Text
MAY 8 5 1994
Docket No. 50-244
Or. Robert C. Mecredy
Vice President,
Ginna Nuclear Production.
Rochester
Gas and Electric Corporation
89.East Avenue
Rochester, New York 14649
Dear Dr. Mecredy:
SUBJECT:
INSPECTION REPORT NO. 50-244/94-10
From April 11, 1994, to April22, 1994, the NRC observed startup operations at the
R. E. Ginna Nuclear Power Station.
This safety inspection, conducted by Mr. P. Bissett of
this office, focused on performance observations of ongoing activities during startup from
cold shutdown to full power operations.
Preliminary findings and general observations were
periodically discussed with Mr. J. Widay and other members of your staff.
Overall conclusions by the inspector, as a result of his observations,
were that operational
activities in all instances were well managed, controlled, and documented.
Licensed
operators,
maintenance,
test, quality control, training and management
personnel thoroughly
and effectively approached
each plateau of power ascension with caution and
conservativeness.
Also, daily routines performed by operations personnel were observed to
be carried out effectively by all shifts involved.
Management involvement in much of the
daily routines was evidenced by their frequent presence in the control room, beginning and
end-of-day meetings, and participation in problem solving meetings.
Management
participation in problem solving meetings also included subsequent
observation of agreed
upon actions to correct the problem.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will
be placed in the NRC Public Document Room.
Should you have any questions regarding
this inspection, please contact me at (215) 337-5211.
Sincerely,
Ape
9'40b020033
940525
'PDR
ADOCK 05000244
6
'DR.,
Glenn W. Meyer, Chief
BWR &PWR Sections
Division of Reactor Safety
Enclosure:
Inspection Report No. 50-244/94-10
OA Gf'Qw
pj(Q
I
MAY z 5 1994
Dr. Robert C. Mecredy
cc w/encl:
R. Smith, Senior Vice President, Production and Engineering
Central Records (5 copies)
Director, Energy and Water Division
State of New York, Department ofLaw-
N. Reynolds, Esquire
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2)
NRC Resident Inspector
State of New York, SLO Designee
bcc w/encl:
Region I Docket Room (with concurrences)
W. Lazarus, DRP
D. Lew, DRP
M. Oprendek, DRP
bcc w/encl (VIAE-MAIL):
W. Dean, OEDO
W. Butler, NRR
M. Shannon, ILPB
M. Campion, ORA
RI:DRS
Bissett/dmg
05/19/94
RI:DRS
Meyer
05%f194
Py; 00-5
~. gati'sJ
OFFICIALRECORD COPY
A:GIN9410.INS