ML17263A774
| ML17263A774 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 08/31/1994 |
| From: | Ploof R, Widay J ROCHESTER GAS & ELECTRIC CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9409200315 | |
| Download: ML17263A774 (6) | |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
AUTH.NAME AUTHOR AFFILIATION PLOOF,R.D.
Rochester Gas
& Electric Corp.
WIDAY',J.A.
Rochester Gas
& El'ectric Corp.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000244 P
SUBJECT:
Monthly ope t for Aug 1994 for RE Ginna Nuclear Power Plan
.W/940909 tr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE-TITLE: Monthly Operating Report (per Tech Specs 0
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244 R
RECIPIENT ID CODE/NAME PD1-3 PD INTERNAL: AEOD/SPD/RRAB NRR/DORS/OEAB RGN1 EXTERNAL: EG&G BRYCE,J.H NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME JOHNSON A E=CENEER=O NRR/PMAS/IRCB-E NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 D
C U
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE!CONTACTTI.IE DOCUMENTCONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELlikIIVATEYOUR NAME FROiil DISTRIBUTIONLISTS I'OR DOCUMENTS YOU DON"I'L'ED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
t urzzzpt
~rim
~>~'ziipjgjx!/ ur~rzz 9E/
ROCHESTERGASANDELECTRlCCORPORATION o 89EASTAVENUE ROCHESTER, N.Y. 1464Ml001 JOSEPH A. WIDAY Rant Manager Glnno Nucleor Plont TELEPHONE AREACODE 716 546-2700 GINNA STATION September 9,
1994 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Monthly Report for August, 1994.
Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of August, 1994.
Very truly yours, os h A. Wid lant Manager JAW:tjn Attachments c:
Mr. Thomas T. Martin NRC (1)
$ A(~p ag eeoe200va5 eeoaza PDR PDR ADOCK 05000244
~
. R=
OPERATING DATA REPORT DOCKET NO. 50-244 DATE:
September 9, 1994 COMPLETED BY:
Ronald D. Ploof TELEPHONE (315) 524-4446 Ext.673 OE GS S
1.
Unit N R.E. GINNA NUCLEAR POWER PLANT 2.
Reporting Period:
August, 1994 3.
Licensed Thermal Power (MWt):
1520 4.
Nameplate Rating (Gross MWe):
490 5.
Design Electric Rating (Net MWe):
470 6.
Maximum Dependable Capacity (Gross MWe):
490 7.
Maximum Dependable Capacity (Not MWe):
470 8.
If Changes Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9.
Power Level to Which Restricted, If Any (Net MWe):
- 10. Reason For Restrictions, If Any:
This Month Yr.-to-Date Cumulative"
'1.
Hours in Reported Period 12.
Number of hours Reactor Was Critical 13.
Reactor Reserve Shutdown Hours 14.
Hours Generator On-line
- 15. Unit Reserve Shutdown Hours 16.
Gross Thermal Energy Generated (MWH) 17.
Gross Electrical Energy Generated (MWH) 18.
Net Electrical Energy Generated (MWH) 19.
Unit Service Factor (%)
20.
Unit Availability Factor (%)
- 21. Unit Capacity Factor (using MDC Not) (%)
- 22. Unit Capacity Factor (using DER Not) (%)
- 23. Unit Forced Outago Rato (%)
744.0 445.0 0.0 439.0 0.0 615679 201020 190335 59.0 59.0 54.4 54.4 41.0 5831.0 4360.1 0.0 4290.9 0.0 6186292 2083654 1978467 73.6 73.6 72.2 72.2 9.5 217079.0 172886.6 1688.0 170042.9 8.5
'41142305 79767013 75713840 78.3 78.3 75.3 75.3 5.8
- 24. Shutdowns Scheduled Over Noxt 6 Months (Typo, Date and Duration of Each):
- 25. If Shutdown At End of Report Period, Estimate Date of Startup:
26.
Units in Test Status (Prior to Commercial Operation):
Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION 0 CUMULATIVETOTALCOMMENCING JANUARY 1, 1975 0 0 CUMULATIVETOTALCOMMENCING NOVEMBER 8, 1969
AVERAGE DAILY UNIT POWER LEVEL MONTH Au ust 1994 DOCKET NO: 50-244 UNIT: R.E.
Ginna Nuclear Power Plant DATE: Se tember 9
1994 COMPLETED BY:
Ronald Ploof TELEPHONE:
315 524-4446 Ext.
673 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 463 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17.
2.
461 18.
3.
460 460 19.
20.
-'8 5.
461 21.
6.
462 22.
46 7.
463 23.
176 8.
464 24.
435 9.
324 25.
466 10.
-17 26.
463
-10 27.
463
'2.
-10 28.
464 13.
29.
464 14.
30.
465 15.
31.
466 16.
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.
Compute to the nearest whole megawatt.
REPORT MONTH DOCKET NO.
~0 244 UNITNAMI:R.E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS COhIP LI'.1'I'.D BY Ron Ploof 1'I'.LI'.P IIONI'.
673 No.
Date 4
I C0 I
0 O ~
o4 C0404 CL h
~ ta8 0 c 00 e'en o
0O I.icensee Event Report ¹ Ew 4
0 Vl 0 EA C4 lA o00 O
E 0
V Cause L Corrective Action to Prevent Recurrence 94=08 8/9/94 305 94-009 BQ PDP Excessive stress on piping caused weld to fail-.
See LER 94-009 for corrective action.
F:
Forced S:
Scheduled Iltv. 4/8$ 4ses Reason:
A-Equipment Failure (Explain) 8-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
II-Other (Explain) 3 hlethod:
I-hlanua I 2-Manual Scram.
3-Automatic Scram.
4-Other (Explain)
Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Rcport (LER) I ilc (NI}RFG-01(il )
Exhibit I - Same Source
~ NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E.
Ginna Nuclear Power Plant DATE: Se tember 9
1994 COMPLETED BY:
Ronald Ploof TELEPHONE:
315 524-4446 Ext.
673 MONTH Au ust 1994 During the month of August the average power was 54'%n August 9 at 18: 58 the unit was taken off to repair a crack in the SI System piping.
The unit was placed back on line on August 22 at 11:59.