ML17263A654
| ML17263A654 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 05/23/1994 |
| From: | Mecredy R ROCHESTER GAS & ELECTRIC CORP. |
| To: | Andrea Johnson NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 9405270174 | |
| Download: ML17263A654 (7) | |
Text
ACCELERATED DI UTION DEMONS TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9405270174 DOC.DATE: 94/05/23 NOTARIZED: NO FACXL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
AUTH.NAME AUTHOR AFFXLIATION MECREDY,R.C.
Rochester Gas 6 Electric Corp.
RECIP.NAME RECXPXENT AFFXL1ATION JOHNSON,A.R.
Project Directorate I-3
SUBJECT:
Forwards TSIP,showing interfaces w/NRC to support NRC resource allocation,per request during 940311 telcon.
Schedule identifies dates that util intends to submit individual ITS sections for preliminary NRC review.
DISTRIBUTION CODE:
AOOID COPIES RECEIVED:LTR 3 ENCL L SIZE:
TITLE: OR Submittal:
General Distribution NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
t DOCKET 05000244 05000244 D
RECIPIENT ID CODE/NAME PDl-3 LA JOHNSON,A XNTERNAL: NRR/DE/EELB NRR/DRCH/HXCB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS1 EXTERNAL: NRC PDR COPXES LTTR ENCL 1
1 2
2 1
1 1
1 1
1 1
1 1
0 1
1 RECIPIENT ID CODE/NAME PD1-3 PD NRR/DORS/ONDD NRR/DRPW NRR/DSSA/SRXB OC/IEDCB NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
0 1
1 1
1 D
D D
NOTE TO ALL"RIDS" RECIPIENTS:
A D
D PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 16 ENCL 14
t rrrirr/ iiiiiiiir
't ziurilJI rrrrrri ROCHESTER GAS AND ELECTRIC CORPORATION 89 EAST AVENUE, ROCHESTER N.K 14649-0001 ROBERT C MECREDY Vice President Clnna Nuclear Production May 23, 1994 TELEPHONE AREACODE71B 546 2700 U.S. Nuclear Regulatory Commission Document Control Desk Attn:
Allen R. Johnson Project Directorate I-3 Washington, DC 20555
Subject:
Technical Specification Improvement Program (TSIP)
Schedule R.E.
Ginna Nuclear Power Plant Docket No. 50-244
References:
(a)
Letter from R.C. Mecredy, RG&E, to A.R. Johnson, NRC,
Subject:
"Conversion to Improved Technical Specifications",
dated February 28, 1994.
(b)
Teleconference Call Between RG&E (George Wrobel and Mark Flaherty) and NRC (Al Johnson, Chris
- Grimes, Bob Gramm, and Rick Fernandes),
Subject:
"Technical Specification Improvement Program",
March 11, 1994.
(c)
NUREG-1431, Standard Technical Specifications, Westinghouse
- Plants, September 1992.
Dear Mr. Johnson,
Rochester Gas and Electric (RG&E) notified the NRC in Reference (a) of our intent to convert to Improved Technical Specifications (ITS) for Ginna Station.
Subsequent to this, a
conference call was conducted between RG&E and the NRC (Reference b) to'iscuss several issues related to the Technical Specification Improvement Program (TSIP).
During this conference call, RG&E was requested to submit a schedule for the TSIP to support NRC resource allocation.
This letter provides the requested schedule.
RG&E has decided to develop the ITS for Ginna Station on a section-by-section basis.
Individual ITS sections (e.g.,
ITS Section 3.2, Power Distribution Limits) will be prepared and technically reviewed within RG&E.
Following the completion of this review, the proposed section, including the identification and justification of differences with NUREG-1431 (Reference (c)), will be provided to the NRC for preliminary review.
The purpose of this step is to provide the NRC with the opportunity to communicate at, an early stage any concerns with respect to differences from NUREG-1431. It is recommended that this be a relatively "high-level" review on the part of the NRC to allow resolution of potential significant, concerns prior to the submittal of the complete technical specification package.
Any remaining issues can be addressed afte the complete submittal.
- ~"i'405270174;,940523
,',PDR
'yADOCK"05000244 PDR
.~c<p
N 0
0
'a gT I
j h
A copy of the TSIP schedule which shows all interfaces with the NRC staff is attached.
A few clarifications with respect to the schedule are provided below:
(2)
(3)
The schedule identifies the dates that RG&E intends to submit individual ITS sections for preliminary NRC review.
RG&E anticipates that a
new ITS section will be submitted approximately every 3
weeks.
RG&E requests that any NRC concerns or questions be raised within the 3 week window to prevent significant delays with respect to the final submittal.
The use of conference calls or meetings is also encouraged to accelerate identification and resolution of NRC
- concerns, however, RG&E recognizes that all correspondence must be made publicly available.
