Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9404190284 DOC.DATE: 94/03/31 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION PLOOF,R. Rochester Gas & Electric Corp.

WIDAY,J.A. Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Mar 1994 for Ginna Nuclaer Power Plant.W/940411 ltr. D DISTRIBUTION CODE IE24D COPIES RECEIVED:LTR ENCL J SIZE-TITLE: Monthly Operating Report (per Tech Specs NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72) . 05000244 A

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD1-3 PD 1 1 JOHNSON,A 1 1 D

INTERNAL: AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 E~/ ORSE OEAB 01 1

1 1

1 NRR/DRIL/RPEB RGN1 1

1 1

1 EXTERNAL: EGGG BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11

rt'~(8/(// 7iPIII Zi( I rim(ZZ ZZ ROCHESTERGASANDELECTRICCORPORATION a 89EASTAVENUEr ROCHESTERr N.Y. 14649<001 JOSEPH A. WIDAY TELEPHONE Plant Monoger GINNA STATION AREA CODE Tr6 546-2700 Ginna Nuclear Plant April ll, 1994 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for March, 1994 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of March, 1994 truly yours,

'ery se h A. Wida Plant Manager JAW:tjn Attachments c: Mr. Thomas T. Martin NRC (1) 400Qj Q E(g 9404190284 tt4033i PDR ADOCK 05000224

,R .,',, PDR

OPERATING DATA REPORT DOCKET NO. 50-244 DATE ~A ril 11 1DDA COMPLETED BY Ronald P loof TELEPHONE 315 524-4446 Ext. 673 OPERATING STATUS 1 ~ Uni t Name: R.E GINNA NUCLEAR RID PLANT Notes: The unit entered its annual refueling 20 Reporting Period: March 1994 outage as scheduled.

3. Licensed Thermal Power (MWt): 1520 4~ Nameplate Rating (Gross MWe): 490
5. Design Electrical Rating (Net MWe): 470
6. Maximm Dependable Capacity (Gross MWe): 490
7. Maximm Dependable Capacity (Het MWe): 470
8. If Changes Occur in Capacity Ratings (Items Hwher 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cmalative

11. Hours In Report Period 744 2160 213 408
12. Number of Hours Reactor Was Critical 1499 170'026
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 1499 167 251.38 15 ~ Unit Reserve Shutdown Hours 8.5 *
16. Gross Thermal Energy Generated (MWH) 116 893 2 203 684 237 159 697
17. Gross Electrical Energy Generated (MWH) 39 702 750 070 78 433 429
18. Net Electrical Energy Generated (HWH) 37 476 712 434 74 447 807
19. Unit Service Factor 11.16% 69.40% 78.37%
20. Unit Availability Factor 11.16/ 69.40% 78.38%
21. Unit Capacity Factor (Using MDC Net) 10.72% 70.18% 75.36%
22. Unit Capacity Factor (Using DER Net) 10.72% 70.18% 70.18%
23. Unit Forced Outage Rate 0/ 0
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refuelin and Maintenance March 4 1994 - duration: 41 da s.

25. If Shut Down At End of Report Period, Estimated Date of Startup: April 14, 1994
26. Units In Test Status (Prior to Cottmerciai Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975 CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969

RAGE DAILY UNIT POWER L L DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: A ril ll 1994 COMPLETED BY:

Ronald Ploof TELEPHONE: 315 524-4446 Ext. 673 MONTH March 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 480 17.

2. 479 18.
3. 476 19.
4. 290 20.
5. 21.
6. 22.
7. 23.
8. 24.
9. 25.
10. 26.

27.

12. 28.
13. 29.
14. 30.
15. 31.

16.

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month. Compute to the nearest whole megawatt.

DO(.KET NO S0-244 (INITNAME R.E. GINNA NUCLEAR POWER.-PLANT

)ATI 4/11/94 UNIT SHUTDOWN AND POWER REDUCTIONS (:OhlPLI-:1'I:.D BY I REPORT MONTH March TELEPIIONE( 315 ) 524-4446 Ext ~ 673 Pl CV tR>>0 ocu0 c IA 0 Cause 5 Corrective 0 4 L

c 0

Licensee E~

0 c Ho. 4 0 0 0.

04 4 Event VI 0

0 0

0 0 Action to 4 Report 0 Prevent Recurrence I 4cn c 4I lA U

n0 4-03 4/4/94 S 1681 C Annual Refueling 2 .3 F: Forced Reason: hlcthod: Fxhibit G - Instructions S: Scheduled . A-Equipment Failure (Explain) I -hlanual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NURE(-

D-Regulatory Restriction 4-Other (Explain) 01 Cil )

E-Operator Training & Liccnsc Examination F-Administrative G-Operational Error (Explain)

Rtv. 4/8$ I$4% H-Other (Explain) 'Exhibit I - Same Source

NARRATXVE SVMM2QtY OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: A COMPLETED BY:

ril 11 1994 Ronald Ploof TELEPHONE: 315 524-4446 Ext. 673 MONTH March 1994 During the first 4 days of March the average power level was 98%.

On March 4, the unit was taken off line as scheduled for its annual maintenance and refueling outage.