LEPIIONE 3~5 524-4446 EM. 588 I

Ol >>0v Licensee C

o Lo Cause g Corrective 0 4 E Em C Ho. Date 0 I 4 0 0 0>>> cc o Event 0 4 0 Action to a 0 o Report II 0 E 0 Prevent Recurrence I O~ 0IA C EA Q O 0

O 2

Reason: hlethod: Exhibit G - Instructions F: Forced for Preparation of Data S: Scheduled A-Ecluipment Failure (Explain) I-hlanua I B-hlaintenance or Test 2-hlanual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0I6I)

E-Operator Training 8c License Examination F-Administrative G.Operational Error (Explain) 4949 H-Other (Explain) Exhibit I - Same Source Rtv. 4/SS

~ Fa h

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: November 1994 COMPLETED BY:

John Walden TELEPHONE: 315 524-4446 Ext. 588 MONTH October 1994 During the month of October the average power was 99%