ACCELERATED DI~~BUTION DEMONSTRATION SYSTEM
~
~ 4 i
Cl REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)
ACCESSION NBR:9405190105 DOC.DATE: 94/04/30 NOTARIZED:
NO FACIL:50-244 Robert Emmet. Ginna Nuclear Plant, Unit 1, Rochester G
AUTH.NAME AUTHOR AFFILIATION PLOOF,R.D.
Rochester Gas 6 Electric Corp.
'IDAY,J.A.
Rochester Gas
!l: Electric Corp.
RECXP.NAME RECIPIENT AFFILIATXON DOCKET 05000244
SUBJECT:
Monthly operating rept for Apr 1994 for RE Ginna Nuclear Power Plant.W/940510 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TXTLE: Monthly Operating Report (per Tech Specs)
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244 D
RECIPIENT XD CODE/NAME PD1-3 PD INTERNAL: AEOD/DOA R+B~Qjy~AB REG FILE 01 EXTERNAL EGS(G BRYCE g J H
NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME JOHNSON,A AEOD/DSP/TPAB NRR/DRIL/RPEB RGN1 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 D
R D
NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LIKES FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 11 ENCL 11
zzprz j uzuzztz
~
jijijj(si/lirrrr ROCHESTER GASANDELECTRICCORPORATION o 89EASTA VENUE, ROCHESTER, N.Y. 14649%001 JOSEPH A. WIDAY Plant Manager Ginna Nuclear Plant TELEPHONE AREA CODE 7 I6 546-2700 GINNA STATION May 10, 1994 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Monthly Report for April, 1994 Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No.
50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of April, 1994.
Very truly yours,
- a. 9 se h A. Wida Plant Manager JAW:tjn Attachments c:
Mr. Thomas T. Martin NRC (1)
Q ElgQQ O q405i~0>
K 05000244 05 rtt40450 eDR nOOCX R
jff
l 5
L'
DOCKET N 50-244 DATE May 11, 1994 COMPLETED BY Ronald D. Ploof TELEPHON (315) 524-4446 Ext.67 E
GST TUS 1.
Unit N R.E. GINNA NUCLEAR POWER PLANT Notes:
2.
Reporting Period April, 1994 3.
Licensed Thermal Power (MWt):
1520 4.
Nameplate Rating (Gross MWo):
490 5.
Design Electric Rating (Net MWo):
470 6.
Maximum Dependable Capacity (Gr 490 7.
Maximum Dependable Capacity (Ne 470 8.
If Changes Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9.
Power Lovel to Which Restricted, If Any (Not MWe):
- 10. Reason For Restrictions, If Any:
This Month Yr.-to-Date Cumulative' 11.
Hours in Reported Period 12.
Number of hours Reactor Was Critical 13.
Reactor Reserve Shutdown Hours 14.
Hours Generator On-line 15.
Unit Reserve Shutdown Hours 16.
Gross Thermal Energy Generated (MWH) 17.
Gross Electrical Energy Generated (MWH) 18.
Not Electrical Energy Generated (MWH) 19.
Unit Service Factor (%)
- 20. Unit Availability Factor (%)
- 21. Unit Capacity Factor (using MDC Not) (%)
- 22. Unit Capacity Factor (using DER Net) (%)
23 Unit Forced Outage Rate (%)
720.0 301.2 0.0 247.4 0.0 283107.0 94581.0 88952.0 34.4 34.4 26.3 26.3 6.2 2855.9 1800.5 0.0 1910.8 0.0 2486791.0 844651.0 801386.0 66.9 66.9 59.7 59.7 2.3 214103.9 170326.9 1688.0
+
167662.8 8.5
'37442804.0 78528010.0 74536759.0 78.3 78.3 75.2 75.2 5.6 24.
Shutdowns Scheduled Over Next 6 Months (Typo, Date and Duration of Each):
- 25. If Shutdown At End of Report Period, Estimate Dato of Startup:
26.
Units in Test Status (Prior to Commercial Operation):
Forcast Achiovod INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
'UMULATIVETOTALCOMMENCING JANUARY 1, 1975
" CUMULATIVETOTALCOMMENCING NOVEMBER 8, 1969
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.
Ginna Nuclear Power Plant DAT Ma 1
1994 COMPLETED BY:
Ronald Plo f TELEPHONE:
315 524-4446 Ext.
673 MONTH A ril 1994 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17.
2.
18.
19.
168 20.
309 5.
21.
429 6.
22.
462 7.
23.
480 8
~
24.
482 9
~
25.
482 10'6.
132 27.
12.
28.
13.
29.
194 14.
30.
479 15'1.
16.
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.
Compute to the nearest whole megawatt.
"I
REPORT hlONTH 4
DO(:KET NO.
I/Nll'NAMl:.R.E. GINNA NUCLEAR POWER PlANT UNIT SHUTDOWN AND POWER REDUCTIONS
(.OhfPLI(1 I'.D BY Rona% KGB 1
1'f:.f fipfI()NI:.315-524-4446 X673 t
J Ho.
Date 0
I r.o e o o oX O~
C0 a0 I
~ o8 ac vt o tt'V7 C
X 0
Cl Licensee Event Report tf Em 0
0 Ill o IA C0 LA a0 Q
o U
Cause 5 Corrective Action to Prevent Recurrence 94'-04 94-05 4-26-94 4-27-94 F
15.6 B
11.5 A
94-008 JB Steam leak on HP Turbine instrument fitting~longer fitting installed.
Main feedwater regulating valve failed to move.
Replaced positioner=
style.
F:
Forced S:
Scheduled stv. 4%$
4949 Reason:
A-Equipment Failure (Explain) 8-hfaintcnance or Test C-Refueling D-Regulatory Restriction E-Operator Training Bt License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 hlcthod:
I-hlanual 2-hlanual Scratn.
3-Automatic Scram.
4-Other (Explain)
Fxhibit G - Instructions for Preparation of Data Entry Shccts for Liccnscc Event Rcport (LER) File (NURE(-
016I)
Exhibit I - Same Source
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E.
Ginna Nuclear Power Plant DATE: Ma 10 1994 COMPLETED BY:
Ronald Ploof TELEPHONE:
315 524-4446 Ext.
673 MONTH A ril 1994 The unit came on-line on 4/18/94 from its annual maintenance and refueling outage and returned to full power on 4/23/94.
On 4/26/94, the unit shutdown
.to repair a
small instrument line steam leak on the HP turbine.
The unit was placed back on-line on 4/27/94.
At approximately 40%
- power, the unit tripped off-line on 4/27/94 on its way to full power due to low S/G level caused by a faulty main feedwater regulatory valve.
The unit was placed back on-line on 4/28/94 and returned to full power on 4/30/94.
4 I'I W'