ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9404190284 DOC.DATE: 94/03/31 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH.NAME AUTHOR AFFILIATION PLOOF,R.

Rochester Gas

& Electric Corp.

WIDAY,J.A.

Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Mar 1994 for Ginna Nuclaer Power Plant.W/940411 ltr.

DISTRIBUTION CODE IE24D COPIES RECEIVED:LTR ENCL J

SIZE-TITLE: Monthly Operating Report (per Tech Specs D

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72) 05000244 A

RECIPIENT ID CODE/NAME PD1-3 PD INTERNAL: AEOD/DOA

/

ORS OEAB E~

E 01 EXTERNAL: EGGG BRYCE,J.H NSIC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME JOHNSON,A AEOD/DSP/TPAB NRR/DRIL/RPEB RGN1 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 D

D D

NOTE TO ALL"RIDS" RECIPIENTS:

D D

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 11 ENCL 11

rt'~(8/(// 7iPIII Zi(

I rim(ZZ ZZ ROCHESTERGASANDELECTRICCORPORATION a 89EASTAVENUEr ROCHESTERr N.Y. 14649<001 JOSEPH A. WIDAY Plant Monoger Ginna Nuclear Plant GINNA STATION April ll, 1994 TELEPHONE AREACODE Tr6 546-2700 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for March, 1994 Operating Status Information R.

E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of March, 1994

'ery truly yours, se h A. Wida Plant Manager JAW:tjn Attachments c:

Mr. Thomas T. Martin NRC (1) 400Qj Q 9404190284 tt4033i PDR ADOCK 05000224

,R PDR E(g

OPERATING DATA REPORT COMPLETED BY DOCKET NO.

50-244 DATE ~A ril 11 1DDA OPERATING STATUS Ronald P loof TELEPHONE 315 524-4446 Ext. 673 1 ~

20 3.

4 ~

5.

6.

7.

8.

Unit Name:

R.E GINNA NUCLEAR RID PLANT Reporting Period:

March 1994 Licensed Thermal Power (MWt):

Nameplate Rating (Gross MWe):

Design Electrical Rating (Net MWe):

Maximm Dependable Capacity (Gross MWe):

Maximm Dependable Capacity (Het MWe):

If Changes Occur in Capacity Ratings (Items Notes:

The unit entered its annual refueling outage as scheduled.

1520 490 470 490 470 Hwher 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level to Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cmalative 11.

12.

13.

14.

15 ~

16.

17.

18.

19.

20.

21.

22.

23.

Hours In Report Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (HWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate 744 116 893 39 702 37 476 11.16%

11.16/

10.72%

10.72%

0/

2160 1499 213 408 170'026 1499 2 203 684 750 070 712 434 69.40%

69.40%

167 251.38 8.5 237 159 697 78 433 429 74 447 807 78.37%

78.38%

70.18%

0 70.18%

70.18%

75.36%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refuelin and Maintenance March 4 1994 - duration:

41 da s.

25.

If Shut Down At End of Report Period, Estimated Date of Startup:

April 14, 1994 26.

Units In Test Status (Prior to Cottmerciai Operation):

Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975 CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969

RAGE DAILY UNIT POWER L L

DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: A ril ll 1994 COMPLETED BY:

Ronald Ploof TELEPHONE:

315 524-4446 Ext.

673 MONTH March 1994 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 480 17.

2.

479 18.

3.

4.

476 290 19.

20.

5.

21.

6.

22.

7.

23.

8.

24.

9.

25.

10.

26.

27.

12.

28.

13.

29.

14.

30.

15.

31.

16.

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.

Compute to the nearest whole megawatt.

UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH March DO(.KET NO S0-244 (INITNAME R.E. GINNA NUCLEAR POWER.-PLANT

)ATI 4/11/94

(:OhlPLI-:1'I:.D BY I

TELEPIIONE( 315 ) 524-4446 Ext ~

673 Ho.

4 I

0 4L0 0

CV c0 0.

4 Pl tR>>0 ocu0 04 4 4cn c 0n Licensee Event Report 4I E~

0 0

VI 00 lA c0 IA c00 0

U Cause 5 Corrective Action to Prevent Recurrence 4-03 4/4/94 S

1681 C

Annual Refueling F: Forced S:

Scheduled Rtv. 4/8$ I$4%

2 Reason:

. A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & Liccnsc Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

.3 hlcthod:

I-hlanual 2-Manual Scram.

3-Automatic Scram.

4-Other (Explain)

Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NURE(-

01 Cil )

'Exhibit I - Same Source

NARRATXVE SVMM2QtY OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: A ril 11 1994 COMPLETED BY:

Ronald Ploof TELEPHONE:

315 524-4446 Ext.

673 MONTH March 1994 During the first 4 days of March the average power level was 98%.

On March 4,

the unit was taken off line as scheduled for its annual maintenance and refueling outage.