ML17263A719

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-244/94-12 on 940503-0606
ML17263A719
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/07/1994
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
Shared Package
ML17263A720 List:
References
NUDOCS 9407180006
Download: ML17263A719 (5)


See also: IR 05000244/1994012

Text

(NUDOCS OFFSITE FACILITY)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9407180006

DOC.DATE: 94/07/07

NOTARIZED: NO

FACIL:50-244 Robert

Emmet Ginna Nuclear Plant, Unit 1, Rochester

G

~

~

~

~

~

AUTH.NAME

AUTHOR AFFILIATION

INVILLE,J.C.

Region

1 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

MECREDY,R.C.

Rochester

Gas

& Electric Corp.

SUBJECT:

Forwards insp rept 50-244/94-12

on 940503-0606.

DISTRIBUTION CODE:

IEOlD

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

DOCKET

05000244'

NOTES:License

Exp date in accordance

with 10CFR2,2.109(9/19/72).

05000244 0

RECIPIENT

ID CODE/NAME

PDl-3

PD

INTERNAL: AEOD, DEIB

AEOD/DSP/TPAB

DEDRO

NRR/DRCH/HHFB

NUDOCS-ABSTRACT

OGC/HDS3

RES/HFB

TERNAL: EG&G/BRYCEgJ.H.

NSIC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

JOHNSON,A

AEOD/DSP/ROAB

AEOD/TTC

NRR/DORS/OEAB

NRR/PMAS/IRCB-E

OE DIR

EG FI

02

G

FILE

01

NRC PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

2.

D

0

U

N

NOTE TO ALL'RIDS",RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACTTHE DOCUMENTCONTROL

DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAME FROiI

DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

19

ENCL

19

Docket No. 50-244

Dr. Robert C. Mecredy

Vice President,

Ginna Nuclear Production

Rochester Gas and Electric Corporation

89 East Avenue

Rochester,

New York 14649

Dear Dr. Mecredy:

SUBJECT:

NRC INSPECTION 50-244/94-12

This letter transmits the May 3 to June 6, 1994 inspection findings of Messrs. T. Moslak and

E. Knutson at the R. E. Ginna Nuclear Power Plant. At the end of the inspection, the findings

were discussed with Mr. J. Widay and other members of your staff.

The inspection was focused on areas relevant to public health and safety and examined

the

control of operations,

maintenance,

engineering,

and plant support activities coriducted during

this period.

Within this scope,

a number of deficiencies

were identified that related

to

maintenance activities, particularly closure of work packages

and installation of flexible hoses.

While none of these deficiencies resulted in conditions that compromised public health and

safety, they did, in several instances, represent weaknesses

in performing maintenance.

In each

case, we noted that management

has aggressively pursued corrective action; your extensive use

of root cause analyses and human performance system evaluation reviews were noted strengths.

Some of the associated

corrective action evaluations were still in progress

at the close of this

inspection.

The "B" standby auxiliary feedwater pump room cooler was inoperable for 16 days due to

incomplete restoration from maintenance.

Failure to promptly identify this condition represented

a violation of regulatory requirements

as identified herein.

Th'e violation is not being cited

because

the criteria specified in Section VII.Bof the Enforcement Policy were satisfied, in that

the condition had minor safety significance, was self-identified, and was expeditiously corrected.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and

its enclosure willbe placed in the NRC Public Document Room.

~w I~ P'

V

9407180006

940707

PDR

ADOCK 05000244

6.

PDR

OFFiCJAL RECOROD

COPY

JUL -7 IBM

. Dr. Robert C. Mecredy

~

~

No response

to this letter is required.

Your cooperation with us in this matter is appreciated.

Sincerely,

grig:,-.,yl $ired

Sy'ames

C. Linville, Chief

Projects Branch No. 3

Division of Reactor Projects

Enclosure:

NRC Region I Inspection Report 50-244/94-12

cc w/encl:

=R. Smith, Senior Vice President, Production and Engineering

Central Records (5 copies)

Director, Energy and Water Division

State of New York, Department of Law

N. Reynolds, Esquire

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2 copies)

NRC Resident Inspector

State of New York, SLO Designee

O~CBQ. XU~ORD COPE

Dr. Robert C. Mecredy

bcc w/encl:

Region'I Docket Room (with concurrences)

W. Lazarus, DRP

D. Lew, DRP

M. Oprendek, DRP

bcc w/encl (VIAE-MAIL):

A. Johnson, PM, NRR

V. McCree, OEDO

W. Butler, NRR

M. Campion, ORA

M. Shannon, ILPB

DRP:RI

Knutson

7/5/94

DRP:RI

Moslak

Laza

s

OFFICIALRECORD COPY

A:GIN9412.MEO