The schedule includes a separate License Amendment Request (LAR) related to the Design Features ITS section.
This section is being submitted for NRC approval independent of the remaining ITS sections in order to support use of higher enriched fuel for Cycle 25 (i.e., following the 1995 refueling outage).
This LAR will be submitted in July 1994 with NRC approval required before RG&E receipt of new fuel from Westinghouse currently scheduled for early February 1995.
RG&E has decided to implement the ITS while at power to reduce any potential problem which could occur during a refueling outage.
Due to the length and scope of the 1996 steam generator replacement and refueling outage, RG&E expects to be able to conduct additional operator training to support ITS implementation.
Therefore, RG&E plans to implement the ITS a minimum of 2 weeks following completion of the 1996 refueling outage which is currently anticipated to end in early June 1996.
Although dependant upon the final outage schedule, RG&E currently projects July 6, 1996 as the implementation date.
RG&E willalso consider implementation of the ITS prior to the refueling outage if NRC approval is obtained sufficiently early to allow for additional training and procedure/program changes.
- However, we would prefer to not implement the ITS less than 30 days prior to the 1996 refueling outage which is scheduled to begin on or about April 1, 1996.
Please do not hesitate to contact us if you have any questions with respect to the schedule or TSIP.
Very truly yours, Robert C. Mecredy
MDFK609 xc:
U.S. Nuclear Regulatory Commission Mr. Allen R. Johnson (Mail Stop 14Dl)
Project Directorate I-3 Washington, D.C.
20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector Mr. Gene Eckholt Northern States Power Company Prairie Island Nuclear Generating Plant Route 2
- Welch, MN 55089 Mr. Thomas Malanowski Wisconsin Electric Power 231 West Michigan Milwaukee, WI 53201 Ms. Sherry Bernhoft Wisconsin Public Service P.O.
Box 19002 700 North Adams Green Bay, WI 54307-9002
TSIP Task Name 1.0 Use snd A
!ication NRC Review / Maetin 2.0 Safet Umits NRC Review IMeetin 3.0 S acifications snd Surveillance 3.0 LCO and SR A licsbili NRC Review IMaatin 3.1 Resctivit Control S toms NRC Review I Maetin 3.2 Power Distribution Umits NRC Review I Meetin 3.3 instrumentation NRC Review/Meatin 3.4 Reactor Coolant S tem NRC Review / Meetin 3.5 Emer Core Coolin S
NRC Review I Meatin 3.8 Containment S stems NRC Review I Meetin 3.7 Plant S tame NRC Review IMeatin 3.8 Efectricst Power S terna NRC Review IMeatin 3.9 RefueSn 0 arstions NRC Review IMaetin 4.0 Desi n Features Iniesl NRC Submittal 4.0 Desi n Features iFinsli 5.0 Adminstrstive Controls NRC Submittal NRC A royal RGerE Pre aration RGSE Irn lamentation Start Ms /09/94 Oct/28/94 Msr/09/95 Oct/14/94 Feb/15/95 Ms /23/94 Se /29/94 Jsn/25/95 Au /17/94 Nov/21/94 Au /31/94 Dac/13/94 Se /15/94 Jan/03/95 Ms /23/94 Jul/1 3/94 Jun/07/94 Au /03/94 Jun/21/94 Au /24/94 J~8/94 Se /15/94 Jut/20/94 0 t/06/94 Au /03/94 Oct/28/94 Ms /09/94 Juf/06/94 Nov/14/94
~e/94 Ms /11/95 Ms /18/95 Nov/08/95 Jul/08/96 Jul/06/9 6 A r/05/95 Msr/29/95 Msr/15/95 Msr/08/95 Feb/22/95 Fab/22/95 Feb/14/95 Dec/1 9/94 Dec/1 2/94 Jan/09/95 Jsn/02/95 Jsn/31/95 Jan/24/95 Au /09/94 Au /02/94 Au /30/94 Au /23/94 Sa /21/94 Sa /14/94 Oct/1 3/94 Octt05/94 Nov/03/94 Oct/27/94 Nov/28/94 Nov/18/94 Jul/12/94 Jul/1 2/94 Dec/05/94 Dsc/28/94 Ms /17/95 Nov/07/9 5 Feb/27/96 J~/06/96 TSIP (NRC Schedule) 1994 1995 Msy Jun Jul Aug Sep Oct Nov Dec Jsn Feb M
~
~
Printed: Msy/20/94 Page 1
Milestone re, Summery Fixed Delsy
1995 TSIP (NRC Schedule) 1996 Mar Apr Msy Jun Jul Aug Sep Oct Nov Dec Jsn Feb Msr Apr May Jun Jul Printed: Msy/20/94 Page 2 Milestone b,
Summary Fixed Delsy